This is a mechanical piping plan drawing (MP101) showing details for a steam tunnel construction project at a VA facility in Des Moines, IA. The drawing depicts plans for new steam and condensate piping installations in three sections: the steam tunnel southeast near Building #11, Link 'A' connecting to Vault #1, and Link 'B' extending to Vault #2.

The plan shows specifications for various pipe sizes including 10" S-60 steam lines, 4" CR-15 condensate return lines, and 2" CR-60 condensate lines. Key components include steam traps, isolation valves, pipe guides, pipe anchors, expansion loops (ELI), and exhaust fans (EF-1). The work involves connecting new piping to existing infrastructure, relocating equipment like flash vessels and condensate receivers, and installing pipe support systems every 10 feet in new tunnels. The drawing includes specific instructions for contractors to coordinate with the Contracting Officer Representative (COR) regarding piping shutdowns and notes that new steam/condensate piping must be installed and connected before removing existing 8" steam piping in the existing tunnel.

View the file

Other files

File Type Posted
Site Visit Sign-In Sheet.pdf PDF
36C26325R0017 0005.docx DOCX document
260541 Underground Electrical Construction - 9 pages.pdf PDF
232213 Steam and Condensate Heating Piping - 26 pages.pdf PDF
336300 Steam Energy Distribution - 40 pages.pdf PDF
334613 Foundation Drainage - 7 pages.pdf PDF
329000 Planting - 11 pages.pdf PDF
230923 Direct-Digital Control Systems for HVAC - 67 pages.pdf PDF
271323-13i Communications Optical Fiber Splicing and Terminations - 1 pages.pdf PDF
36C26325R0017 0004.docx DOCX document
02833313 Lead-Based Paint Removal Disposal - 13 pages.pdf PDF
271323i Communications Optical Fiber Backbone Cabling - 3 pages.pdf PDF
265600 Exterior Lighting - 5 pages.pdf PDF
36C26325R0017 0003.docx DOCX document
Wage Determination 2.7.25 - 7 pages.pdf PDF
636A6-23-101 Steam Tunnel Questions - 12 pages.pdf PDF
MP501.pdf PDF
C401-S-2.pdf PDF
E104.pdf PDF
C501-N-1.pdf PDF
AE314.pdf PDF
Building 10 Addition 1973 - 9 pages.pdf PDF
AE312.pdf PDF
C601-N.pdf PDF
S201.pdf PDF
AE311.pdf PDF
C401-N-1.pdf PDF
CL701-N.pdf PDF
C401-N-2.pdf PDF
AE520.pdf PDF
MP104.pdf PDF
S001.pdf PDF
S202.pdf PDF
36C26325R0017 0002.pdf PDF
AE101-SB.pdf PDF
S203.pdf PDF
C201-N.pdf PDF
Building 10 Original Construction 1932 - 8 pages.pdf PDF
C401-S-1.pdf PDF
C902.pdf PDF
MP302.pdf PDF
E103.pdf PDF
MV402.pdf PDF
AE313.pdf PDF
E501.pdf PDF
AE521.pdf PDF
CD101-N.pdf PDF
Tremco Product Infomation.pdf PDF
Wage Determination 1.31.25 - 7 pages.pdf PDF
36C26325R0017 0001.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"C

H S

"C

H R

"C

H S

18"C

HS

18"C

HR

EXISTING 18" CHS & CHR

RACKED ON WALL

EXISTING 18" CHS & CHR UP

TO CHILLER ROOM

EXISTING 4" S-60 & 4"CR-15

TO BUILDINGS 9, 10 & 13

2 1/2" DRIP RETURN

1 1/2" VAC. DETURN

3/4" DRIP LINE

NEW 10" S-60 & 4" CR-15

RACKED ON WALL. SEE

DETAIL 4/MP104

BUILDING 10

BUILDING 11

12"S-60

12"S-60

10"S-60

"S

-6

EXISTING (CR-15) LOW

PRESSURE CONDENSATE TANK

EXISTING S-60 & CR-15 TO

BUILDINGS 9, 10 & 13

S

LO

P E

D N

NEW 10" S-60, 4" CR-15 &

2" CR-60 CONTINUED ON

DRAWING 2/MP101

MPD101

RELOCATE EXISTING FLASH VESSEL, CONDENSATE RECEIVER,

PUMPS, AND PIPING TO THIS LOCATION. MODIFY EXISTING

PIPING AS REQUIRED. REUSE ALL EXISTING VALVES. SEE

DRAWING MPD101 FOR DEMOLITION DETAILS.

