This is a mechanical piping detail drawing sheet (MP302) showing various technical specifications and installation details for a steam tunnel construction project at a VA facility in Des Moines, IA. The drawing includes seven detailed diagrams with specifications for steam system components.
The drawing details include: (1) end of main steam trap assembly specifications with required pipe sizes and configurations, (2) inverted bucket steam trap assembly showing required components and dimensions, (3) floor/wall penetration details for rated fire barriers, (4) steam pressure reducing station layout for double valve configuration, (5) pipe penetration specifications for vault installations below grade, (6) exhaust fan ductwork connection details with dimensional requirements, and (7) typical isolation valve configurations. The drawings provide specific requirements for materials like Schedule 80 steel pipe, stainless steel components, and high-density polyethylene sleeves, along with precise measurements and installation notes for contractors. This appears to be part of the construction documents package for project number 636A6-23-101.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO DRAIN
MV
MANUAL
AIR VENT
TO BUILDING LOAD
INVERTED BUCKET
TRAP ASSEMBLY
WELDED TEE
10mm (3/8") TEST CONNECTION
25mm [1"] GATE VALVE
WELDED TEE
CONDENSATE
STEAM PIPE
SCHEDULE 80 STEEL PIPE
CAP
ISOLATION VALVE
ISOLATION VALVE
CAP
300mm[12"]
150mm[6"]
NOTES:
1. ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 300mm [12"] MINIMUM HIGH DRIP LEG FROM
BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 150mm [6"] SCALE POCKET BELOW TRAP INLET.
2. PROVIDE BYPASS PIPING.
SEE DRAWINGS FOR PIPE SIZES
TO RETURN MAIN
SCHEDULE 80 STEEL PIPE
PIPE SIZE SHALL BE SAME SIZE AS TRAP
INVERTED BUCKET TRAP. SEE
PLANS, AND SCHEDULES
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPE
FL
OW
SCHEDULE 80
STEEL PIPE
BYPASS-INSTALL IN HORIZONTAL PLANE LEVEL WITH
TRAP OR IN VERTICAL PLANE & BELOW TRAP
DRIP LEG OR EQUIPMENT CONNECTION. MAKE
THE SAME SIZE AS THE SUPPLY MAIN OR
EQUIPMENT CONNECTION. SEE NOTE 1
1" GATE VALVE
USE 4-BOLT RAISED FACE FLANGES
10mm (3/8") TEST CONNECTION
0m m 0m m
[1 2"
M
IN
[6 M
IN
T T
T
T
1. SEE FLOOR PLANS FOR PIPE SIZES.
2. SEE EQUIPMENT SCHEDULES FOR VALVE DATA AND PIPE SIZES. INSTALL VALVES AS RECOMMENDED BY MANUFACTURER.
3. BYPASS WILL BE SIZED TO MEET THE CAPACITY OF THE COMBINED CAPACITY OF THE TWO PRV'S.
4. PROVIDE NECESSARY UNIONS FOR THE REMOVAL OF VALVE WITH THREADED CONNECTIONS.
5. SLOPE PILOT CONTROL LINE FROM THE PRESSURE REDUCING VALVE TO DOWNSTREAM STEAM PIPING. MIN SLOPE WILL BE 25mm/300mm (1”/12”).
6. ALL UPSTREAM REDUCERS WILL BE ECCENTRIC IF REQUIRED.
3/4"
REDUCER (TYP.)
IF REQUIRED
PILOT CONTROL LINE
(TYP.)
SEE NOTE 1
SIPHON (TYP.)
NOTES:
NC
NO
SEE NOTE 3
PRV -1
1/4" CONTROL PIPE-PITCH
AWAY FROM PILOT. AVOID
WATER POCKETS. CONNECT
TO MAIN LINE.
5xD1 MIN.
(TYP.) TRIP STOP
VALVE
(TYP.) 5" STEAM MAIN
5" STEAM MAIN
1"
INVERT BUCKET TRAP
ASSEMBLY (TYP.)
