This is a civil engineering drawing showing the Storm Underdrain Plan for a steam tunnel construction project at a VA facility in Des Moines, IA. The drawing details the specifications for an underground drainage system connecting Buildings 9, 10, 11, and 12, with a Future Foundational Services Building at the center of the plan.

The plan specifies installation of 4" perforated PE pipe meeting ASTM D2648 specifications for drain tiles, and 4" PVC SDR 26 pipe meeting ASTM D3034 for non-perforated conveyance pipes below the tunnel floor slab. The system includes multiple cleanouts, bends, and elevation changes, with detailed invert elevations ranging from 907.88 to 884.00. All drain tile is to be wrapped with woven geotextile filter fabric, and the plan includes specific slope gradients and pipe lengths throughout the system. The drawing is part of the 100% Final Bid Documents dated 08/09/2024, prepared by Anderson Engineering of Minnesota, LLC for the VA Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
Site Visit Sign-In Sheet.pdf PDF
36C26325R0017 0005.docx DOCX document
260541 Underground Electrical Construction - 9 pages.pdf PDF
232213 Steam and Condensate Heating Piping - 26 pages.pdf PDF
336300 Steam Energy Distribution - 40 pages.pdf PDF
334613 Foundation Drainage - 7 pages.pdf PDF
329000 Planting - 11 pages.pdf PDF
230923 Direct-Digital Control Systems for HVAC - 67 pages.pdf PDF
271323-13i Communications Optical Fiber Splicing and Terminations - 1 pages.pdf PDF
36C26325R0017 0004.docx DOCX document
02833313 Lead-Based Paint Removal Disposal - 13 pages.pdf PDF
271323i Communications Optical Fiber Backbone Cabling - 3 pages.pdf PDF
265600 Exterior Lighting - 5 pages.pdf PDF
36C26325R0017 0003.docx DOCX document
Wage Determination 2.7.25 - 7 pages.pdf PDF
636A6-23-101 Steam Tunnel Questions - 12 pages.pdf PDF
MP101.pdf PDF
MP501.pdf PDF
C401-S-2.pdf PDF
E104.pdf PDF
C501-N-1.pdf PDF
AE314.pdf PDF
Building 10 Addition 1973 - 9 pages.pdf PDF
AE312.pdf PDF
C601-N.pdf PDF
S201.pdf PDF
AE311.pdf PDF
C401-N-1.pdf PDF
CL701-N.pdf PDF
C401-N-2.pdf PDF
AE520.pdf PDF
MP104.pdf PDF
S001.pdf PDF
S202.pdf PDF
36C26325R0017 0002.pdf PDF
AE101-SB.pdf PDF
S203.pdf PDF
C201-N.pdf PDF
Building 10 Original Construction 1932 - 8 pages.pdf PDF
C902.pdf PDF
MP302.pdf PDF
E103.pdf PDF
MV402.pdf PDF
AE313.pdf PDF
E501.pdf PDF
AE521.pdf PDF
CD101-N.pdf PDF
Tremco Product Infomation.pdf PDF
Wage Determination 1.31.25 - 7 pages.pdf PDF
36C26325R0017 0001.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U S

