80KSC020R0024 Amendment 0008 with Attachments.pdf

PDF 655 KB Posted

Attached to
Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B Federal contract opportunity
Solicitation number
80KSC020R0024
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

This document provides details of a solicitation for the upgrade of the Environmental Control System at Launch Complex 39B at the Kennedy Space Center. The solicitation seeks proposals to modify the existing ECS to provide conditioned and purified air to support crewed launches on the new Space Launch System Artemis II mission. Key work includes replacing the cooling tower, relocating ductwork and equipment, adding new heaters and high pressure ducts, replacing filter housings and valves, modifying gaseous nitrogen piping from aluminum to stainless steel, updating controls systems, and installing new humidifiers. Proposals were due by July 14, 2020. The National Aeronautics and Space Administration is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B, newest first.
File Type Posted
80KSC020R0024 LC39B ECS Amendment 08 Slip page.pdf PDF
Questions And Answers 4.pdf PDF
80KSC020R0024 Amendment 0008 Conformed Solicitation.pdf PDF
80KSC020R0024 ECS at LC39B Questions And Answers 1 to 4.pdf PDF
80KSC020R0024 LC39B ECS Amendment 07 Slip Page.pdf PDF
80KSC020R0024 Amendment 0007 Conformed Solicitation.pdf PDF
80KSC020R0024 Amendment 0007 with Attachments.pdf PDF
80KSC020R0024 Attachment J-C Wage Determination.pdf PDF
80KSC020R0024 ECS at LC39B Questions And Answers 1 to 3.pdf PDF
80KSC020R0024 LC39B ECS Amendment 06 Slip Pages.pdf PDF
80KSC020R0024 Amendment 0006 with Attachments.pdf PDF
Questions And Answers 3.pdf PDF
80KSC020R0024 Amendment 0006 Conformed Solicitation.pdf PDF
Questions And Answers 2.pdf PDF
80KSC020R0024 ECS at LC39B Questions And Answers 1 and 2.pdf PDF
80KSC020R0024 Amendment 0005 with Attachments.pdf PDF
80KSC020R0024 LC39B ECS Amendment 05 Slip Pages.pdf PDF
80KSC020R0024 Amendment 0005 Conformed Solicitation.pdf PDF
80KSC020R0024 Amendment 0004 with Attachments.pdf PDF
80KSC020R0024 LC39B ECS Amendment 04 Slip Pages.pdf PDF
Questions And Answers 1.pdf PDF
80KSC020R0024 Amendment 0004 Conformed Solicitation.pdf PDF
80KSC020R0024 J-A Amend 0003 Conformed.pdf PDF
80KSC020R0024 J-B Amend 0003 Conformed.pdf PDF
Example Submittal Matrix.xlsx XLSX spreadsheet
80KSC020R0024 Amendment 0003 with Attachments.pdf PDF
ECS Site Visit Attendence.pdf PDF
80KSC020R0024 LC39B ECS Amendment 01 Slip Pages.pdf PDF
Section L Appendix 6 Badging Request Form (Includes TAA).docx DOCX document
80KSC020R0024 Amendment 0002.pdf PDF
80KSC020R0024 LC39B ECS Amendment 02 Slip Page.pdf PDF
80KSC020R0024 Amendment 0002 Conformed Solicitation.pdf PDF
80KSC020R0024 Amendment 0001.pdf PDF
80KSC020R0024 Amendment 0001 Conformed Solicitation.pdf PDF
Section L Appendix 3 Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Section L Appendix 1 KSC Form 28-889 Visitor Badge Request.pdf PDF
80KSC020R0024 ECS Solicitation.pdf PDF
80KSC020R0024 Attachment J-A Deliverables.pdf PDF
Section L Appendix 2 Acceptable Identity Guide.pdf PDF
80KSC020R0024 Attachment J-D Progress Payments.pdf PDF
80KSC020R0024 Attachment J-C Wage Determination.pdf PDF
80KSC020R0024 Attachment J-G Badging ID Process.pdf PDF
Section L Appendix 5 Small Business Subcontracting Goals.docx DOCX document
Section L Appendix 4 PPQs.docx DOCX document
80KSC020R0024 Attachment J-B Project Requirements.pdf PDF
80KSC020R0024 Attachment J-J JOFOC.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

NASA/KSC SOLICITATION 80KSC020R0024

SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT

Sheet Zone Item From To

I-523 D/4&3 Cable 35426W54 Existing New I-523 B/4&3 Cable 35426W61 Existing New I-524 C/8 through 5 Enclosure Connector J54, First 7 columns Regular text Bold Text I-524 C/8 through 5 Enclosure Connector J61, First 7 columns Regular text Bold Text I-529 A/7&6 Cable 35427W38 New Existing I-529 A/7&6 Cable 35427W38 Delete Flag Note F I-530 E/7&6 Enclosure Connector J38, Columns 2 through 7 Regular text Bold Text I-537 D/7&6 Cable 37568W28 New Existing I-538 C/6 Enclosure Connector J61, J63, & J64, Column 2 Bold Text Regular Test I-543 A thru C/7 thru 5 Cable 37462W29 through 37462W36 New Existing I-543 A thru C/7 thru 5 Cable 37462W29 through 37462W36 Delete Flag Note A I-543 G&H/4 thru 2 Cable 37462W37 through 37462W42 New Existing I-543 G&H/4 thru 2 Cable 37462W37 through 37462W42 Delete Flag Note A I-543 B thru E/4 thru 2 Cable 37462W47 through 37462W60 New Existing I-543 B thru E/4 thru 2 Cable 37462W47 through 37462W60 Delete Flag Note A M-206 F-7 A Number A601046 A601106 M-206 F-7 A Number A601047 A601107 M-206 F-7 A Number A601048 A601108 M-206 D5/6 A Number A601050 A601110 M-206 D5/6 A Number A601051 A601111 M-206 D5/6 A Number A601052 A601112 M-206 D5/6 A Number A601053 A601113 M-206 H-3 A Number A601049 A601109 M-206 F-3 A Number A601054 A601114

