This is a structural framing plan drawing (sheet S202) for a steam tunnel construction project at the VA facility in Des Moines, IA. The drawing shows detailed plans for the North Tunnel including Links C, D, E, and F, with structural specifications for vaults #3, #4, #5, and #6.
The drawing includes precise elevation measurements for tunnel sections, ranging from approximately 907' to 916', and specifies 12" walls with 16" lids for the link sections. Key structural elements include concrete beams (marked as CB1-CB7), reinforcement specifications of #5 horizontal bars at 1'-6" on center at each face and #5 vertical bars at 8" on center at each face for certain walls. The tunnel design maintains an 8'-0" clear distance between walls throughout. The drawing is dated February 7, 2025, and includes civil stationing dimensions centered between tunnel walls, vault lid details, and ladder specifications referenced in other sheets (S301).
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 313
S301
S301
S301
S301
S301
VAULT #3
VAULT #4
LINK C
LINK D
CB3
CB3
CB3
CB3
C B
C B
C B
CB7
S203
S203
HSS 4x 4x
1/ 4"
CONT.W8x35
S302
L2
EL. = 907'-10 3/4"
T.O. TUNNEL
EL. = 907'-5 5/8"
T.O. TUNNEL
EL. = 909'-1 5/8"
T.O. TUNNEL
EL. = 907'-6 7/8"
T.O. TUNNEL
EL. = 911'-0"
T.O. TUNNEL
EL. = 908'-9 5/8"
T.O. TUNNEL
10+00
10+21.53
11+64.71
12+38.34
TY
P.
4'
0"
TY
P.
4'
0"
EL. = 916'-5 1/4"
T.O. TUNNEL
EL. = 916'-5 1/2"
T.O. TUNNEL
L1
L2
EL. = 911'-2"
T.O. DOOREL. = 911'-2"
T.O. DOOR
S301
S301
S301
S301
S301
S301
S301
S301
________________________________________________________________________________5 S301
S301
VAULT #6
VAULT #5
LINK E
LINKD
CB4
CB4
C B4
C B4
C B5
C B
C B
S203
S203
EL. = 908'-3 5/8"
T.O. TUNNEL
EL. = 908'-2 7/8"
T.O. TUNNEL
EL. = 908'-3 5/8"
T.O. TUNNEL
EL. = 908'-3 7/8"
T.O. TUNNEL
EL. = 908'-1 3/4"
T.O. TUNNEL
15+52.75 14+20.33
TYP.4' - 0
TYP.4' - 0
EL. = 911'-8 1/4"
T.O. TUNNEL
EL. = 911'-6"
T.O. TUNNEL
EL. = 911'-5 3/8"
T.O. DOOR
EL. = 911'-5 3/8"
T.O. DOOR
EL. = 911'-8 1/4"
T.O. DOOR
EL. = 911'-8 1/4"
T.O. DOOR
PROPOSED
MHOP
ADMINISTRATION
VAULT #3
VAULT #4
VAULT #5
VAULT #6
12" WALLS W/ 16" LIDLINK C
LINK D
LINK E
LINK F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL BID
DOCUMENT
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
636A6-23-101
DES MOINES, IA
SITE
623 26TH AVENUE
ROCK ISLAND, IL 61201
9555 JAMES AVE S. SUITE 200
BLOOMINGTON, MN 55431
C U s e rs \d w e n tl a n d \D o c u m e n ts \1
R
V T d w e n tl a n d G
T X
W
.r v t
/7
/2
:0
:2
A
M
FRAMING PLANS CONSTRUCTION STEAM TUNNEL
08/09/2024 AA DW
17270
S202
1/8" = 1'-0"S202
1 NORTH TUNNEL - LINK C & D STRUCTURAL FRAMING PLAN
1/8" = 1'-0"S202
2 NORTH TUNNEL LINKS E & F STRUCTURAL FRAMING PLAN
1" = 60'-0"
NORTH TUNNEL KEYPLAN
SHEET NOTES:
1. VERIFY ALL DIMENSIONS WITH CIVIL DRAWINGS.
2. SEE SHEET S001 FOR GENERAL STRUCTURAL NOTES.
3. CB# - CONCRETE BEAM MARK - SEE BEAM SCHEDULE ON S001.
4. ALL PLAN VIEWS ARE DIMENSIONED WITHOUT REFERENCE TO ELEVATION CHANGES.
KEYNOTES:
1 VAULT LID AND LADDER S.D. 9&10/S301 FOR DETAILS.
2 VAULT LID S.D. 10/S301 FOR DETAIS.
3 WALL SHALL BE REINFORCED WITH #5 HORIZONTAL BARS @ 1'-6" O.C. @ EACH FACE
AND #5 VERTICAL BARS @ 8" O.C. @ EACH FACE.
ELI-5
ELI-6
ELI-7
ELI-8
5. CIVIL STATIONING DIMENSIONS ARE LOCATED CENTERED BETWEEN THE TUNNEL
WALLS. TYPICAL TUNNEL WALLS ARE ALL 8'-0" CLEAR DISTANCE BETWEEN WALLS
6. SHADDED REGIONS SHALL BE REINFORCED WITH ADDITIONAL REINFORCEMENT
AS SHOWN IN DETAIL 7/S302.
Revisions: Date:
REVISION #1 2/5/202502/07/2025
| Sheets |
| S001 - NOTE SHEET |
| S002 - STEAM TUNNEL SITE PLAN |
| S101 - FOOTING & FOUNDATION PLANS |
| S102 - FOOTING & FOUNDATION PLAN |
| S103 - FOOTING & FOUNDATION PLANS |
| S104 - FOOTING & FOUNDATION PLAN |
| S201 - FRAMING PLANS |
| S202 - FRAMING PLANS |
| S203 - FRAMING PLANS |
| S301 - FOOTING & FOUNDATION DETAILS |
| S302 - FOOTING & FOUNDATION DETAILS |
File details come from the government source that posted it. Updated .