NEW STEAM

TRAP

10"S-60

"S

-6

NEW 10" S-60 &

EXISTING 4" CR-15

CONTINUED ON

DRAWING 2/MP101

EXTEND 8" SCHEDULE 40

CARBON STEEL PIPING TO

EXISTING STEAM RELIEF

FROM FLASH TANK.

EXISTING PRESSURE

GAUGE SAVE FOR REUSE

CONNECT NEW 10 S-60

TO EXISTING 12" S-60

AT TRANSITION

CONNECT NEW 10 S-60 TO

EXISTING 12" S-60 MAIN

"S

-6

"S

-6

"C

R -6

"S

-6

4"S-60

CONNECT NEW 4" CR-15 TO

EXISTING 4" CR-15 MAIN

"C

R -6

10"S-60

REINSTALL REMOVED GAUGES

FROM DEMO SHEET

STEAM TRAP (TYP)

SEE DETAIL 2/MP302

RECONNECT EXISTING 4"

S-60 TO NEW 10" S-60

CONNECT NEW 4" CR-15 TO

EXISTING 4" CR-15 MAIN

CONNECT NEW 2" CR-60 TO

EXISTING 4" CR-15 MAIN

"S

-6

"S

-6

"C

R -6

"S

-6

12"S-60

ISOLATION VALVE (TYP)

SEE DETAIL 7/MP302

2"S-60

4"CR-15

4"CR-15

"C

R -1

2"CR-60

2"CR-60

2"CR-60

4"CR-15

"C

R -1

"C

R -1

"C

R -1

"C

R -1

"C

R -1

"C

R -1

2"CR-60

"S

-6

"S

-6

"S

-6

"S

-6

2"CR-60

4"CR-15

R3 ELBOW

R3 ELBOW

R3 ELBOW

"S

-6

NEW 10" S-60 & 4" CR-60

CONTINUED ON

DRAWING 3/MP101

NEW 10" S-60 & 4" CR-15

CONTINUED ON

DRAWING 1/MP101

STEAM TRAP (TYP)

SEE DETAIL 2/MP302

EXISTING

STEAM TRAP

NEW 10" S-60 & EXISTING

4" CR-15 & EXISTING

2"CR-60 CONTINUED ON

DRAWING 1/MP101

EXISTING 6'X5'

STEAM TUNNEL

LINK 'A' NEW

STEAM TUNNEL

VAULT #1

LINK 'B' NEW

STEAM TUNNEL

1-ELI - SEE DETAIL 3/MP301 FOR

EXPANSION LOOP INFORMATION

(TYP)

PIPE GUIDE. SEE DETAIL 3/MP301

FOR PROPER LOCATIONS (TYP)

EXHAUST FAN EF-1

SEE DETAILS 6/MP302 FOR PIPE

THROUGH VAULT

"S

-6

"S

-6

10"S-60

10"S-60

"S

-6

10"S-60

PIPE ANCHOR. SEE

DETAIL 5/MP301 FOR

SIZING (TYP)

PIPE ANCHOR (TYP)

EXISTING 2" CR-60

EXISTING 8" S-60

& 4" CR-15

"C

R -6

"S

-6

"C

R -6

2"CR-60

4"CR-15

"C

R -1

"C

R -6

"C

R -1

"C

R -1

4"CR-15

4"CR-15

"C

R -1

EF-1 GOOSENECK OUTLET. SEE

DETAIL 5/MP302 FOR EXHAUST

DUCTWORK CONNECTION

10"S-60

4-ELI

NEW 10" S-60 & 4" CR-60

& 2" CR-60 CONTINUED

ON DRAWING 2/MP101

END OF MAIN DRIP.