(6) Drawing Number 79K40792, Reference Sheet M-508, Zones B thru C/5 thru 4, item “NEW

GN2 FILTER SCHEDULE”, two cells under “DESCRIPTION/MODEL” column, is changed from:

100% EFFICIENT AT 70 MICRONS AND 98% EFFICIENT AT 40 MICRONS, ASTM

B31.3 COMPLIANT. BASIS OF DESIGN IS CUSTOM MANUFACTURED FROM

VACCO OR APPROVED EQUAL. PROVIDE WITH TWO S.S. TAPS AND

DIFFERENTIAL PRESSURE GAUGE (0-5PSI) AND 1/4” STAINLESS STEEL TUBING

AND TWO S.S. TUBING SHUT-OFF VALVES.

To:

100% EFFICIENT AT 70 MICRONS AND 98% EFFICIENT AT 40 MICRONS, ASTM

B31.3 COMPLIANT. BASIS OF DESIGN IS CUSTOM MANUFACTURED FROM

NORMAN FILTER COMPANY OR APPROVED EQUAL. PROVIDE WITH TWO S.S.

TAPS AND DIFFERENTIAL PRESSURE GAUGE (0-5PSI) AND 1/4” STAINLESS STEEL

TUBING AND TWO S.S.TUBING SHUT-OFF VALVES.

(c) "Or Equal" Items”

Throughout the technical specifications and drawings of this contract, where certain

PRE PROPOSAL QUESTIONS AND ANSWERS 80KSC020R0024

Amendment 0008

No

Reference for Question (Section

Paragraph/Page) QUESTIONS ANSWERS Amendment

Number

49 M-508

Drawing M-508 provides a brief specification of the panel filters and says custom made by VACCO or approved equal. Must be B31.3 compliant.

The VACCO representative is declining to bid the project. Are comparable products from the following manufacturers be acceptable:

3B, Norman. Please concur or advise.

On drawing M-508 NEW GN2 FILTER SCHEDULE, the two cells under “DESCRIPTION/MODEL” column are changed to:

"100% EFFICIENT AT 70 MICRONS AND 98% EFFICIENT

AT 40 MICRONS, ASTM B31.3 COMPLIANT. BASIS OF

DESIGN IS CUSTOM MANUFACTURED FROM NORMAN

FILTER COMPANY OR APPROVED EQUAL. PROVIDE

WITH TWO S.S. TAPS AND DIFFERENTIAL PRESSURE

GAUGE (0-5PSI) AND 1/4” STAINLESS STEEL TUBING

AND TWO S.S.TUBING SHUT-OFF VALVES."

See updated Drawings via Solicitation Section C.2(b)(6).

50 Amendment 0006, Question 16

Please confirm that PVC jacket .030 is to be used on all double wall flange insulation kits over pyrogel for ECS ducts in the tunnel and above grade? Note: Detail MBY on M- 615 states use Stainless jacket over pyrogel. If stainless jacket is be used what is the thickness required?

Stainless steel jacketing is required for all flange insulation applications on double-wall aluminum and double-wall stainless steel ducts in the tunnels and above the bulkhead plate and shall be minimum 0.016” thick. PVC jacketing is allowed on the interior single-wall ducts only.

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0008
Code[0]: KSC
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: C. M. Julius Williams, Contracting Officer
Description[0]: The purpose of Amendment 0008 is to:

A) Provide Government answers to submitted questions; see attached "Questions & Answers 4," 1 page attached.

B) Update solicitation section C.2 paragraph (b); see attached "Slip Page," 1 page attached.

C) Proposal due date and time remain unchanged at July 14, 2020 by 2:00 PM EST.

Note: For Reference, “80KSC020R0024 ECS at LC39B Questions And Answers 1 to 4” (7 pages) and a conformed copy of the full solicitation (76 pages) are individually and separately uploaded to beta.SAM.gov.

FacilityCode[0]:
Code[2]: KSC
IssuedBy[0]: NASA/John F. Kennedy Space Center

Office of Procurement Mail Code OP-CS

KENNEDY SPACE CENTER FL, 32899

NameandAddress[0]:
AdministeredBy[0]: NASA/John F. Kennedy Space Center

Office of Procurement Mail Code OP-CS

KENNEDY SPACE CENTER FL, 32899

ContractIDCode[0]:
ReqNumber[0]: 4200729166
AmendmentNo[1]: 80KSC020R0024
ModificationNo[0]:
ProjectNo[0]: 99263
Page[0]: 1
Pages[0]: 1
EffectiveDate[0]: July 10, 2020
Dated9B[0]: June 1, 2020
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
2020-07-10T16:16:53-0400
CHRISTOPHER WILLIAMS
DateSigned[0]:
DateSigned[1]: Jul 10, 2020
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .