80KSC020R0024 LC39B ECS Amendment 04 Slip Pages.pdf

PDF 29 KB Posted

Attached to
Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B Federal contract opportunity
Solicitation number
80KSC020R0024
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

This document contains a solicitation for an upgrade to the Environmental Control System at Launch Complex 39B at NASA's Kennedy Space Center in Florida. NASA requires the upgrade of the ECS to support the crewed Space Launch System Artemis II mission. The scope of work includes replacing the existing cooling tower and relocating ductwork, heaters, and instrumentation. It also involves adding new heaters and high pressure ducts, replacing filter housings and valves, modifying gaseous nitrogen piping and controls systems hardware, and installing new humidifiers. Offers for the base proposal are due by July 14, 2020 and must be completed within 180 days of the Post-Artemis 1 Launch notice to proceed, anticipated on July 1, 2021. An alternate proposal with a 150 day completion period is also requested. The solicitation is a full and open, lowest price technically acceptable procurement.

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B, newest first.
File Type Posted
Questions And Answers 4.pdf PDF
80KSC020R0024 Amendment 0008 Conformed Solicitation.pdf PDF
80KSC020R0024 LC39B ECS Amendment 08 Slip page.pdf PDF
80KSC020R0024 ECS at LC39B Questions And Answers 1 to 4.pdf PDF
80KSC020R0024 Amendment 0008 with Attachments.pdf PDF
80KSC020R0024 Amendment 0007 with Attachments.pdf PDF
80KSC020R0024 Attachment J-C Wage Determination.pdf PDF
80KSC020R0024 Amendment 0007 Conformed Solicitation.pdf PDF
80KSC020R0024 LC39B ECS Amendment 07 Slip Page.pdf PDF
Questions And Answers 3.pdf PDF
80KSC020R0024 Amendment 0006 Conformed Solicitation.pdf PDF
80KSC020R0024 Amendment 0006 with Attachments.pdf PDF
80KSC020R0024 ECS at LC39B Questions And Answers 1 to 3.pdf PDF
80KSC020R0024 LC39B ECS Amendment 06 Slip Pages.pdf PDF
80KSC020R0024 ECS at LC39B Questions And Answers 1 and 2.pdf PDF
Questions And Answers 2.pdf PDF
80KSC020R0024 Amendment 0005 with Attachments.pdf PDF
80KSC020R0024 LC39B ECS Amendment 05 Slip Pages.pdf PDF
80KSC020R0024 Amendment 0005 Conformed Solicitation.pdf PDF
80KSC020R0024 Amendment 0004 with Attachments.pdf PDF
Questions And Answers 1.pdf PDF
80KSC020R0024 Amendment 0004 Conformed Solicitation.pdf PDF
Example Submittal Matrix.xlsx XLSX spreadsheet
80KSC020R0024 J-B Amend 0003 Conformed.pdf PDF
80KSC020R0024 J-A Amend 0003 Conformed.pdf PDF
80KSC020R0024 Amendment 0003 with Attachments.pdf PDF
ECS Site Visit Attendence.pdf PDF
80KSC020R0024 Amendment 0002.pdf PDF
80KSC020R0024 LC39B ECS Amendment 02 Slip Page.pdf PDF
80KSC020R0024 Amendment 0002 Conformed Solicitation.pdf PDF
80KSC020R0024 LC39B ECS Amendment 01 Slip Pages.pdf PDF
Section L Appendix 6 Badging Request Form (Includes TAA).docx DOCX document
80KSC020R0024 Amendment 0001.pdf PDF
80KSC020R0024 Amendment 0001 Conformed Solicitation.pdf PDF
Section L Appendix 2 Acceptable Identity Guide.pdf PDF
80KSC020R0024 Attachment J-D Progress Payments.pdf PDF
80KSC020R0024 Attachment J-C Wage Determination.pdf PDF
Section L Appendix 3 Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Section L Appendix 1 KSC Form 28-889 Visitor Badge Request.pdf PDF
80KSC020R0024 ECS Solicitation.pdf PDF
80KSC020R0024 Attachment J-A Deliverables.pdf PDF
80KSC020R0024 Attachment J-G Badging ID Process.pdf PDF
Section L Appendix 5 Small Business Subcontracting Goals.docx DOCX document
Section L Appendix 4 PPQs.docx DOCX document
80KSC020R0024 Attachment J-B Project Requirements.pdf PDF
80KSC020R0024 Attachment J-J JOFOC.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

