This is a mechanical piping plan drawing (MP101) showing details for a steam tunnel construction project at a VA facility in Des Moines, IA. The drawing depicts plans for new steam and condensate piping installations in three sections: the steam tunnel southeast near Building #11, Link 'A' connecting to Vault #1, and Link 'B' extending to Vault #2.
The plan shows specifications for various pipe sizes including 10" S-60 steam lines, 4" CR-15 condensate return lines, and 2" CR-60 condensate lines. Key components include steam traps, isolation valves, pipe guides, pipe anchors, expansion loops (ELI), and exhaust fans (EF-1). The work involves connecting new piping to existing infrastructure, relocating equipment like flash vessels and condensate receivers, and installing pipe support systems every 10 feet in new tunnels. The drawing includes specific instructions for contractors to coordinate with the Contracting Officer Representative (COR) regarding piping shutdowns and notes that new steam/condensate piping must be installed and connected before removing existing 8" steam piping in the existing tunnel.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"C
H S
"C
H R
"C
H S
18"C
HS
18"C
HR
EXISTING 18" CHS & CHR
RACKED ON WALL
EXISTING 18" CHS & CHR UP
TO CHILLER ROOM
EXISTING 4" S-60 & 4"CR-15
TO BUILDINGS 9, 10 & 13
2 1/2" DRIP RETURN
1 1/2" VAC. DETURN
3/4" DRIP LINE
NEW 10" S-60 & 4" CR-15
RACKED ON WALL. SEE
DETAIL 4/MP104
BUILDING 10
BUILDING 11
12"S-60
12"S-60
10"S-60
"S
-6
EXISTING (CR-15) LOW
PRESSURE CONDENSATE TANK
EXISTING S-60 & CR-15 TO
BUILDINGS 9, 10 & 13
S
LO
P E
D N
NEW 10" S-60, 4" CR-15 &
2" CR-60 CONTINUED ON
DRAWING 2/MP101
MPD101
RELOCATE EXISTING FLASH VESSEL, CONDENSATE RECEIVER,
PUMPS, AND PIPING TO THIS LOCATION. MODIFY EXISTING
PIPING AS REQUIRED. REUSE ALL EXISTING VALVES. SEE
DRAWING MPD101 FOR DEMOLITION DETAILS.
NEW STEAM
TRAP
10"S-60
"S
-6
NEW 10" S-60 &
EXISTING 4" CR-15
CONTINUED ON
DRAWING 2/MP101
EXTEND 8" SCHEDULE 40
CARBON STEEL PIPING TO
EXISTING STEAM RELIEF
FROM FLASH TANK.
EXISTING PRESSURE
GAUGE SAVE FOR REUSE
CONNECT NEW 10 S-60
TO EXISTING 12" S-60
AT TRANSITION
CONNECT NEW 10 S-60 TO
EXISTING 12" S-60 MAIN
"S
-6
"S
-6
"C
R -6
"S
-6
4"S-60
CONNECT NEW 4" CR-15 TO
EXISTING 4" CR-15 MAIN
"C
R -6
10"S-60
REINSTALL REMOVED GAUGES
FROM DEMO SHEET
STEAM TRAP (TYP)
SEE DETAIL 2/MP302
RECONNECT EXISTING 4"
S-60 TO NEW 10" S-60
CONNECT NEW 4" CR-15 TO
EXISTING 4" CR-15 MAIN
CONNECT NEW 2" CR-60 TO
EXISTING 4" CR-15 MAIN
"S
-6
"S
-6
"C
R -6
"S
-6
12"S-60
ISOLATION VALVE (TYP)
SEE DETAIL 7/MP302
2"S-60
4"CR-15
4"CR-15
"C
R -1
2"CR-60
2"CR-60
2"CR-60
4"CR-15
"C
R -1
"C
R -1
"C
R -1
"C
R -1
"C
R -1
"C
R -1
2"CR-60
"S
-6
"S
-6
"S
-6
"S
-6
2"CR-60
4"CR-15
R3 ELBOW
R3 ELBOW
R3 ELBOW
"S
-6
NEW 10" S-60 & 4" CR-60
CONTINUED ON
DRAWING 3/MP101
NEW 10" S-60 & 4" CR-15
CONTINUED ON
DRAWING 1/MP101
STEAM TRAP (TYP)
SEE DETAIL 2/MP302
EXISTING
STEAM TRAP
NEW 10" S-60 & EXISTING
4" CR-15 & EXISTING
2"CR-60 CONTINUED ON
DRAWING 1/MP101
EXISTING 6'X5'
STEAM TUNNEL
LINK 'A' NEW
STEAM TUNNEL
VAULT #1
LINK 'B' NEW
STEAM TUNNEL
1-ELI - SEE DETAIL 3/MP301 FOR
EXPANSION LOOP INFORMATION
(TYP)
PIPE GUIDE. SEE DETAIL 3/MP301
FOR PROPER LOCATIONS (TYP)
EXHAUST FAN EF-1
SEE DETAILS 6/MP302 FOR PIPE
THROUGH VAULT
"S
-6
"S
-6
10"S-60
10"S-60
"S
-6
10"S-60
PIPE ANCHOR. SEE
DETAIL 5/MP301 FOR
SIZING (TYP)
PIPE ANCHOR (TYP)
EXISTING 2" CR-60
EXISTING 8" S-60
& 4" CR-15
"C
R -6
"S
-6
"C
R -6
2"CR-60
4"CR-15
"C
R -1
"C
R -6
"C
R -1
"C
R -1
4"CR-15
4"CR-15
"C
R -1
EF-1 GOOSENECK OUTLET. SEE
DETAIL 5/MP302 FOR EXHAUST
DUCTWORK CONNECTION
10"S-60
4-ELI
NEW 10" S-60 & 4" CR-60
& 2" CR-60 CONTINUED
ON DRAWING 2/MP101
END OF MAIN DRIP.
