80KSC020R0024 LC39B ECS Amendment 08 Slip page.pdf

PDF 14 KB Posted

Attached to
Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B Federal contract opportunity
Solicitation number
80KSC020R0024
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

This document contains details for a federal solicitation to upgrade the Environmental Control System at Launch Complex 39B. The solicitation is being issued by the National Aeronautics and Space Administration Kennedy Space Center to support upgrading the ECS to condition purge air for the new Space Launch System vehicle on upcoming Artemis missions. The project scope includes replacing the existing cooling tower and filter housings, relocating ductwork and instrumentation, adding new heaters and high pressure ducts, replacing aluminum gaseous nitrogen piping with stainless steel, modifying controls systems hardware, and installing new humidifiers. The document provides specification changes for drawings and filter descriptions. Responses to the solicitation are due by the date listed on the cover page.

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B, newest first.
File Type Posted
80KSC020R0024 Amendment 0008 with Attachments.pdf PDF
80KSC020R0024 ECS at LC39B Questions And Answers 1 to 4.pdf PDF
Questions And Answers 4.pdf PDF
80KSC020R0024 Amendment 0008 Conformed Solicitation.pdf PDF
80KSC020R0024 Amendment 0007 Conformed Solicitation.pdf PDF
80KSC020R0024 LC39B ECS Amendment 07 Slip Page.pdf PDF
80KSC020R0024 Amendment 0007 with Attachments.pdf PDF
80KSC020R0024 Attachment J-C Wage Determination.pdf PDF
80KSC020R0024 Amendment 0006 with Attachments.pdf PDF
80KSC020R0024 ECS at LC39B Questions And Answers 1 to 3.pdf PDF
80KSC020R0024 LC39B ECS Amendment 06 Slip Pages.pdf PDF
Questions And Answers 3.pdf PDF
80KSC020R0024 Amendment 0006 Conformed Solicitation.pdf PDF
Questions And Answers 2.pdf PDF
80KSC020R0024 Amendment 0005 with Attachments.pdf PDF
80KSC020R0024 LC39B ECS Amendment 05 Slip Pages.pdf PDF
80KSC020R0024 Amendment 0005 Conformed Solicitation.pdf PDF
80KSC020R0024 ECS at LC39B Questions And Answers 1 and 2.pdf PDF
80KSC020R0024 Amendment 0004 Conformed Solicitation.pdf PDF
Questions And Answers 1.pdf PDF
80KSC020R0024 LC39B ECS Amendment 04 Slip Pages.pdf PDF
80KSC020R0024 Amendment 0004 with Attachments.pdf PDF
80KSC020R0024 J-B Amend 0003 Conformed.pdf PDF
80KSC020R0024 J-A Amend 0003 Conformed.pdf PDF
80KSC020R0024 Amendment 0003 with Attachments.pdf PDF
ECS Site Visit Attendence.pdf PDF
Example Submittal Matrix.xlsx XLSX spreadsheet
80KSC020R0024 LC39B ECS Amendment 01 Slip Pages.pdf PDF
Section L Appendix 6 Badging Request Form (Includes TAA).docx DOCX document
80KSC020R0024 Amendment 0002.pdf PDF
80KSC020R0024 LC39B ECS Amendment 02 Slip Page.pdf PDF
80KSC020R0024 Amendment 0002 Conformed Solicitation.pdf PDF
80KSC020R0024 Amendment 0001 Conformed Solicitation.pdf PDF
80KSC020R0024 Amendment 0001.pdf PDF
Section L Appendix 3 Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
80KSC020R0024 ECS Solicitation.pdf PDF
80KSC020R0024 Attachment J-A Deliverables.pdf PDF
Section L Appendix 1 KSC Form 28-889 Visitor Badge Request.pdf PDF
80KSC020R0024 Attachment J-G Badging ID Process.pdf PDF
Section L Appendix 5 Small Business Subcontracting Goals.docx DOCX document
Section L Appendix 4 PPQs.docx DOCX document
80KSC020R0024 Attachment J-B Project Requirements.pdf PDF
80KSC020R0024 Attachment J-J JOFOC.pdf PDF
80KSC020R0024 Attachment J-C Wage Determination.pdf PDF
Section L Appendix 2 Acceptable Identity Guide.pdf PDF
80KSC020R0024 Attachment J-D Progress Payments.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NASA/KSC SOLICITATION 80KSC020R0024

SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT

Sheet Zone Item From To

I-523 D/4&3 Cable 35426W54 Existing New I-523 B/4&3 Cable 35426W61 Existing New I-524 C/8 through 5 Enclosure Connector J54, First 7 columns Regular text Bold Text I-524 C/8 through 5 Enclosure Connector J61, First 7 columns Regular text Bold Text I-529 A/7&6 Cable 35427W38 New Existing I-529 A/7&6 Cable 35427W38 Delete Flag Note F I-530 E/7&6 Enclosure Connector J38, Columns 2 through 7 Regular text Bold Text I-537 D/7&6 Cable 37568W28 New Existing I-538 C/6 Enclosure Connector J61, J63, & J64, Column 2 Bold Text Regular Test I-543 A thru C/7 thru 5 Cable 37462W29 through 37462W36 New Existing I-543 A thru C/7 thru 5 Cable 37462W29 through 37462W36 Delete Flag Note A I-543 G&H/4 thru 2 Cable 37462W37 through 37462W42 New Existing I-543 G&H/4 thru 2 Cable 37462W37 through 37462W42 Delete Flag Note A I-543 B thru E/4 thru 2 Cable 37462W47 through 37462W60 New Existing I-543 B thru E/4 thru 2 Cable 37462W47 through 37462W60 Delete Flag Note A M-206 F-7 A Number A601046 A601106 M-206 F-7 A Number A601047 A601107 M-206 F-7 A Number A601048 A601108 M-206 D5/6 A Number A601050 A601110 M-206 D5/6 A Number A601051 A601111 M-206 D5/6 A Number A601052 A601112 M-206 D5/6 A Number A601053 A601113 M-206 H-3 A Number A601049 A601109 M-206 F-3 A Number A601054 A601114

(6) Drawing Number 79K40792, Reference Sheet M-508, Zones B thru C/5 thru 4, item “NEW

GN2 FILTER SCHEDULE”, two cells under “DESCRIPTION/MODEL” column, is changed from:

100% EFFICIENT AT 70 MICRONS AND 98% EFFICIENT AT 40 MICRONS, ASTM

B31.3 COMPLIANT. BASIS OF DESIGN IS CUSTOM MANUFACTURED FROM

VACCO OR APPROVED EQUAL. PROVIDE WITH TWO S.S. TAPS AND

DIFFERENTIAL PRESSURE GAUGE (0-5PSI) AND 1/4” STAINLESS STEEL TUBING

AND TWO S.S. TUBING SHUT-OFF VALVES.

To:

100% EFFICIENT AT 70 MICRONS AND 98% EFFICIENT AT 40 MICRONS, ASTM

B31.3 COMPLIANT. BASIS OF DESIGN IS CUSTOM MANUFACTURED FROM

NORMAN FILTER COMPANY OR APPROVED EQUAL. PROVIDE WITH TWO S.S.

TAPS AND DIFFERENTIAL PRESSURE GAUGE (0-5PSI) AND 1/4” STAINLESS STEEL

TUBING AND TWO S.S.TUBING SHUT-OFF VALVES.

(c) "Or Equal" Items”

Throughout the technical specifications and drawings of this contract, where certain

File details come from the government source that posted it. Updated .