MP302.pdf

PDF 635 KB Posted

Attached to
Z1DA--PN: 636A6-23-101 Construct Steam Tunnel (DM)
Solicitation number
36C26325R0017
Issued by

About this file

This is a mechanical piping detail drawing sheet (MP302) showing various technical specifications and installation details for a steam tunnel construction project at a VA facility in Des Moines, IA. The drawing includes seven detailed diagrams with specifications for steam system components.

The drawing details include: (1) end of main steam trap assembly specifications with required pipe sizes and configurations, (2) inverted bucket steam trap assembly showing required components and dimensions, (3) floor/wall penetration details for rated fire barriers, (4) steam pressure reducing station layout for double valve configuration, (5) pipe penetration specifications for vault installations below grade, (6) exhaust fan ductwork connection details with dimensional requirements, and (7) typical isolation valve configurations. The drawings provide specific requirements for materials like Schedule 80 steel pipe, stainless steel components, and high-density polyethylene sleeves, along with precise measurements and installation notes for contractors. This appears to be part of the construction documents package for project number 636A6-23-101.

View the file

Other files

File Type Posted
Site Visit Sign-In Sheet.pdf PDF
36C26325R0017 0005.docx DOCX document
260541 Underground Electrical Construction - 9 pages.pdf PDF
232213 Steam and Condensate Heating Piping - 26 pages.pdf PDF
336300 Steam Energy Distribution - 40 pages.pdf PDF
334613 Foundation Drainage - 7 pages.pdf PDF
329000 Planting - 11 pages.pdf PDF
230923 Direct-Digital Control Systems for HVAC - 67 pages.pdf PDF
271323-13i Communications Optical Fiber Splicing and Terminations - 1 pages.pdf PDF
36C26325R0017 0004.docx DOCX document
02833313 Lead-Based Paint Removal Disposal - 13 pages.pdf PDF
271323i Communications Optical Fiber Backbone Cabling - 3 pages.pdf PDF
265600 Exterior Lighting - 5 pages.pdf PDF
36C26325R0017 0003.docx DOCX document
Wage Determination 2.7.25 - 7 pages.pdf PDF
636A6-23-101 Steam Tunnel Questions - 12 pages.pdf PDF
MP101.pdf PDF
MP501.pdf PDF
C401-S-2.pdf PDF
E104.pdf PDF
C501-N-1.pdf PDF
AE314.pdf PDF
Building 10 Addition 1973 - 9 pages.pdf PDF
AE312.pdf PDF
C601-N.pdf PDF
S201.pdf PDF
AE311.pdf PDF
C401-N-1.pdf PDF
CL701-N.pdf PDF
C401-N-2.pdf PDF
AE520.pdf PDF
MP104.pdf PDF
S001.pdf PDF
S202.pdf PDF
36C26325R0017 0002.pdf PDF
AE101-SB.pdf PDF
S203.pdf PDF
C201-N.pdf PDF
Building 10 Original Construction 1932 - 8 pages.pdf PDF
C401-S-1.pdf PDF
C902.pdf PDF
E103.pdf PDF
MV402.pdf PDF
AE313.pdf PDF
E501.pdf PDF
AE521.pdf PDF
CD101-N.pdf PDF
Tremco Product Infomation.pdf PDF
Wage Determination 1.31.25 - 7 pages.pdf PDF
36C26325R0017 0001.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TO DRAIN

MV

MANUAL

AIR VENT

TO BUILDING LOAD

INVERTED BUCKET

TRAP ASSEMBLY

WELDED TEE

10mm (3/8") TEST CONNECTION

25mm [1"] GATE VALVE

WELDED TEE

CONDENSATE

STEAM PIPE

SCHEDULE 80 STEEL PIPE

CAP

ISOLATION VALVE

ISOLATION VALVE

CAP

300mm[12"]

150mm[6"]

NOTES:

1. ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 300mm [12"] MINIMUM HIGH DRIP LEG FROM

BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 150mm [6"] SCALE POCKET BELOW TRAP INLET.

2. PROVIDE BYPASS PIPING.

SEE DRAWINGS FOR PIPE SIZES

TO RETURN MAIN

SCHEDULE 80 STEEL PIPE

PIPE SIZE SHALL BE SAME SIZE AS TRAP

INVERTED BUCKET TRAP. SEE

PLANS, AND SCHEDULES

DIELECTRIC FITTING WHERE

RETURN IS COPPER PIPE

FL

OW

SCHEDULE 80

STEEL PIPE

BYPASS-INSTALL IN HORIZONTAL PLANE LEVEL WITH

TRAP OR IN VERTICAL PLANE & BELOW TRAP

DRIP LEG OR EQUIPMENT CONNECTION. MAKE

THE SAME SIZE AS THE SUPPLY MAIN OR

EQUIPMENT CONNECTION. SEE NOTE 1

1" GATE VALVE

USE 4-BOLT RAISED FACE FLANGES

10mm (3/8") TEST CONNECTION

0m m 0m m

[1 2"

