MV402.pdf

PDF 571 KB Posted

Attached to
Z1DA--PN: 636A6-23-101 Construct Steam Tunnel (DM)
Solicitation number
36C26325R0017
Issued by

About this file

This is a mechanical control diagram drawing for exhaust fan controls as part of a steam tunnel construction project for the VA Medical Center in Des Moines, IA. The drawing shows the control sequence for exhaust fans EF-1 and EF-2, which are controlled by contractor-furnished and installed thermostats with manual override options located in their respective vaults.

The drawing specifies that each exhaust fan has a dedicated thermostat and includes a backdraft damper for air flow from the tunnel to the vault. The system interfaces with a Facility Management Control System (FMCS) that monitors fan operation through current sensing relays, generating alarms at the operator workstation if insufficient current draw is detected when the fan is commanded to operate. The drawing is dated August 9, 2024, and includes a revision dated February 7, 2025, with the project number 636A6-23-101.

View the file

Other files

File Type Posted
Site Visit Sign-In Sheet.pdf PDF
36C26325R0017 0005.docx DOCX document
260541 Underground Electrical Construction - 9 pages.pdf PDF
232213 Steam and Condensate Heating Piping - 26 pages.pdf PDF
336300 Steam Energy Distribution - 40 pages.pdf PDF
334613 Foundation Drainage - 7 pages.pdf PDF
329000 Planting - 11 pages.pdf PDF
230923 Direct-Digital Control Systems for HVAC - 67 pages.pdf PDF
271323-13i Communications Optical Fiber Splicing and Terminations - 1 pages.pdf PDF
36C26325R0017 0004.docx DOCX document
02833313 Lead-Based Paint Removal Disposal - 13 pages.pdf PDF
271323i Communications Optical Fiber Backbone Cabling - 3 pages.pdf PDF
265600 Exterior Lighting - 5 pages.pdf PDF
36C26325R0017 0003.docx DOCX document
Wage Determination 2.7.25 - 7 pages.pdf PDF
636A6-23-101 Steam Tunnel Questions - 12 pages.pdf PDF
MP101.pdf PDF
MP501.pdf PDF
C401-S-2.pdf PDF
E104.pdf PDF
C501-N-1.pdf PDF
AE314.pdf PDF
Building 10 Addition 1973 - 9 pages.pdf PDF
AE312.pdf PDF
C601-N.pdf PDF
S201.pdf PDF
AE311.pdf PDF
C401-N-1.pdf PDF
CL701-N.pdf PDF
C401-N-2.pdf PDF
AE520.pdf PDF
MP104.pdf PDF
S001.pdf PDF
S202.pdf PDF
36C26325R0017 0002.pdf PDF
AE101-SB.pdf PDF
S203.pdf PDF
C201-N.pdf PDF
Building 10 Original Construction 1932 - 8 pages.pdf PDF
C401-S-1.pdf PDF
C902.pdf PDF
MP302.pdf PDF
E103.pdf PDF
AE313.pdf PDF
E501.pdf PDF
AE521.pdf PDF
CD101-N.pdf PDF
Tremco Product Infomation.pdf PDF
Wage Determination 1.31.25 - 7 pages.pdf PDF
36C26325R0017 0001.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DO

DI

T

FAN

STATUS

CS

START/

STOP

SEQUENCE OF OPERATION:

EXHAUST FAN SHALL BE CONTROLLED BY A CONTRACTOR FURNISHED

AND INSTALLED THERMOSTAT WITH MANUAL OVERRIDE OPTION.

A THERMOSTAT SHALL BE INSTALLED FOR EACH EXHAUST FAN

LOCATED IN EACH RESPECTIVE VAULT.

ALARMS, INTERLOCKS AND SAFETIES:

AN ALARM SHALL BE GENERATED AT THE FMCS OPERATOR

WORKSTATION IN THE EVENT THE FMCS COMMANDS THE EXHAUST FAN

TO OPERATE AND THE CURRENT SENSING RELAY DETECTS

INSUFFICIENT CURRENT DRAW.

BACKDRAFT

DMPR.

AIR FROM TUNNEL

TO VAULT

EXHAUST FAN

THERMOSTAT CONTROL

WITH OVERRIDE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

623 26TH AVENUE

ROCK ISLAND, IL 61201

9555 JAMES AVE S. SUITE 200

BLOOMINGTON, MN 55431

C U s e rs

\b b ra n d t\ D o c u m e n ts \1

-M -R b b ra n d tL

P A

S

.r v t

/6

/2

:5

:1

A

M

MV402

CONTROL DIAGRAMS CONSTRUCT STEAM

TUNNEL

DES MOINES, IA

636A6-23-101

3 & 11

08/09/2024 RES RWB

17270

EF-1 & EF-2 EXHAUST FAN CONTROL

Revisions: Date:

REVISION 1 02/07/2025

R E G

I S T E

R E

D P R O F E S S I O N A L E N G I N E E R

NORT H DA KOTA

RUSSELL

SCHULTZ

27753

DATE

08-09-2024

Sheets
MP000 - PIPING COVERSHEET
MP101 - EXISTING STEAM TUNNEL SOUTH - LINK 'A' & 'B' PIPING PLANS
MP102 - STEAM TUNNEL NORTH - LINK 'C' PIPING PLANS
MP103 - STEAM TUNNEL NORTHEAST - LINK 'D' & 'E' PIPING PLAN
MP104 - STEAM TUNNEL PIPING - SECTIONS AND VIEWS
MP301 - MECHANICAL PIPING DETAILS
MP302 - MECHANICAL PIPING DETAILS
MP501 - MECHANICAL SCHEDULES
MPD101 - STEAM TUNNEL - PIPING DEMOLITION PLAN
MV402 - CONTROL DIAGRAMS

File details come from the government source that posted it. Updated .