AE101-SB.pdf
PDF 487 KB Posted
- Solicitation number
- 36C26325R0017
About this file
This is an architectural drawing sheet showing plans for a steam tunnel construction project at a VA facility in Des Moines, IA. The drawing includes a South Tunnel floor plan for "Link B", an enlarged vault lid plan for Vault #2, general construction notes, and floor plan symbols/legend.
The drawing details the construction requirements for a steam tunnel system connecting Building 10 to other facilities via Link B, including specifications for steel floor hatches (3'x6' and 3'x3'), steam piping support systems, vault structures, and utility crossings. Key features include concrete walls and beams, vent pipes, railings, and gates. The general notes specify important requirements like fireproofing ratings, coordination with mechanical/electrical contractors, access panel specifications (minimum 24"x24"), and restoration requirements for disturbed areas. The drawing is part of 100% Final Bid Documents dated 08/09/2024 for VA project number 636A6-23-101, prepared by consulting firms IMEG and Anderson.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF
CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.
WORK WILL BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS
DUE TO CHANGES AFFECTING STRUCTURAL, ELECTRICAL, MECHANICAL, PLUMBING
AND OTHER SYSTEMS. THIS WORK SHALL BE PART OF THIS CONTRACT. INSPECT
THESE AREAS TO ASCERTAIN WORK REQUIRED AND PERFORM THE WORK IN
ACCORDANCE OF CONTRACT REQUIREMENTS.
2. PROVIDE FIREPROOFING TO THE RATING REQUIRED AS INDICATED IN THE LIFE
SAFETY PLAN, CODE SUMMARY AND PER NFPA ON STRUCTURAL STEEL ELEMENTS.
3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES.
4. PATCH OPENINGS CUT THOUGH RATED CONSTRUCTION WITH MATERIALS
COMPATIBLE WITH EXISTING ASSEMBLY TO RESTORE INTEGRITY OF THE RATING.
RESTORE FINISHES OF DISTURBED AREAS TO LIKE NEW CONDITION.
5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES
AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO PROCEEDING WITH REMODELING.
6. RESTORE EXISTING FIREPROOFING TO RATINGS INDICATED ON LIFE SAFETY PLANS
WITH MATERIALS TO MATCH EXISTING.
7. AT LOCATIONS WHERE EXISTING FIRESTOPPING IS REQUIRED TO BE ALTERED,
REMOVE EXISTING FIRESTOPPING SYSTEM IN ITS ENTIRETY AND REPLACE FIRE
STOPPING SYSTEM WITH NEW FIRESTOPPING MATERIALS THAT MEET THE RATING
REQUIREMENTS OF THE PENETRATION.
8. DIMENSIONS OF EQUIPMENT ARE THOSE OF THE BASIS-OF-DESIGN EQUIPMENT.
VERIFY DIMENSIONS OF ACTUAL EQUIPMENT BEING PROVIDED TO COORDINATE
SPACE REQUIREMENTS.
9. VERIFY DIMENSIONS OF MECHANICAL OR ELECTRICAL EQUIPMENT PRIOR TO
FABRICATING SUPPORTS FOR THE EQUIPMENT.
10. PATCH AREAS DISTURBED OR MODIFIED BY THIS WORK WITH MATERIALS TO
MATCH EXISTING ADJACENT SURFACES OR SCHEDULED FINISHES AND TO A LIKE
NEW CONDITION.
11. PROVIDE ACCESS PANELS WHERE INDICATED ON DRAWINGS AND WHERE
DESCRIBED IN SPECIFICATIONS SECTION 08 31 13. COORDINATE LOCATIONS AND
SIZES REQUIRED (24" X 24" MINIMUM) WITH MECHANICAL, PLUMBING, ELECTRICAL
AND TECHNOLOGY SUBCONTRACTORS.
12. ABBREVIATIONS AND SYMBOLS OF ARCHITECTURAL, STRUCTURAL, MECHANICAL,
AND ELECTRICAL MAY VARY BY DISCIPLINE. SEE RESPECTIVE DISCIPLINE SECTIONS
AND/OR DRAWINGS FOR DEFINITIONS.
13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FIRE
RETARDANT TREATED (FRT) PLYWOOD SURFACE OF SCHEDULED PARTITION FOR
SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE. DO
NOT PAINT OVER FRT LABEL.
14. EVALUATE INTEGRITY OF EXISTING LIFE SAFETY RATED PARTITION ASSEMBLIES
INDICATED BY SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE
INCLUDING PENETRATIONS THOUGH ASSEMBLY AND BASE AND HEAD OF ASSEMBLY.
WHERE GAPS OR DEFICIENCIES ARE FOUND, RESTORE INTEGRITY OF EXISTING
ASSEMBLIES WITH MATERIAL NECESSARY TO MEET REQUIRED RATING OF THE
ASSEMBLIES.