M

IN

[6 M

IN

T T

T

T

1. SEE FLOOR PLANS FOR PIPE SIZES.

2. SEE EQUIPMENT SCHEDULES FOR VALVE DATA AND PIPE SIZES. INSTALL VALVES AS RECOMMENDED BY MANUFACTURER.

3. BYPASS WILL BE SIZED TO MEET THE CAPACITY OF THE COMBINED CAPACITY OF THE TWO PRV'S.

4. PROVIDE NECESSARY UNIONS FOR THE REMOVAL OF VALVE WITH THREADED CONNECTIONS.

5. SLOPE PILOT CONTROL LINE FROM THE PRESSURE REDUCING VALVE TO DOWNSTREAM STEAM PIPING. MIN SLOPE WILL BE 25mm/300mm (1”/12”).

6. ALL UPSTREAM REDUCERS WILL BE ECCENTRIC IF REQUIRED.

3/4"

REDUCER (TYP.)

IF REQUIRED

PILOT CONTROL LINE

(TYP.)

SEE NOTE 1

SIPHON (TYP.)

NOTES:

NC

NO

SEE NOTE 3

PRV -1

1/4" CONTROL PIPE-PITCH

AWAY FROM PILOT. AVOID

WATER POCKETS. CONNECT

TO MAIN LINE.

5xD1 MIN.

(TYP.) TRIP STOP

VALVE

(TYP.) 5" STEAM MAIN

5" STEAM MAIN

1"

INVERT BUCKET TRAP

ASSEMBLY (TYP.)

STRAINER (TYP.)

5"

5"

5xD1 MIN.

(TYP.)

3/4"

PILOT CONTROL LINE

(TYP.)

PRV-1

1"

STRAINER (TYP.)

SEE NOTE 6

5"

THE SENSING LINE SHALL BE

INSTALLED 4 PIPE DIAMETERS

AFTER THE PIPE SIZE

INCREASE.

THE SENSING LINE SHALL BE

INSTALLED 4 PIPE DIAMETERS

AFTER THE PIPE SIZE

INCREASE.

1/4" CONTROL PIPE-PITCH

AWAY FROM PILOT. AVOID

WATER POCKETS. CONNECT

TO MAIN LINE.

TRIP STOP

VALVE

(TYP.)

INVERT BUCKET TRAP

ASSEMBLY (TYP.)

INVERT BUCKET TRAP

ASSEMBLY (TYP.)

INVERT BUCKET TRAP

ASSEMBLY (TYP.)

T-7 T-8

T-9

T-10

1"

TV-1

TV-1

1"

EXTERIOR SIDE OF CONCRETE CEILING

HIGH DENSITY POLYETHELENE

(HDPE) SLEEVE WITH INTERGRAL

HOLLOW MOLDED WATER STOP RING

4" [100mm] LARGER THAN OUTSIDE

DIAMETER.

304 STAINLESS STEEL SCHEDULE 10 PIPE

CENTERED IN SLEEVE

FLANGED CONNECTION

1/4"x1/4" [6x6mm] IRON

PIPE STRAPREINFORCED CONCRETE

CEILING. SEE STRUCTURAL.

INTERIOR SIDE OF CEILING

WATER STOP

PIPE TERMINATION MINIMUM 36"

ABOVE TOP OF VAULT WITH 1_

WIRE MESH OVER OPENING

12 G ¼" 304 SS Plate

STEEL HATCH -

STRUCTURAL

STAINLESS STEEL BOLTS, NUTS &

WASHERS

304 STAINLESS STEEL

PIPE AND FLASHING

STEEL ACCESS HATCH

VAULT EXTENSION

TOP ABOVE GRADE

PLAN VIEWSECTION VIEW

PIPE FLASHING

FLANGED CONNECTION

BOLT CIRCLE Ø BC

FLANGE HOLE Ø 0.44

QUANTITY 8

END VIEW

0.56 DIA. MOUNTING HOLES

END VIEW SHOWS FROM OUTLET END OF UNIT

AIRFLOW

SIDE VIEW

FAN CONNECTION SCHEDULE

D L H PD BC

in

18.38

14.25 in in in in

182120

17 17 14

19.75

AH

in

9.25

REFER TO PIPE PENETRATION

THROUGH VAULT BELOW

GRADE DETAIL FOR

CONTINUATION

FLANGED

CONNECTION

TAG

EF-2

EF-1

FW

in

14.5

BW

in

L

PDDH

B

FW

BW

AH

TH

CEILING

3" x 3" x ¼"

ANGLE (TYP)

ANCHOR ANGLE TO CONCRETE

CEILING WITH ½" DIAMETER SIMPSON

TITEN HD ANCHORS. 4" EMBEDMENT

MIN.

