Z1DA--PN: 636A6-23-101 Construct Steam Tunnel (DM)
Solicitation number
36C26325R0017
Issued by

About this file

This is a structural framing plan drawing (sheet S202) for a steam tunnel construction project at the VA facility in Des Moines, IA. The drawing shows detailed plans for the North Tunnel including Links C, D, E, and F, with structural specifications for vaults #3, #4, #5, and #6.

The drawing includes precise elevation measurements for tunnel sections, ranging from approximately 907' to 916', and specifies 12" walls with 16" lids for the link sections. Key structural elements include concrete beams (marked as CB1-CB7), reinforcement specifications of #5 horizontal bars at 1'-6" on center at each face and #5 vertical bars at 8" on center at each face for certain walls. The tunnel design maintains an 8'-0" clear distance between walls throughout. The drawing is dated February 7, 2025, and includes civil stationing dimensions centered between tunnel walls, vault lid details, and ladder specifications referenced in other sheets (S301).

View the file

Other files

File Type Posted
Site Visit Sign-In Sheet.pdf PDF
36C26325R0017 0005.docx DOCX document
260541 Underground Electrical Construction - 9 pages.pdf PDF
232213 Steam and Condensate Heating Piping - 26 pages.pdf PDF
336300 Steam Energy Distribution - 40 pages.pdf PDF
334613 Foundation Drainage - 7 pages.pdf PDF
329000 Planting - 11 pages.pdf PDF
230923 Direct-Digital Control Systems for HVAC - 67 pages.pdf PDF
271323-13i Communications Optical Fiber Splicing and Terminations - 1 pages.pdf PDF
36C26325R0017 0004.docx DOCX document
02833313 Lead-Based Paint Removal Disposal - 13 pages.pdf PDF
271323i Communications Optical Fiber Backbone Cabling - 3 pages.pdf PDF
265600 Exterior Lighting - 5 pages.pdf PDF
36C26325R0017 0003.docx DOCX document
Wage Determination 2.7.25 - 7 pages.pdf PDF
636A6-23-101 Steam Tunnel Questions - 12 pages.pdf PDF
MP101.pdf PDF
MP501.pdf PDF
C401-S-2.pdf PDF
E104.pdf PDF
C501-N-1.pdf PDF
AE314.pdf PDF
Building 10 Addition 1973 - 9 pages.pdf PDF
AE312.pdf PDF
C601-N.pdf PDF
S201.pdf PDF
AE311.pdf PDF
C401-N-1.pdf PDF
CL701-N.pdf PDF
C401-N-2.pdf PDF
AE520.pdf PDF
MP104.pdf PDF
S001.pdf PDF
36C26325R0017 0002.pdf PDF
AE101-SB.pdf PDF
S203.pdf PDF
C201-N.pdf PDF
Building 10 Original Construction 1932 - 8 pages.pdf PDF
C401-S-1.pdf PDF
C902.pdf PDF
MP302.pdf PDF
E103.pdf PDF
MV402.pdf PDF
AE313.pdf PDF
E501.pdf PDF
AE521.pdf PDF
CD101-N.pdf PDF
Tremco Product Infomation.pdf PDF
Wage Determination 1.31.25 - 7 pages.pdf PDF
36C26325R0017 0001.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 313

S301

S301

S301

S301

S301

VAULT #3

VAULT #4

LINK C

LINK D

CB3

CB3

CB3

CB3

C B

C B

C B

CB7

S203

S203

HSS 4x 4x

1/ 4"

CONT.W8x35

S302

L2

EL. = 907'-10 3/4"

T.O. TUNNEL

EL. = 907'-5 5/8"

T.O. TUNNEL

EL. = 909'-1 5/8"

T.O. TUNNEL

EL. = 907'-6 7/8"

T.O. TUNNEL

EL. = 911'-0"

T.O. TUNNEL

EL. = 908'-9 5/8"

T.O. TUNNEL

10+00

10+21.53

11+64.71

12+38.34

TY

P.

4'

0"

TY

P.

