This is a structural framing plan drawing (S203) showing enlarged floor plans for steam tunnel vaults at a VA facility in Des Moines, IA. The drawing details six vault sections - two in the South Tunnel (Vaults 1-2) and four in the North Tunnel (Vaults 3-6), drawn at a scale of 1/4" = 1'-0".
The plans include specific dimensional details and structural elements marked with designations like CB1, CB5, CB6, and CB7. The drawing was prepared by IMEG and Anderson as the designers of record, with Landmark also listed as a consultant. The document is marked as "100% FINAL BID DOCUMENT" dated 02/07/2025, with Revision #1 dated 2/5/2025. The project number is 636A6-23-101 and appears to be part of a construction project for a steam tunnel system at the VA facility.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
J
19' - 4"
CB5
CB5
4'
7"
/8
6'
1/ 4"
CB1
C B
0"
22' - 6" L2
11' - 4 3/8"
11' - 1 5/8"
6"
CONT.W8x35
21' - 4 1/8"
12' - 9 1/8"
C B
C B
CB7
3' - 3 1/4"
2' - 0 1/2"11' - 3 1/4"
4' - 9 1/8"
C B
20' - 10"
C B
C B
5' - 7" 9' - 10" 5' - 5"
17' - 2"
CB1
CB1
5'
1" 9'
5'
1"
17' - 1 1 5/8"
14' - 0"
C B5
7' - 6 3/8"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL BID
DOCUMENT
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
636A6-23-101
DES MOINES, IA
SITE
623 26TH AVENUE
ROCK ISLAND, IL 61201
9555 JAMES AVE S. SUITE 200
BLOOMINGTON, MN 55431
C U s e rs \d w e n tl a n d \D o c u m e n ts \1
R
V T d w e n tl a n d G
T X
W
.r v t
/7
/2
:0
:2
A
M
FRAMING PLANS CONSTRUCTION STEAM TUNNEL
08/09/24 AA DW
17270
S203
1/4" = 1'-0"S203
1 SOUTH TUNNEL - VAULT 1 ENLARGED PLAN
1/4" = 1'-0"S203
3 NORTH TUNNEL - VAULT 3 ENLARGED PLAN
1/4" = 1'-0"S203
4 NORTH TUNNEL - VAULT 4 ENLARGED PLAN
1/4" = 1'-0"S203
6 NORTH TUNNES - VAULT 6 ENLARGED PLAN
1/4" = 1'-0"S203
2 SOUTH TUNNEL - VAULT 2 ENLARGED PLAN
1/4" = 1'-0"S203
5 NORTH TUNNEL - VAULT 5 ENLARGED PLAN
Revisions: Date:
REVISION #1 2/5/202502/07/2025
| Sheets |
| S001 - NOTE SHEET |
| S002 - STEAM TUNNEL SITE PLAN |
| S101 - FOOTING & FOUNDATION PLANS |
| S102 - FOOTING & FOUNDATION PLAN |
| S103 - FOOTING & FOUNDATION PLANS |
| S104 - FOOTING & FOUNDATION PLAN |
| S201 - FRAMING PLANS |
| S202 - FRAMING PLANS |
| S203 - FRAMING PLANS |
| S301 - FOOTING & FOUNDATION DETAILS |
| S302 - FOOTING & FOUNDATION DETAILS |
File details come from the government source that posted it. Updated .