T U

S T

BUILDING 10

BUILDING 11

BUILDING 9

FUTURE

FOUNDATIONAL

SERVICES

BUILDING

BUILDING

0+00

1+

2+

2+95

FOUNDATIONAL

4" PVC CLEANOUT

RIM = 922.05

INV = 907.88

4" PVC CLEANOUT

RIM = 922.00

INV = 907.88

19 LF 4" PE @ 0.00%

(2) 45° 4" PE BENDS

INV = 907.88

19 LF 4" PE @ 0.00%

DEFLECT 4" PE 3.6 DEGREES HORIZONTAL

INV = 907.88

13 LF 4" PE @ 7.86%

(2) 45° 4" PE BENDS

INV = 906.83

19 LF 4" PE @ 0.00%

VERTICAL 4"-11-1/4° PE BEND

INV = 907.88

25 LF 4" PE @ 13.26%

45° HORIZONTAL/

VERTICAL 4" PE BEND

INV = 903.35

37 LF 4" PVC @ 9.98%

17 LF 4" PE @ 19.64%

9 LF 4" PE @ 1.85%

(2) 45° 4" PE BENDS

INV = 906.66

45° 4" PE BEND

INV = 903.35

21 LF 4" PE @ 14.56%

4" PVC CLEANOUT

RIM=915.45

INV = 900.29

45° 4" PVC BEND

INV = 901.35

17 LF 4" PE @ 7.30%

4" PVC CLEANOUT

RIM = 912.54

INV = 899.05

14 LF 4" PE @ 0.00%

14 LF 4" PE @ 1.86%

(2) 45° 4" PE BENDS

INV = 898.79

84 LF 4" PE @ 11.32%

138 LF 4" PVC @ 10.90%

49 LF 4" PE @ 12.39%

4" PVC CLEANOUT

RIM = 907.83

INV = 892.72

14 LF 4" PE @ 0.00%

18 LF 4" PE @ 7.44%

(2) 45° 4" PE BENDS

INV = 891.12

14 LF 4" PE @ 1.86%

18 LF 4" PE @ 15.89%

45° 4" PE BEND

INV = 888.26

22 LF 4" PE @ 0.00%

(2) 45° 4" PE BENDS

INV = 888.26

24 LF 4" PE @ 0.00%

4" PVC CLEANOUT

RIM=905.49

INV=891.38

59 LF 4" PE @ 3.86%

69 LF 4" PVC @ 6.09%

(2) 45° 4" PE BENDS

INV = 885.98

(2) 45° 4" PVC BENDS

INV = 885.29

29 LF 4" PVC @ 1.93%

11 LF 4" PE @ 11.66% 4" PE 6.7° VERTICAL

DEFLECTION

INV = 885.98

19 LF 4" PE @ 0.00%

4" PVC CLEANOUT

RIM = 895.50

INV = 885.20

5 LF 4" PE @ 0.00%

(2) 45° 4" PE BENDS

INV = 885.20

20 LF 4" PE @ 0.00%

4" PVC CLEANOUT

RIM = 893.00

INV = 885.20

9 LF 4" PE @ 0.00%

45° 4" PVC BEND

INV = 885.20

14 LF 4" PVC @ 1.56%

4"×4" PVC WYE

INV = 884.98

4"×4" PVC WYE

INV = 884.73

2 LF 4" PVC @ 0.80%

EX. 18" CMP

8"×4" PVC REDUCER

60 LF 8" PVC @ 1.22%

8" RCP FES

INV = 884.00

5 CY, CL. 3 RIPRAP

SEE DETAIL 2/SHEET C902

EX. 18" CMP INLET

(2) 45° 4" PE BENDS

INV = 892.72

(2) 45° 4" PE BENDS

INV = 900.29

VOLUNTEER DR

4" PE 2.2° VERTICAL

DEFLECTION

INV = 888.26

4" PE 2° HORIZONTAL

DEFLECTION

INV = 906.55

10 LF 4" PE @ 13.26%

(2) 45° 4" PE BENDS

INV = 900.29

(2) 45° 4" PE BENDS

INV = 899.05

(2) 45° 4" PE BENDS

INV = 891.38

4" PVC CLEANOUT

RIM=905.49

INV=891.38

4" PVC CLEANOUT

RIM=899.05

INV=888.26

(2) 45° 4" PE BENDS

INV = 892.72

(2) 45° 4" PVC BENDS

INV = 891.38

(2) 45° 4" PE BEND

INV = 885.20

4" PVC CLEANOUT

RIM = 911.06

INV = 897.87

48 LF 4" PE @ 11.42%

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v ac ih s de s m oi ne s-a e co ns tru ct s te am tu nn el c iv il\ _0 ca d fil es s he et s\

0_ c_ st rm .d w g ed it:

m m ill er s av ed :2

/5 /2

3:

P M p lo t:2 /6

/2

3:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 17270

CONSTRUCT STEAM

TUNNEL

636A6-23-101

SITE

08/09/2024

DES MOINES, IA

LRK

100% FINAL BID

DOCUMENTS

Date:

623 26TH AVENUE

ROCK ISLAND, IL 61201

9555 JAMES AVE S. SUITE 200

BLOOMINGTON, MN 55431

N

0 20' 40'

STORM UNDERDRAIN PLAN

- SOUTH

C401-S-1

LEGEND

PROPERTY LIMITS

CONSTRUCTION LIMITS

EXISTING CONCRETE C&G

EXISTING DRAINTILE

EXISTING STORM SEWER

EXISTING CATCH BASIN

EXISTING STORM MANHOLE

PROPOSED DRAINTILE

PROPOSED STORM SEWER

PROPOSED CATCH BASIN

PROPOSED STORM MANHOLE

PROPOSED CLEANOUT

NOTES

1. ALL DRAIN TILE WITH INVERT 12" OFFSET FROM

BOTTOM OF FOOTING TO BE 4" PERFORATED PE

PIPE MEETING ASTM D2648 SPECIFICATIONS

2. ALL NON-PERFORATED CONVEYANCE PIPE TO BE

INSTALLED BELOW TUNNEL FLOOR SLAB AND AT

CONNECTIONS TO STORM SEWER SYSTEMS TO

BE 4" PVC SDR 26 MEETING ASTM D3034.

3. ALL DRAIN TILE TO BE WRAPPED WITH WOVEN

GEOTEXTILE FILTER FABRIC (SEE SPECIFICATION

33 46 13 - FOUNDATION DRAINAGE)

SEE SHEET C401-S-2

FOR UNDERDRAIN

WITHIN VAULT #1

SEE SHEET C401-S-2

FOR UNDERDRAIN

WITHIN VAULT #2

BN

1 REVISION 1 02/07/2025

AutoCAD SHX Text

SMH

AutoCAD SHX Text E

AutoCAD SHX Text

GARY R. JOHNSON 18238

Sheets and Views
TUNNEL STORM UNDERDRAIN PLAN (SOUTH)

File details come from the government source that posted it. Updated .