This is a structural engineering drawing (S201) showing framing plans for a steam tunnel construction project at the VA facility in Des Moines, IA. The drawing includes three detailed plans: an existing structural framing plan, and structural framing plans for "Link A" and "Link B" of the South Tunnel.

The plans show specific design details for tunnel construction including concrete beam placements (marked as CB1-CB6), elevation measurements ranging from 896' to 920', and tunnel wall specifications with reinforcement requirements (#5 horizontal bars at 1'-6" on center and #6 vertical bars at 10" on center at each face). The tunnel design includes two vaults (Vault #1 and #2) connected by Link A and Link B, with typical tunnel walls having 8'-0" clear distance between walls. The drawing indicates connections to existing structures including a warehouse and shops area, boiler/chiller plant, and a 6'x5' existing tunnel. The drawing is dated February 7, 2025, and is marked as a 100% Final Bid Document prepared for the U.S. Department of Veterans Affairs Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
Site Visit Sign-In Sheet.pdf PDF
36C26325R0017 0005.docx DOCX document
260541 Underground Electrical Construction - 9 pages.pdf PDF
232213 Steam and Condensate Heating Piping - 26 pages.pdf PDF
336300 Steam Energy Distribution - 40 pages.pdf PDF
334613 Foundation Drainage - 7 pages.pdf PDF
329000 Planting - 11 pages.pdf PDF
230923 Direct-Digital Control Systems for HVAC - 67 pages.pdf PDF
271323-13i Communications Optical Fiber Splicing and Terminations - 1 pages.pdf PDF
36C26325R0017 0004.docx DOCX document
02833313 Lead-Based Paint Removal Disposal - 13 pages.pdf PDF
271323i Communications Optical Fiber Backbone Cabling - 3 pages.pdf PDF
265600 Exterior Lighting - 5 pages.pdf PDF
36C26325R0017 0003.docx DOCX document
Wage Determination 2.7.25 - 7 pages.pdf PDF
636A6-23-101 Steam Tunnel Questions - 12 pages.pdf PDF
MP101.pdf PDF
MP501.pdf PDF
C401-S-2.pdf PDF
E104.pdf PDF
C501-N-1.pdf PDF
AE314.pdf PDF
Building 10 Addition 1973 - 9 pages.pdf PDF
AE312.pdf PDF
C601-N.pdf PDF
AE311.pdf PDF
C401-N-1.pdf PDF
CL701-N.pdf PDF
C401-N-2.pdf PDF
AE520.pdf PDF
MP104.pdf PDF
S001.pdf PDF
S202.pdf PDF
36C26325R0017 0002.pdf PDF
AE101-SB.pdf PDF
S203.pdf PDF
C201-N.pdf PDF
Building 10 Original Construction 1932 - 8 pages.pdf PDF
C401-S-1.pdf PDF
C902.pdf PDF
MP302.pdf PDF
E103.pdf PDF
MV402.pdf PDF
AE313.pdf PDF
E501.pdf PDF
AE521.pdf PDF
CD101-N.pdf PDF
Tremco Product Infomation.pdf PDF
Wage Determination 1.31.25 - 7 pages.pdf PDF
36C26325R0017 0001.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

J

S301

S301

L1

LINK A

VAULT #1

C B

C B

CB5

CB5

C B

CB1

EL. = 896'-2 3/4"

T.O. TUNNEL

EL. = 896'-2 3/4"

T.O. TUNNEL

EL. = 904'-2 1/4"

T.O. TUNNEL

.8

4' - 0" 4' - 0"

EL. = 904'-3 7/8"

T.O. DOOR

EL. = 904'-3 7/8"

T.O. DOOR

EL. = VER.

T.O. TUNNEL

EL. = VER.