15. DEFINITIONS OF COMMON TERMS.
• FURNISH: TO SUPPLY AND DELIVER TO THE SITE, READY FOR INSTALLATION
• INSTALL: TO PLACE INTO POSITION SERVICE OR USE
• PROVIDE: TO FURNISH AND INSTALL
FLOOR PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL
EXISTING DOOR
AND FRAME TO
REMAIN
DOOR
INTERIOR
BORROWED LIGHT
101B
101A
8'-0"
DIMENSION LINE,
NOMINAL
8'-0" EXTENDED
DIMENSION LINE,
NOMINAL
AE2111A
INTERIOR
ELEVATION
INDICATOR TAG
2B
AE2O1
EXTERIOR
ELEVATION
INDICATOR TAG
1A
203 EQUIPMENT TAG
100 FLOOR SPOT
ELEVATIONWALL TAG
OFFICE
ROOM NAME AND
NUMBER
AE501
1A
DETAIL REFERENCE
TAG
AE2O1
EXTERIOR SECTION
REFERENCE TAG
1A
AE2O1
INTERIOR SECTION
REFERENCE TAG
1A
KEY NOTE
A
GRIDLINE
REVISION TAG
PR01
REVISION CLOUD
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
FP10
B3
CURTIAN WALL TAG
OR
WINDOW TAG
CW1 W3OR
M A
C H
IN
E
S
E E
S H
E E
T
A E
-S
A
BUILDING 10
VAULT #1
LINK B
VAULT #2
EXISTING STEAM TUNNEL
SYSTEM. SEE STRUCTURAL AND
CIVIL
AE101-SA
STEAM PIPING. SEE MECHANICAL
STEAM PIPING SUPPORT SYSTEM.
SEE STRUCTURAL
STEAM TUNNEL. SEE
STRUCTURAL
EXISTING STEAM TUNNEL
SYSTEM. SEE STRUCTURAL AND
CIVIL
STEAM PIPING
EXPANSION LOOP.
SEE MECHANICAL
FE
FE
FE
FE
AE101-SB
AE314
AE314
AE313TYP
ELI-2
ELI-3
ELI-4
UTILITY CROSSING INSIDE
TUNNEL. SEE CIVIL &
STRUCTURAL
VAULT LID PLAN
VAULT LID PLAN
LINE OF HATCH ABOVE. SEE
STRUCTURAL
LINE OF HATCH ABOVE. SEE
STRUCTURAL
3'-0" x 6'-0" RO STEEL FLOOR
HATCH. SEE SPEC 08 31 00
OUTLINE OF HATCH OPENING
CONCRETE BEAM BELOW - SEE
STRUCTURAL
CONCRETE WALL BELOW - SEE
SSTRUCTURAL
VENT PIPE. SEE MECHANICAL
TOP OF VAULT. SEE CIVIL
& STRUCTURAL
TUNNEL ROOF BELOW.
SEE CIVIL & STRUCTURAL
7' -3
3'-10 1/4"
AE314
2'-11"
3' -7
/4
GATE. SEE CIVIL
RAILING. SEE CIVIL
HATCH CURB
VAULT CURB - SEE CIVIL &
STRUCTURAL
OUTLINE OF VENT OPENING.
SEE MECHANICAL FOR PIPE
AND SLEEVE DIMENSIONS
3'-0" x 3'-0" RO STEEL FLOOR
HATCH. SEE SPEC 08 31 00
AE314
SIM
1'-6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
623 26TH AVENUE
ROCK ISLAND, IL 61201
9555 JAMES AVE S. SUITE 200
BLOOMINGTON, MN 55431
C U s e rs
\g b a rb a ri
\D o c u m e n ts
\1
-A -R
G io v a n n i- B a rb a ri .r v t
/7
/2
:0
:2
A M
AE101-SB
SOUTH TUNNEL PLAN - LINK B CONSTRUCT STEAM
TUNNEL
DES MOINES, IA
636A6-23-101
SITE
08/09/2024 JU/LK GJB
17270
0 8' 16'4'
VAULT #2
FUTURE BUILDING
BUILDING 10
LINK B
LINK A
VAULT #1
BUILDING 9
BUILDING 11
SOUTH TUNNEL KEY PLAN
1/8" = 1'-0"
SOUTH TUNNEL - LINK B FLOOR PLAN
1/4" = 1'-0"
ENLARGED PLAN - VAULT 2 LID PLAN
SEE CIVIL AND STRUCTURAL DRAWINGS
FOR ADDITIONAL INFOMATION
0 4' 8'2'
Revisions: Date:
REVISION 1 02/07/2025
| Sheets |
| AE101-SB - SOUTH TUNNEL PLAN - LINK B |
File details come from the government source that posted it. Updated .