STRAINER (TYP.)
5"
5"
5xD1 MIN.
(TYP.)
3/4"
PILOT CONTROL LINE
(TYP.)
PRV-1
1"
STRAINER (TYP.)
SEE NOTE 6
5"
THE SENSING LINE SHALL BE
INSTALLED 4 PIPE DIAMETERS
AFTER THE PIPE SIZE
INCREASE.
THE SENSING LINE SHALL BE
INSTALLED 4 PIPE DIAMETERS
AFTER THE PIPE SIZE
INCREASE.
1/4" CONTROL PIPE-PITCH
AWAY FROM PILOT. AVOID
WATER POCKETS. CONNECT
TO MAIN LINE.
TRIP STOP
VALVE
(TYP.)
INVERT BUCKET TRAP
ASSEMBLY (TYP.)
INVERT BUCKET TRAP
ASSEMBLY (TYP.)
INVERT BUCKET TRAP
ASSEMBLY (TYP.)
T-7 T-8
T-9
T-10
1"
TV-1
TV-1
1"
EXTERIOR SIDE OF CONCRETE CEILING
HIGH DENSITY POLYETHELENE
(HDPE) SLEEVE WITH INTERGRAL
HOLLOW MOLDED WATER STOP RING
4" [100mm] LARGER THAN OUTSIDE
DIAMETER.
304 STAINLESS STEEL SCHEDULE 10 PIPE
CENTERED IN SLEEVE
FLANGED CONNECTION
1/4"x1/4" [6x6mm] IRON
PIPE STRAPREINFORCED CONCRETE
CEILING. SEE STRUCTURAL.
INTERIOR SIDE OF CEILING
WATER STOP
PIPE TERMINATION MINIMUM 36"
ABOVE TOP OF VAULT WITH 1_
WIRE MESH OVER OPENING
12 G ¼" 304 SS Plate
STEEL HATCH -
STRUCTURAL
STAINLESS STEEL BOLTS, NUTS &
WASHERS
304 STAINLESS STEEL
PIPE AND FLASHING
STEEL ACCESS HATCH
VAULT EXTENSION
TOP ABOVE GRADE
PLAN VIEWSECTION VIEW
PIPE FLASHING
FLANGED CONNECTION
BOLT CIRCLE Ø BC
FLANGE HOLE Ø 0.44
QUANTITY 8
END VIEW
0.56 DIA. MOUNTING HOLES
END VIEW SHOWS FROM OUTLET END OF UNIT
AIRFLOW
SIDE VIEW
FAN CONNECTION SCHEDULE
D L H PD BC
in
18.38
14.25 in in in in
182120
17 17 14
19.75
AH
in
9.25
REFER TO PIPE PENETRATION
THROUGH VAULT BELOW
GRADE DETAIL FOR
CONTINUATION
FLANGED
CONNECTION
TAG
EF-2
EF-1
FW
in
14.5
BW
in
L
PDDH
B
FW
BW
AH
TH
CEILING
3" x 3" x ¼"
ANGLE (TYP)
ANCHOR ANGLE TO CONCRETE
CEILING WITH ½" DIAMETER SIMPSON
TITEN HD ANCHORS. 4" EMBEDMENT
MIN.
BACKDRAFT
DAMPER S-60
D
S-60
VAULT/TUNNEL FLOOR
NOTE:
SEE DETAIL 4/MP302 FOR ADDITIONAL DETAILS FOR PRV STATION.
TO HPS
DISTRIBUTION
0-1500kPa
[0-200 PSIG]
AIR-GAP IS
REQUIRED.