T.O. TUNNEL

S301

S301

S301

S301

S301

S301

VAULT #1

LINK B

VAULT #2

CB3

CB3

CB3

CB5

CB5

CB1

CB1

S203

S203

CB3

S302

S302

S301

EL. = 901'-5 1/2"

T.O. TUNNEL

EL. = 909'-1 1/2"

T.O. TUNNEL

EL. = 913'-8 1/4"

T.O. TUNNEL

EL. = 902'-9 5/8"

T.O. TUNNEL

EL. = 910-4 3/8"

T.O. TUNNEL

EL. = 920'-4"

T.O. TUNNEL

EL. = 904'-2 1/4"

T.O. TUNNEL

2+37.34

2+87.25

.8

TY

P.4'

0"

TY

P.4'

0"

EL. = 920'-5 1/2"

T.O. DOOR

EL. = 904'-3 7/8"

T.O. DOOR

EL. = 904'-3 7/8"

T.O. DOOR

EL. = 917'-2"

T.O. TUNNEL

WAREHOUSE AND

SHOPS

BOILER/CHILLER PLANT

6'x5' EXISTING

TUNNEL

VAULT #1

VAULT #2

LINK A

LINK B

ELI-1

ELI-2

ELI-3

ELI-4

EXISTING

TUNNEL

EXISTING

TUNNEL

L3

BUILDING 11

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL BID

DOCUMENT

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

636A6-23-101

DES MOINES, IA

SITE

623 26TH AVENUE

ROCK ISLAND, IL 61201

9555 JAMES AVE S. SUITE 200

BLOOMINGTON, MN 55431

C U s e rs \d w e n tl a n d \D o c u m e n ts \1

R

V T d w e n tl a n d G

T X

W

.r v t

/7

/2

:0

:2

A

M

FRAMING PLANS CONSTRUCTION STEAM TUNNEL

08/09/2024 AA DW

17270

S201

1/8" = 1'-0"S201

2 SOUTH TUNNEL - LINK A STRUCTURAL FRAMING PLAN

1/8" = 1'-0"S201

3 SOUTH TUNNEL - LINK B STRUCTURAL FRAMING PLAN

1" = 60'-0"

SOUTH TUNNEL KEYPLAN

SHEET NOTES:

1. VERIFY ALL DIMENSIONS WITH CIVIL DRAWINGS.

2. SEE SHEET S001 FOR GENERAL STRUCTURAL NOTES.

3. CB# - CONCRETE BEAM MARK - SEE BEAM SCHEDULE ON S001.

4. ALL PLAN VIEWS ARE DIMENSIONED WITHOUT REFERENCE TO ELEVATION CHANGES.

KEYNOTES:

1 VAULT LID AND LADDER S.D. 9&10/S301 FOR DETAILS.

2 VAULT LID S.D. 10/S301 FOR DETAIS.

3 NEW VAULT LID TO BE CUT INTO EXISTING CONCRETE SEE SPECS FOR LID TYPE.

4 WALL SHALL BE REINFORCED WITH #5 HORIZONTAL BARS @ 1'-6" O.C. @ EACH FACE

AND #6 VERTICAL BARS @ 10" O.C. @ EACH FACE.

1/8" = 1'-0"S201

1 SOUTH TUNNEL - EXISTING STRUTURAL FRAMING PLAN

5. CIVIL STATIONING DIMENSIONS ARE LOCATED CENTERED BETWEEN THE TUNNEL

WALLS. TYPICAL TUNNEL WALLS ARE ALL 8'-0" CLEAR DISTANCE BETWEEN WALLS

Revisions: Date:

REVISION #1 2/5/202502/07/2025

Sheets
S001 - NOTE SHEET
S002 - STEAM TUNNEL SITE PLAN
S101 - FOOTING & FOUNDATION PLANS
S102 - FOOTING & FOUNDATION PLAN
S103 - FOOTING & FOUNDATION PLANS
S104 - FOOTING & FOUNDATION PLAN
S201 - FRAMING PLANS
S202 - FRAMING PLANS
S203 - FRAMING PLANS
S301 - FOOTING & FOUNDATION DETAILS
S302 - FOOTING & FOUNDATION DETAILS