BACKDRAFT

DAMPER S-60

D

S-60

VAULT/TUNNEL FLOOR

NOTE:

SEE DETAIL 4/MP302 FOR ADDITIONAL DETAILS FOR PRV STATION.

TO HPS

DISTRIBUTION

0-1500kPa

[0-200 PSIG]

AIR-GAP IS

REQUIRED.

TYPICAL FOR ISOLATION

VALVES ON STEAM MAIN

FIRE SEALANT

FIRE SEALANT

NOTE 2

NOTE 3

PENETRATING ITEM

NOTE 4

NOTE 3

NOTE 4

PENETRATING ITEM

NOTE 2

NOTE 3

RATED WALL

(CONSTRUCTION

VARIES)

RATED FLOOR

(CONSTRUCTION

VARIES)

NOTES:

1. THIS GENERAL DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS OR FLOORS. THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW LONGITUDINAL MOVEMENT. REFER TO SPECIFICATION SECTION 21 05 03 FOR SELECTION OF

THROUGH PENETRATION FIRE STOPPING.

2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE DRILL. EACH CONTRACTOR FURNISHES SLEEVE TO G.C., COORDINATES SLEEVE LOCATIONS AND DEBURS SLEEVE. G.C. BUILDS SLEEVE INTO WALL OR FLOOR ALLOWING NO GAP AROUND SLEEVE. IF SLEEVE IS NOT PROVIDED WHEN WALL OR FLOOR IS BUILT, CONTRACTOR SHALL INSTALL SLEEVE. SLEEVE

SIZE SHALL ALLOW ANNULAR SPACE REQUIRED BY THE SELECTED FIRE STOP SYSTEM.

3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED FOR FIRE STOP SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM APPLICATION LISTING. SECURE TO WALL OR FLOOR TO ALLOW LONGITUDINAL MOVEMENT OF

PENETRATING ITEM WITHOUT MOVEMENT OF FIRE BARRIER.

4. WATERTIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL ANGLE FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP. PLACE A BEAD OF WATERPROOF SEALANT BETWEEN FLOOR AND BOTTOM OF ANGLE FRAME.

SECURE TO FLOOR WITH MASONRY ANCHORS IN CORNERS AND ON 12" MAXIMUM CENTERS. MULTIPLE PENETRATING ITEMS MAY

BE ENCLOSED IN ONE FRAME.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

623 26TH AVENUE

ROCK ISLAND, IL 61201

9555 JAMES AVE S. SUITE 200

BLOOMINGTON, MN 55431

C U s e rs

\b b ra n d t\ D o c u m e n ts \1

-M -R b b ra n d tL

P A

S

.r v t

/6

/2

:5

:1

A

M

MP302

MECHANICAL PIPING DETAILS CONSTRUCT STEAM

TUNNEL

DES MOINES, IA

636A6-23-101

3 & 11

08/09/2024 RES RWB

17270

END OF MAIN STEAM TRAP DETAIL

INVERTED BUCKET STEAM TRAP ASSEMBLY

STEAM PRESSURE REDUCING STATION DOUBLE VALVE (1/2 AND 1/2)

NOT TO SCALE NOT TO SCALE NOT TO SCALE

NOT TO SCALE

FLOOR/WALL PENETRATION - RATED FIRE BARRIER

NOT TO SCALE

PIPE PENETRATION THOUGH VAULT BELOW GRADE

EXHAUST FAN DUCTWORK CONNECTION

NOT TO SCALE 7

TYPICAL ISOLATION VALVE DETAIL

NOT TO SCALE

Revisions: Date:

REVISION 1 02/07/2025

R E G

I S T E

R E

D P R O F E S S I O N A L E N G I N E E R

NORT H DA KOTA

RUSSELL

SCHULTZ

27753

DATE

08-09-2024

Sheets
MP000 - PIPING COVERSHEET
MP101 - EXISTING STEAM TUNNEL SOUTH - LINK 'A' & 'B' PIPING PLANS
MP102 - STEAM TUNNEL NORTH - LINK 'C' PIPING PLANS
MP103 - STEAM TUNNEL NORTHEAST - LINK 'D' & 'E' PIPING PLAN
MP104 - STEAM TUNNEL PIPING - SECTIONS AND VIEWS
MP301 - MECHANICAL PIPING DETAILS
MP302 - MECHANICAL PIPING DETAILS
MP501 - MECHANICAL SCHEDULES
MPD101 - STEAM TUNNEL - PIPING DEMOLITION PLAN
MV402 - CONTROL DIAGRAMS

File details come from the government source that posted it. Updated .