This is a technical engineering drawing showing storm underdrain plans for north vaults as part of a steam tunnel construction project for the Department of Veterans Affairs in Des Moines, IA. The drawing (C401-N-2) details the storm drainage system for Vaults 4 and 6, including specific elevations, pipe sizes, and drainage configurations.

The plans specify 4-inch perforated PE pipe meeting ASTM D2648 specifications for drain tile installations, with a 12-inch offset from bottom of footings. Non-perforated conveyance pipes below tunnel floor slabs are to be 4-inch PVC SDR 26 meeting ASTM D3034 standards. All drain tile must be wrapped with woven geotextile filter fabric. The drawing includes detailed measurements, invert elevations, pipe slopes, and connection points for various components including catch basins, manholes, floor drains, and existing storm infrastructure. The scale is 1"=5' for a 30"x42" paper size, and includes standard engineering legends showing property limits, construction limits, and both existing and proposed drainage features.

View the file

Other files

File Type Posted
Site Visit Sign-In Sheet.pdf PDF
36C26325R0017 0005.docx DOCX document
260541 Underground Electrical Construction - 9 pages.pdf PDF
232213 Steam and Condensate Heating Piping - 26 pages.pdf PDF
336300 Steam Energy Distribution - 40 pages.pdf PDF
334613 Foundation Drainage - 7 pages.pdf PDF
329000 Planting - 11 pages.pdf PDF
230923 Direct-Digital Control Systems for HVAC - 67 pages.pdf PDF
271323-13i Communications Optical Fiber Splicing and Terminations - 1 pages.pdf PDF
36C26325R0017 0004.docx DOCX document
02833313 Lead-Based Paint Removal Disposal - 13 pages.pdf PDF
271323i Communications Optical Fiber Backbone Cabling - 3 pages.pdf PDF
265600 Exterior Lighting - 5 pages.pdf PDF
36C26325R0017 0003.docx DOCX document
Wage Determination 2.7.25 - 7 pages.pdf PDF
636A6-23-101 Steam Tunnel Questions - 12 pages.pdf PDF
MP101.pdf PDF
MP501.pdf PDF
C401-S-2.pdf PDF
E104.pdf PDF
C501-N-1.pdf PDF
AE314.pdf PDF
Building 10 Addition 1973 - 9 pages.pdf PDF
AE312.pdf PDF
C601-N.pdf PDF
S201.pdf PDF
AE311.pdf PDF
C401-N-1.pdf PDF
CL701-N.pdf PDF
AE520.pdf PDF
MP104.pdf PDF
S001.pdf PDF
S202.pdf PDF
36C26325R0017 0002.pdf PDF
AE101-SB.pdf PDF
S203.pdf PDF
C201-N.pdf PDF
Building 10 Original Construction 1932 - 8 pages.pdf PDF
C401-S-1.pdf PDF
C902.pdf PDF
MP302.pdf PDF
E103.pdf PDF
MV402.pdf PDF
AE313.pdf PDF
E501.pdf PDF
AE521.pdf PDF
CD101-N.pdf PDF
Tremco Product Infomation.pdf PDF
Wage Determination 1.31.25 - 7 pages.pdf PDF
36C26325R0017 0001.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M

PC

M

PC

M

PC

M

PC

M

PC

M

PC

M

PC

M

PC

M

PC

M

PC

BUILDING 3

10+00

4" PVC FLOOR DRAIN

RIM = 906.97

INV = 904.11

38 LF 4" PE @ 14.39%

45° 4" PVC BEND

INV = 904.10

1 LF 4" PVC @ 1.00%

143 LF 4" PVC @ 5.30%

PROTECT EX. PERIMETER

BUILDING DRAINTILE BELOW

PROPOSED VAULT

CBMH-103

RIM = 908.89

12" INV E = 905.40

4" INV S = 898.67

4" INV NW = 896.26

12" INV W = 896.00

18" INV N = 895.88

90° 4" PVC BEND

UPPER INV = 898.32

4"×4" PVC TEE W/

VERTICAL RISER

LOWER INV = 896.29

10 LF 4" PVC @ 1.00%

4" PVC FLOOR DRAIN

RIM = 899.17

INV = 896.46

22½° 4" PE BEND

INV = 898.40

CBMH-104

RIM = 909.20

4" INV E = 898.27

4" INV W = 898.39

12" INV SE = 906.72

12" INV SW = 898.65

12" INV E = 896.29

45° 4" PE BEND

INV = 898.32

1 LF 4" PVC @ 1.00%

25 LF 4" P

E @ 1.13%

19 LF 4" PE @ 1.12%

16 LF 4" PE @ 0.00%

75 LF 4" PE @ 2.54%

54 LF 4" PE @ 2.26%2 LF 4" PE @ 2.24%

45° 4" PVC BEND

INV = 896.52

5 LF 4" PVC @ 1.00%

1 LF 4" PVC @ 1.00%

45° 4" PVC BEND

INV = 896.47

1 LF 4" PVC @ 1.00%

143 LF 4" PVC @ 5.30%

2 LF 4" PVC @ 2.52%

22½° 4" PVC BEND

INV = 898.72

3 LF 4" PVC @ 2.33%

(2) 45° 4" PVC BENDS

4" PVC FLOOR DRAIN

RIM = 900.31

INV = 897.34

3 LF 4" PVC @ 1.00% 4" PVC WYE

INV = 897.31

5 LF 4" PVC @ 0.50%

6 LF 4" PVC @ 0.50%

4" PVC WYE

INV = 897.29

CONNECT NEW PVC

VERTICAL RISER TO

EX. STORM @

UPPER INV = 901.61

LOWER INV = 897.50

EX. STMH-203

RIM = 912.78

INV E = 908.56

INV W = 907.68

INV S = 901.68

32 LF 4" PVC @ 1.00%

EXTEND 4" PVC 3.0'