80KSC020R0024

TBD

John F. Kennedy Space Center, NASA Procurement Office Code: OP-CS Kennedy Space Center, FL 32899

The contractor shall furnish all labor, equipment, materials, and related activities necessary to upgrade the Environmental Control System at Launch Complex 39-B at Kennedy Space Center, Florida.

This is a Full and Open, Lowest Price Technically Acceptable (LPTA) procurement.

Offeror MUST enter their cage code and DUNS number in block 14, page 2 of the SF 1442.

Offeror MUST be registered SAM and VETS-4212.

Offeror MUST submit electronic offer as specified in section L.15.

KSC-IDIQbids@mail.nasa.gov Attn: C. M. Julius Williams John F. Kennedy Space Center, NASA Procurement Office Code: OP-CS Bldg M7-0301, Room: 5416A Kennedy Space Center, FL 32899

4200729166

OP-CS

C. M. Julius Williams, Contracting Officer (321) 861-2661

99263

1 7406/01/2020

07/14/2020

2:00 PM

*Section F.1

NASA/KSC SOLICITATION 80KSC020R0024

SECTION F – DELIVERIES OR PERFORMANCE

F.1 FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

INCORPORATED BY REFERENCE

FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

Fill-Ins:

(a) The Contractor shall be required to (a) commence work under this contract immediately after the date the Contractor receives the notice to proceed.

(c) See table below:

Contract Line Item Time Stated for Completion

Base Proposal (180 day Post-Artemis 1 Launch Performance Period)

Complete the entire Pre-Artemis I launch work as defined in the contract drawings and specifications for use not later than the Artemis 1 Launch which is currently scheduled for July 1, 2021. The completion date is based on the assumption that the successful offeror will receive the Pre- Artemis 1 Launch notice to proceed by July August 31, 20201.

Complete the physical on site Post-Artemis 1 Launch work as defined in the contract drawings and specification for use not later than 180 calendar days after the date the contractor receives the Post-Artemis Launch notice to proceed (a second NTP). NTP for Post-Artemis 1 Launch is anticipated to be issued on or about July 1, 2021.

Alternate Proposal (150 day Post- Artemis 1 Launch Performance Period)

Complete the entire Pre-Artemis I launch work as defined in the contract drawings and specifications for use not later than the Artemis 1 Launch which is currently scheduled for July 1, 2021. The completion date is based on the assumption that the successful offeror will receive the Pre- Artemis 1 Launch notice to proceed by July August 31, 20201.

Complete the physical on site Post-Artemis 1 Launch work as defined in the contract drawings and specification for use not later than 150 calendar days after the date the contractor receives the Post-Artemis 1 Launch notice to proceed (a second NTP). NTP for the Post-Artemis 1 Launch work is anticipated to be issued on or about July 1, 2021.

FAR 52.242-14 SUSPENSION OF WORK (APR 1984)

F.2 WORK PERIOD

The contractor will determine the work schedule best suited for completion of the identified tasks in the timeframe allotted. The contractor shall coordinate work hours with the Contracting Officer prior to implementation. All mandatory inspections by the Government are to be scheduled during normal work hours. Any other work period outside the coordinated work hours will require special/ written approval from the Contracting Officer seven (7) days in advance of proposed change in work periods.