4'

0"

EL. = 916'-5 1/4"

T.O. TUNNEL

EL. = 916'-5 1/2"

T.O. TUNNEL

L1

L2

EL. = 911'-2"

T.O. DOOREL. = 911'-2"

T.O. DOOR

S301

S301

S301

S301

S301

S301

S301

S301

________________________________________________________________________________5 S301

S301

VAULT #6

VAULT #5

LINK E

LINKD

CB4

CB4

C B4

C B4

C B5

C B

C B

S203

S203

EL. = 908'-3 5/8"

T.O. TUNNEL

EL. = 908'-2 7/8"

T.O. TUNNEL

EL. = 908'-3 5/8"

T.O. TUNNEL

EL. = 908'-3 7/8"

T.O. TUNNEL

EL. = 908'-1 3/4"

T.O. TUNNEL

15+52.75 14+20.33

TYP.4' - 0

TYP.4' - 0

EL. = 911'-8 1/4"

T.O. TUNNEL

EL. = 911'-6"

T.O. TUNNEL

EL. = 911'-5 3/8"

T.O. DOOR

EL. = 911'-5 3/8"

T.O. DOOR

EL. = 911'-8 1/4"

T.O. DOOR

EL. = 911'-8 1/4"

T.O. DOOR

PROPOSED

MHOP

ADMINISTRATION

VAULT #3

VAULT #4

VAULT #5

VAULT #6

12" WALLS W/ 16" LIDLINK C

LINK D

LINK E

LINK F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL BID

DOCUMENT

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

636A6-23-101

DES MOINES, IA

SITE

623 26TH AVENUE

ROCK ISLAND, IL 61201

9555 JAMES AVE S. SUITE 200

BLOOMINGTON, MN 55431

C U s e rs \d w e n tl a n d \D o c u m e n ts \1

R

V T d w e n tl a n d G

T X

W

.r v t

/7

/2

:0

:2

A

M

FRAMING PLANS CONSTRUCTION STEAM TUNNEL

08/09/2024 AA DW

17270

S202

1/8" = 1'-0"S202

1 NORTH TUNNEL - LINK C & D STRUCTURAL FRAMING PLAN

1/8" = 1'-0"S202

2 NORTH TUNNEL LINKS E & F STRUCTURAL FRAMING PLAN

1" = 60'-0"

NORTH TUNNEL KEYPLAN

SHEET NOTES:

1. VERIFY ALL DIMENSIONS WITH CIVIL DRAWINGS.

2. SEE SHEET S001 FOR GENERAL STRUCTURAL NOTES.

3. CB# - CONCRETE BEAM MARK - SEE BEAM SCHEDULE ON S001.

4. ALL PLAN VIEWS ARE DIMENSIONED WITHOUT REFERENCE TO ELEVATION CHANGES.

KEYNOTES:

1 VAULT LID AND LADDER S.D. 9&10/S301 FOR DETAILS.

2 VAULT LID S.D. 10/S301 FOR DETAIS.

3 WALL SHALL BE REINFORCED WITH #5 HORIZONTAL BARS @ 1'-6" O.C. @ EACH FACE

AND #5 VERTICAL BARS @ 8" O.C. @ EACH FACE.

ELI-5

ELI-6

ELI-7

ELI-8

5. CIVIL STATIONING DIMENSIONS ARE LOCATED CENTERED BETWEEN THE TUNNEL

WALLS. TYPICAL TUNNEL WALLS ARE ALL 8'-0" CLEAR DISTANCE BETWEEN WALLS

6. SHADDED REGIONS SHALL BE REINFORCED WITH ADDITIONAL REINFORCEMENT

AS SHOWN IN DETAIL 7/S302.

Revisions: Date:

REVISION #1 2/5/202502/07/2025

Sheets
S001 - NOTE SHEET
S002 - STEAM TUNNEL SITE PLAN
S101 - FOOTING & FOUNDATION PLANS
S102 - FOOTING & FOUNDATION PLAN
S103 - FOOTING & FOUNDATION PLANS
S104 - FOOTING & FOUNDATION PLAN
S201 - FRAMING PLANS
S202 - FRAMING PLANS
S203 - FRAMING PLANS
S301 - FOOTING & FOUNDATION DETAILS
S302 - FOOTING & FOUNDATION DETAILS

File details come from the government source that posted it. Updated .