BEYOND TOE OF

FOUNDATION & CAP

FOR FUTURE

EXTENSION

INV = 897.40

15 LF 4" PVC @ 0.50%

2 LF 4" PVC @ 1.04%

121 LF 4" PVC @ 1.04%

EX. 5 LF 8" DIP STORM @ 1.37%

45° 4" PVC BEND

INV = 897.31

45° 8" PVC BEND

INV = 897.18

EXTEND 4" PVC 3.0' BEYOND

TOE OF FOUNDATION & CAP

FOR FUTURE EXTENSION

INV = 897.34

4" PVC FLOOR DRAIN

RIM = 898.63

(2) 45° VERTICAL 4" PVC BENDS

@ INV = 895.88

90° VERTICAL 4" PVC BEND

INV = 895.58

CORE DRILL INTO TOP OF

EX. 30" RCP @ ELEV = 887.8±

(TOP OF PIPE)

30" INV = 885.27

(2) 45° 4" PE BENDS

INV = 897.88

(2) 45° 4" PE BENDS

INV = 897.88

4"×4" PVC TEE W/ VERTICAL RISER

TOP INV = 897.88

BOTTOM RISER TO BE CORE DRILLED

INTO TOP OF EX. 30" RCP @ ELEV = 888.2±

30" INV = 885.71

4" PVC CLEANOUT

RIM = 910.19

INV = 897.88

(2) 45° 4" PE BENDS

INV = 897.88

9 LF 4" PE @ 0.00%

115 LF 4" PE @

1.36%

3 LF 4" PE @ 0.00%

16 LF 4" PE @ 0.00%

9 LF 4" PE @ 0.00%

52 LF 4" PE @

1.54%

7 LF 4" PE @

2.50%

60° 4" PE BEND

INV = 898.05

60° 4" PVC BEND

INV = 896.05

60° 4" PE BEND

INV = 898.05

4"×4" PVC WYE

INV = 895.78

5 LF 4" PVC @ 2.00%

7 LF 4" PVC @ 2.00%

4" PVC WYE

INV = 895.64

3 LF 4" PVC @ 2.00%

EX. 30" RCP

EX. 30" RCP

902903904906907908909

45° 4" PVC BEND

INV = 897.85

2 LF 4" PVC @ 110.50%

45° 4" PVC BEND

INV = 897.85

24 LF 4" PE @ 0.83%

20 LF 4" PVC @ 1.25%

4" PVC WYE

INV = 895.64

45° 4" PE BEND

INV = 897.88

45° 4" PE BEND

INV = 897.88

1.5 LF 4" PVC @ 147.33%

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v ac ih s de s m oi ne s-a e co ns tru ct s te am tu nn el c iv il\ _0 ca d fil es s he et s\

0_ c_ st rm -b lo w up s.

dw g ed it:

m m ill er s av ed :2

/5 /2

4:

P M p lo t:2 /7

/2

1:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17270

CONSTRUCT STEAM

TUNNEL

636A6-23-101

SITE

08/09/2024

DES MOINES, IA

LRK

100% FINAL BID

DOCUMENTS

Date:

623 26TH AVENUE

ROCK ISLAND, IL 61201

9555 JAMES AVE S. SUITE 200

BLOOMINGTON, MN 55431

N

0 5' 10'

STORM UNDERDRAIN PLAN

- NORTH VAULTS

C401-N-2

LEGEND

PROPERTY LIMITS

CONSTRUCTION LIMITS

EXISTING CONCRETE C&G

EXISTING DRAINTILE

EXISTING STORM SEWER

EXISTING CATCH BASIN

EXISTING STORM MANHOLE

PROPOSED DRAINTILE

PROPOSED STORM SEWER

PROPOSED CATCH BASIN

PROPOSED STORM MANHOLE

PROPOSED CLEANOUT

NOTES

1. ALL DRAIN TILE WITH INVERT 12" OFFSET FROM

BOTTOM OF FOOTING TO BE 4" PERFORATED PE

PIPE MEETING ASTM D2648 SPECIFICATIONS

2. ALL NON-PERFORATED CONVEYANCE PIPE TO BE

INSTALLED BELOW TUNNEL FLOOR SLAB AND AT

CONNECTIONS TO STORM SEWER SYSTEMS TO

BE 4" PVC SDR 26 MEETING ASTM D3034.

3. ALL DRAIN TILE TO BE WRAPPED WITH WOVEN

GEOTEXTILE FILTER FABRIC (SEE SPECIFICATION

33 46 13 - FOUNDATION DRAINAGE)

SCALE:1

VAULT 3 UNDERDRAIN PLAN

1" = 5' (30" x 42" PAPER SIZE) SCALE:2

VAULT 4 UNDERDRAIN PLAN

1" = 5' (30" x 42" PAPER SIZE)

SCALE:3

VAULT 5 UNDERDRAIN PLAN

1" = 5' (30" x 42" PAPER SIZE) SCALE:4

VAULT 6 UNDERDRAIN PLAN

1" = 5' (30" x 42" PAPER SIZE)

BN

1 REVISION 1 02/07/2025

AutoCAD SHX Text

GARY R. JOHNSON 18238

Sheets and Views
TUNNEL STORM UNDERDRAIN PLAN N2