TYPICAL FOR ISOLATION
VALVES ON STEAM MAIN
FIRE SEALANT
FIRE SEALANT
NOTE 2
NOTE 3
PENETRATING ITEM
NOTE 4
NOTE 3
NOTE 4
PENETRATING ITEM
NOTE 2
NOTE 3
RATED WALL
(CONSTRUCTION
VARIES)
RATED FLOOR
(CONSTRUCTION
VARIES)
NOTES:
1. THIS GENERAL DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS OR FLOORS. THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW LONGITUDINAL MOVEMENT. REFER TO SPECIFICATION SECTION 21 05 03 FOR SELECTION OF
THROUGH PENETRATION FIRE STOPPING.
2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE DRILL. EACH CONTRACTOR FURNISHES SLEEVE TO G.C., COORDINATES SLEEVE LOCATIONS AND DEBURS SLEEVE. G.C. BUILDS SLEEVE INTO WALL OR FLOOR ALLOWING NO GAP AROUND SLEEVE. IF SLEEVE IS NOT PROVIDED WHEN WALL OR FLOOR IS BUILT, CONTRACTOR SHALL INSTALL SLEEVE. SLEEVE
SIZE SHALL ALLOW ANNULAR SPACE REQUIRED BY THE SELECTED FIRE STOP SYSTEM.
3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED FOR FIRE STOP SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM APPLICATION LISTING. SECURE TO WALL OR FLOOR TO ALLOW LONGITUDINAL MOVEMENT OF
PENETRATING ITEM WITHOUT MOVEMENT OF FIRE BARRIER.
4. WATERTIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL ANGLE FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP. PLACE A BEAD OF WATERPROOF SEALANT BETWEEN FLOOR AND BOTTOM OF ANGLE FRAME.
SECURE TO FLOOR WITH MASONRY ANCHORS IN CORNERS AND ON 12" MAXIMUM CENTERS. MULTIPLE PENETRATING ITEMS MAY
BE ENCLOSED IN ONE FRAME.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
623 26TH AVENUE
ROCK ISLAND, IL 61201
9555 JAMES AVE S. SUITE 200
BLOOMINGTON, MN 55431
C U s e rs
\b b ra n d t\ D o c u m e n ts \1
-M -R b b ra n d tL
P A
S
.r v t
/6
/2
:5
:1
A
M
MP302
MECHANICAL PIPING DETAILS CONSTRUCT STEAM
TUNNEL
DES MOINES, IA
636A6-23-101
3 & 11
08/09/2024 RES RWB
17270
END OF MAIN STEAM TRAP DETAIL
INVERTED BUCKET STEAM TRAP ASSEMBLY
STEAM PRESSURE REDUCING STATION DOUBLE VALVE (1/2 AND 1/2)
NOT TO SCALE NOT TO SCALE NOT TO SCALE
NOT TO SCALE
FLOOR/WALL PENETRATION - RATED FIRE BARRIER
NOT TO SCALE
PIPE PENETRATION THOUGH VAULT BELOW GRADE
EXHAUST FAN DUCTWORK CONNECTION
NOT TO SCALE 7
TYPICAL ISOLATION VALVE DETAIL
NOT TO SCALE
Revisions: Date:
REVISION 1 02/07/2025
R E G
I S T E
R E
D P R O F E S S I O N A L E N G I N E E R
NORT H DA KOTA
RUSSELL
SCHULTZ
27753
DATE
08-09-2024
| Sheets |
| MP000 - PIPING COVERSHEET |
| MP101 - EXISTING STEAM TUNNEL SOUTH - LINK 'A' & 'B' PIPING PLANS |
| MP102 - STEAM TUNNEL NORTH - LINK 'C' PIPING PLANS |
| MP103 - STEAM TUNNEL NORTHEAST - LINK 'D' & 'E' PIPING PLAN |
| MP104 - STEAM TUNNEL PIPING - SECTIONS AND VIEWS |
| MP301 - MECHANICAL PIPING DETAILS |
| MP302 - MECHANICAL PIPING DETAILS |
| MP501 - MECHANICAL SCHEDULES |
| MPD101 - STEAM TUNNEL - PIPING DEMOLITION PLAN |
| MV402 - CONTROL DIAGRAMS |
File details come from the government source that posted it. Updated .