SEE DETAIL 1/MP302

VALVE & CAP NEW

10" S-60 & 4" CR-15

FOR FUTURE USE

LINK 'B' NEW

STEAM TUNNEL

2-ELI

LINK 'B' NEW

STEAM TUNNEL

10"S-60

3-ELI - SEE DETAIL 3/MP301 FOR

EXPANSION LOOP INFORMATION

(TYP)

PIPE GUIDE. SEE DETAIL 3/MP301

FOR PROPER LOCATIONS (TYP)

PIPE ANCHOR

(TYP)

PIPE GUIDE. SEE DETAIL 3/MP301

FOR PROPER LOCATIONS (TYP)

PIPE GUIDE. SEE DETAIL 3/MP301

FOR PROPER LOCATIONS (TYP)

10"S-60

PIPE ANCHOR. SEE DETAIL

5/MP301 FOR SIZING (TYP)

"S

-6

2"CR-60

"C

R -6

"C

R -6

2"CR-60

2"CR-60

TO FUTURE

BUILDING

VAULT #2

"C

R -1

4"CR-15

4"CR-15

4"CR-15

"C

R -1

4"S-60

10"S-60

EXHAUST FAN EF-1

SEE DETAILS 6/MP302 FOR

PIPE THROUGH VAULT

EF-1 GOOSENECK OUTLET. SEE DETAIL 5/MP302

FOR EXHAUST DUCTWORK CONNECTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

623 26TH AVENUE

ROCK ISLAND, IL 61201

9555 JAMES AVE S. SUITE 200

BLOOMINGTON, MN 55431

C U s e rs

\b b ra n d t\ D o c u m e n ts \1

-M -R b b ra n d tL

P A

S

.r v t

/6

/2

:5

:1

A

M

MP101

EXISTING STEAM TUNNEL SOUTH -

LINK 'A' & 'B' PIPING PLANS

CONSTRUCT STEAM

TUNNEL

DES MOINES, IA

636A6-23-101

3 & 11

08/09/2024 RES RWB

17270

GENERAL NOTES:

1. COORDINATE INSTALLATION OF ALL PIPING

AND EQUIPMENT WITH ALL OTHER TRADES.

2. CONTRACTOR SHALL INSTALL A NEW ROLLER

PIPE RACK SUPPORT EVERY 10' IN NEW

TUNNELS. REFER TO MP104/4.

3. CONTRACTOR SHALL INSTALL NEW GUIDE OR

ANCHOR PIPE RACK SUPPORT WHERE NOTED

ON DRAWINGS AND DETAILS. REFER TO

4/MP104.

4. CONTRACTOR SHALL INSTALL THE NEW STEAM

AND CONDENSATE PIPING IN THE NEW TUNNEL

AND TIE-IN TO THE EXISTING PIPING IN VAULT #

1 BEFORE REMOVING THE EXISTING 8" STEAM

PIPING IN THE EXISTING TUNNEL. COORDINATE

ALL PIPING SHUTDOWNS WITH THE COR.

N

O R HT

1/8" = 1'-0"

STEAM TUNNEL SOUTHEAST - BUILDING #11 PIPING PLAN

1/8" = 1'-0"

STEAM TUNNEL SOUTHEAST TO SOUTHWEST - LINK 'A' PIPING PLAN

1/8" = 1'-0"

STEAM TUNNEL SOUTHWEST - LINK 'B' PIPING PLAN

N

O R HT

N

O R HT

VAULT #2

FUTURE BUILDING

BUILDING 10

LINK B

LINK A

VAULT #1

BUILDING 9

BUILDING 11

SOUTH TUNNEL KEY PLAN

N

O R HT

Revisions: Date:

REVISION 1 02/07/2025

R E G

I S T E

R E

D P R O F E S S I O N A L E N G I N E E R

NORT H DA KOTA

RUSSELL

SCHULTZ

27753

DATE

08-09-2024

Sheets
MP000 - PIPING COVERSHEET
MP101 - EXISTING STEAM TUNNEL SOUTH - LINK 'A' & 'B' PIPING PLANS
MP102 - STEAM TUNNEL NORTH - LINK 'C' PIPING PLANS
MP103 - STEAM TUNNEL NORTHEAST - LINK 'D' & 'E' PIPING PLAN
MP104 - STEAM TUNNEL PIPING - SECTIONS AND VIEWS
MP301 - MECHANICAL PIPING DETAILS
MP302 - MECHANICAL PIPING DETAILS
MP501 - MECHANICAL SCHEDULES
MPD101 - STEAM TUNNEL - PIPING DEMOLITION PLAN
MV402 - CONTROL DIAGRAMS

File details come from the government source that posted it. Updated .