C601-N.pdf

PDF 979 KB Posted

Attached to
Z1DA--PN: 636A6-23-101 Construct Steam Tunnel (DM)
Solicitation number
36C26325R0017
Issued by

About this file

This is a technical drawing showing cross-sectional details for a steam tunnel construction project at a VA facility in Des Moines, IA. The drawing (sheet C601-N) contains five cross-sectional views of the north tunnel at different stations (10+20.00, 12+00.00, 13+49.00, 14+00.00, and 15+00.00).

The drawings detail specific elevations for floor, ceiling, and lid components, with floor elevations ranging from 898.88 to 900.07 feet and ceiling elevations from 906.17 to 909.17 feet. Key features include proposed vaults (#3 and #5), connections to Building 3, floor drains, and grade specifications including a 2.0% minimum slope away from vaults and 3:1 maximum slopes. The project is designed by Anderson Engineering of Minnesota, LLC (Project #17270) and appears to be at 100% final bid document stage with an issue date of 08/09/2024.

View the file

Other files

File Type Posted
Site Visit Sign-In Sheet.pdf PDF
36C26325R0017 0005.docx DOCX document
260541 Underground Electrical Construction - 9 pages.pdf PDF
232213 Steam and Condensate Heating Piping - 26 pages.pdf PDF
336300 Steam Energy Distribution - 40 pages.pdf PDF
334613 Foundation Drainage - 7 pages.pdf PDF
329000 Planting - 11 pages.pdf PDF
230923 Direct-Digital Control Systems for HVAC - 67 pages.pdf PDF
271323-13i Communications Optical Fiber Splicing and Terminations - 1 pages.pdf PDF
36C26325R0017 0004.docx DOCX document
02833313 Lead-Based Paint Removal Disposal - 13 pages.pdf PDF
271323i Communications Optical Fiber Backbone Cabling - 3 pages.pdf PDF
265600 Exterior Lighting - 5 pages.pdf PDF
36C26325R0017 0003.docx DOCX document
Wage Determination 2.7.25 - 7 pages.pdf PDF
636A6-23-101 Steam Tunnel Questions - 12 pages.pdf PDF
MP101.pdf PDF
MP501.pdf PDF
C401-S-2.pdf PDF
E104.pdf PDF
C501-N-1.pdf PDF
AE314.pdf PDF
Building 10 Addition 1973 - 9 pages.pdf PDF
AE312.pdf PDF
S201.pdf PDF
AE311.pdf PDF
C401-N-1.pdf PDF
CL701-N.pdf PDF
C401-N-2.pdf PDF
AE520.pdf PDF
MP104.pdf PDF
S001.pdf PDF
S202.pdf PDF
36C26325R0017 0002.pdf PDF
AE101-SB.pdf PDF
S203.pdf PDF
C201-N.pdf PDF
Building 10 Original Construction 1932 - 8 pages.pdf PDF
C401-S-1.pdf PDF
C902.pdf PDF
MP302.pdf PDF
E103.pdf PDF
MV402.pdf PDF
AE313.pdf PDF
E501.pdf PDF
AE521.pdf PDF
CD101-N.pdf PDF
Tremco Product Infomation.pdf PDF
Wage Determination 1.31.25 - 7 pages.pdf PDF
36C26325R0017 0001.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N. Cross Section 1: 0+00 to 0+50.00

6.

0+00.00 0+50.00

6.

N. Cross Section 2: 0+00 to 0+50.00

0.

0+00.00

8.

0+50.00

6.

5'6.

3'

N. Cross Section 3: 0+00 to 0+50.00

0.

0+00.00

5.

0+50.00

7.

5'

0.

0+00.00

8.

1.

1+00.00

.4

9.

0+00.00

1.

0+50.00

6.

9'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v ac ih s de s m oi ne s-a e co ns tru ct s te am tu nn el c iv il\ _0 ca d fil es e xh ib its \1

_u til ity c ro ss in gs

.d w g ed it:

bn or he im s av ed

:7 /3

0/

:0

P M p lo t:2 /6

/2

:1

A M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17270

CONSTRUCT STEAM

TUNNEL

636A6-23-101

SITE

08/09/2024

DES MOINES, IA

LRK

100% FINAL BID

DOCUMENTS

Date:

623 26TH AVENUE

ROCK ISLAND, IL 61201

9555 JAMES AVE S. SUITE 200

BLOOMINGTON, MN 55431

SCALE:6

NORTH TUNNEL CROSS SECTION (STA 10+20.00)

1V:1H SCALE:7

NORTH TUNNEL CROSS SECTION (STA 12+00.00)

1V:1H SCALE:8

NORTH TUNNEL CROSS SECTION (STA 13+49.00)

1V:1H

SCALE:9

NORTH TUNNEL CROSS SECTION (STA 14+00.00)

1V:1H SCALE:10

NORTH TUNNEL CROSS SECTION (STA 15+00.00)

1V:1H

CROSS SECTIONS - NORTH

C601-N

BUILDING 3

PROPOSED

VAULT 3

EXISTING GRADE

EXISTING GRADE

PROPOSED

TUNNEL

PROPOSED GRADE

EXISTING GRADE

PROPOSED GRADE

EXISTING GRADE

PROPOSED VAULT 5

PROPOSED

TUNNEL

EXISTING GRADE

PROPOSED GRADE

TO SLOPE AWAY FROM

VAULT AT 2.0% MIN.

PROPOSED TUNNEL

3:1 SLOPE (MAX)

3:1 SLOPE

MM

SOUTHWEST WALL OF

PROPOSED TUNNEL

NORTHWEST &

SOUTHEAST OF VAULT 5

NOTE: SEE STRUCTURAL PLANS DETAIL 13 ON SHEET S301 FOR CONNECTIONS FROM

VAULT #3 TO BUILDING #3.

FLOOR ELEV. = 900.07

CEILING

ELEV. = 907.01

FLOOR ELEV. = 898.88

BASEMENT

FFE=907.10

CEILING=915.10

TOP OF LID=916.43

FLOOR=907.10

FLOOR=907.10

FLOOR DRAIN

= 907.01 FLOOR ELEV. = 899.67

CEILING = 906.17

PROPOSED

TUNNEL

CEILING = 906.91

FLOOR = 899.43

FLOOR ELEV. = 898.88

FLOOR DRAIN = 898.63

CEILING ELEV. = 909.17CEILING ELEV. = 909.17

TOP OF LID = 911.19TOP OF LID = 910.92

SOUTHWEST WALL OF

PROPOSED TUNNEL

NORTHWEST &

SOUTHEAST OF SECTION

CEILING = 906.17

FLOOR ELEV. = 899.91

ELI-6

2.0%

1 REVISION 1 02/07/2025

AutoCAD SHX Text

GARY R. JOHNSON 18238

Sheets and Views
CROSS SECTIONS (NORTH)

File details come from the government source that posted it. Updated .