SEE DETAIL 1/MP302
VALVE & CAP NEW
10" S-60 & 4" CR-15
FOR FUTURE USE
LINK 'B' NEW
STEAM TUNNEL
2-ELI
LINK 'B' NEW
STEAM TUNNEL
10"S-60
3-ELI - SEE DETAIL 3/MP301 FOR
EXPANSION LOOP INFORMATION
(TYP)
PIPE GUIDE. SEE DETAIL 3/MP301
FOR PROPER LOCATIONS (TYP)
PIPE ANCHOR
(TYP)
PIPE GUIDE. SEE DETAIL 3/MP301
FOR PROPER LOCATIONS (TYP)
PIPE GUIDE. SEE DETAIL 3/MP301
FOR PROPER LOCATIONS (TYP)
10"S-60
PIPE ANCHOR. SEE DETAIL
5/MP301 FOR SIZING (TYP)
"S
-6
2"CR-60
"C
R -6
"C
R -6
2"CR-60
2"CR-60
TO FUTURE
BUILDING
VAULT #2
"C
R -1
4"CR-15
4"CR-15
4"CR-15
"C
R -1
4"S-60
10"S-60
EXHAUST FAN EF-1
SEE DETAILS 6/MP302 FOR
PIPE THROUGH VAULT
EF-1 GOOSENECK OUTLET. SEE DETAIL 5/MP302
FOR EXHAUST DUCTWORK CONNECTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
623 26TH AVENUE
ROCK ISLAND, IL 61201
9555 JAMES AVE S. SUITE 200
BLOOMINGTON, MN 55431
C U s e rs
\b b ra n d t\ D o c u m e n ts \1
-M -R b b ra n d tL
P A
S
.r v t
/6
/2
:5
:1
A
M
MP101
EXISTING STEAM TUNNEL SOUTH -
LINK 'A' & 'B' PIPING PLANS
CONSTRUCT STEAM
TUNNEL
DES MOINES, IA
636A6-23-101
3 & 11
08/09/2024 RES RWB
17270
GENERAL NOTES:
1. COORDINATE INSTALLATION OF ALL PIPING
AND EQUIPMENT WITH ALL OTHER TRADES.
2. CONTRACTOR SHALL INSTALL A NEW ROLLER
PIPE RACK SUPPORT EVERY 10' IN NEW
TUNNELS. REFER TO MP104/4.
3. CONTRACTOR SHALL INSTALL NEW GUIDE OR
ANCHOR PIPE RACK SUPPORT WHERE NOTED
ON DRAWINGS AND DETAILS. REFER TO
4/MP104.
4. CONTRACTOR SHALL INSTALL THE NEW STEAM
AND CONDENSATE PIPING IN THE NEW TUNNEL
AND TIE-IN TO THE EXISTING PIPING IN VAULT #
1 BEFORE REMOVING THE EXISTING 8" STEAM
PIPING IN THE EXISTING TUNNEL. COORDINATE
ALL PIPING SHUTDOWNS WITH THE COR.
N
O R HT
1/8" = 1'-0"
STEAM TUNNEL SOUTHEAST - BUILDING #11 PIPING PLAN
1/8" = 1'-0"
STEAM TUNNEL SOUTHEAST TO SOUTHWEST - LINK 'A' PIPING PLAN
1/8" = 1'-0"
STEAM TUNNEL SOUTHWEST - LINK 'B' PIPING PLAN
N
O R HT
N
O R HT
VAULT #2
FUTURE BUILDING
BUILDING 10
LINK B
LINK A
VAULT #1
BUILDING 9
BUILDING 11
SOUTH TUNNEL KEY PLAN
N
O R HT
Revisions: Date:
REVISION 1 02/07/2025
R E G
I S T E
R E
D P R O F E S S I O N A L E N G I N E E R
NORT H DA KOTA
RUSSELL
SCHULTZ
27753
DATE
08-09-2024
| Sheets |
| MP000 - PIPING COVERSHEET |
| MP101 - EXISTING STEAM TUNNEL SOUTH - LINK 'A' & 'B' PIPING PLANS |
| MP102 - STEAM TUNNEL NORTH - LINK 'C' PIPING PLANS |
| MP103 - STEAM TUNNEL NORTHEAST - LINK 'D' & 'E' PIPING PLAN |
| MP104 - STEAM TUNNEL PIPING - SECTIONS AND VIEWS |
| MP301 - MECHANICAL PIPING DETAILS |
| MP302 - MECHANICAL PIPING DETAILS |
| MP501 - MECHANICAL SCHEDULES |
| MPD101 - STEAM TUNNEL - PIPING DEMOLITION PLAN |
| MV402 - CONTROL DIAGRAMS |
File details come from the government source that posted it. Updated .