This is a mechanical control diagram drawing for exhaust fan controls as part of a steam tunnel construction project for the VA Medical Center in Des Moines, IA. The drawing shows the control sequence for exhaust fans EF-1 and EF-2, which are controlled by contractor-furnished and installed thermostats with manual override options located in their respective vaults.
The drawing specifies that each exhaust fan has a dedicated thermostat and includes a backdraft damper for air flow from the tunnel to the vault. The system interfaces with a Facility Management Control System (FMCS) that monitors fan operation through current sensing relays, generating alarms at the operator workstation if insufficient current draw is detected when the fan is commanded to operate. The drawing is dated August 9, 2024, and includes a revision dated February 7, 2025, with the project number 636A6-23-101.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DO
DI
T
FAN
STATUS
CS
START/
STOP
SEQUENCE OF OPERATION:
EXHAUST FAN SHALL BE CONTROLLED BY A CONTRACTOR FURNISHED
AND INSTALLED THERMOSTAT WITH MANUAL OVERRIDE OPTION.
A THERMOSTAT SHALL BE INSTALLED FOR EACH EXHAUST FAN
LOCATED IN EACH RESPECTIVE VAULT.
ALARMS, INTERLOCKS AND SAFETIES:
AN ALARM SHALL BE GENERATED AT THE FMCS OPERATOR
WORKSTATION IN THE EVENT THE FMCS COMMANDS THE EXHAUST FAN
TO OPERATE AND THE CURRENT SENSING RELAY DETECTS
INSUFFICIENT CURRENT DRAW.
BACKDRAFT
DMPR.
AIR FROM TUNNEL
TO VAULT
EXHAUST FAN
THERMOSTAT CONTROL
WITH OVERRIDE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
623 26TH AVENUE
ROCK ISLAND, IL 61201
9555 JAMES AVE S. SUITE 200
BLOOMINGTON, MN 55431
C U s e rs
\b b ra n d t\ D o c u m e n ts \1
-M -R b b ra n d tL
P A
S
.r v t
/6
/2
:5
:1
A
M
MV402
CONTROL DIAGRAMS CONSTRUCT STEAM
TUNNEL
DES MOINES, IA
636A6-23-101
3 & 11
08/09/2024 RES RWB
17270
EF-1 & EF-2 EXHAUST FAN CONTROL
Revisions: Date:
REVISION 1 02/07/2025
R E G
I S T E
R E
D P R O F E S S I O N A L E N G I N E E R
NORT H DA KOTA
RUSSELL
SCHULTZ
27753
DATE
08-09-2024
| Sheets |
| MP000 - PIPING COVERSHEET |
| MP101 - EXISTING STEAM TUNNEL SOUTH - LINK 'A' & 'B' PIPING PLANS |
| MP102 - STEAM TUNNEL NORTH - LINK 'C' PIPING PLANS |
| MP103 - STEAM TUNNEL NORTHEAST - LINK 'D' & 'E' PIPING PLAN |
| MP104 - STEAM TUNNEL PIPING - SECTIONS AND VIEWS |
| MP301 - MECHANICAL PIPING DETAILS |
| MP302 - MECHANICAL PIPING DETAILS |
| MP501 - MECHANICAL SCHEDULES |
| MPD101 - STEAM TUNNEL - PIPING DEMOLITION PLAN |
| MV402 - CONTROL DIAGRAMS |