(End of Clause)

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICE TO OFFERORS OR RESPONDENTS

Appendix 2 Acceptable Identity Guide for KSC Badging Appendix 3 Pre-Proposal Inquiry Form Appendix 4 Past Performance Questionnaire Appendix 5 Small Business Subcontracting Goals Appendix 6 Badging Request Form (Includes TAA)

(End of Provision)

L.11 FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.

(b) The use in this solicitation of any NASA Federal Acquisition Regulation Supplement (48 CFR

Chapter 18) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

(End of provision)

L.12 NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) PROVISIONS INCORPORATED BY

REFERENCE

PROVISION NO. TITLE

NFS 1852.233-70 PROTESTS TO NASA (DEC 2015)

L.13 NFS 1852.215-81 PROPOSAL PAGE LIMITATIONS (APR 2015)

(a) The following page limitations are established for each portion of the proposal submitted in response to this solicitation.

Proposal Section Page Limit

Proposal Price Volume No page limit Base Proposal Non-Price Volume/Project Execution Plan

Limited to 10 pages

Alternate Proposal Non-Price Volume/Project Execution Plan

Limited to 10 pages

Non-Price Volume/Technical Experience Summary Applicable to both the Base and Alternate Proposals - (Optional Requirement)

Limited to one (1) page at the beginning of the volume for introduction and summary of all projects - (Optional requirement)

Non-Price Volume/Technical Experience Summary Applicable to both the Base and Alternate Proposals

Limited to two (2) pages per each project identified in the Technical Experience Summary

Non-Price Volume/Page 1 of Past Performance Questionnaires Applicable to both the Base and Alternate Proposals

Limited to page 1 of each Past Performance Questionnaire mailed to each customer

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICE TO OFFERORS OR RESPONDENTS

currently being performed or successfully completed within seven years of the date of issuance of this solicitation June 01, 2020 (may include federal, state, local government, and / or private projects) similar in content and complexity to this Government acquisition. Joint ventures can provide contracts/projects performed by either the controlling or non-controlling joint venture entity or a combination of contracts/projects performed by each entity. For submittal purposes, a task order on an indefinite-delivery indefinite-quantity (IDIQ) contract or basic ordering agreement (BOA) is considered a “contract or project”. IDIQ contracts and BOAs are not considered a “contract or project.”

(2) Offers proposing contractor teaming arrangement(s) with one or more major subcontractor(s) shall identify the scope of work that will be performed by the prime contractor and the scope of work that will be performed by the major subcontractor(s). In addition to the five contracts/projects performed by the prime contractor, in paragraph 1 above, offerors shall identify in the Technical Experience Summary three contracts/projects currently being performed or successfully completed by the major subcontractor(s) within the past seven years of the date of issuance of this solicitation, June 01, 2020 (may include federal, state, local Government and / or private jobs) similar in content and complexity to the applicable work under this Government acquisition. (A major subcontractor is defined as a subcontractor performing 30% or more of the contract work.)

(3) In addition to the five contracts/projects performed by the prime contractor, in paragraph 1 above, offerors shall identify in the Technical Experience Summary three contracts/projects currently being performed or successfully completed by any proposed MEI subcontractors identified in the project execution plan within the past seven years of the date of issuance of this solicitation, June 01, 2020 (may include federal, state, local Government and / or private jobs).

(4) The Technical Experience Summary shall be limited to two pages of information for each completed contract/project (a one page introductory and/or summary page may be included with the Technical Experience Summary) and include the following information for each referenced contract or project:

Name of contract/project and contract/project number

Contract/project performance period as initially awarded (dates)

Completed performance period (dates). If contract/project is not completed provide the percentage of construction work that has been completed

Place of contract/project performance

Name and address of customer or Government Agency

Name, telephone number and e-mail address of Contracting Officer or equivalent customer contact

Dollar value of contract/project as initially awarded and at contract/project completion. If work was performed as a subcontractor identify the dollar value of the subcontracted work.

File details come from the government source that posted it. Updated .