This document consists of engineering drawings showing detailed tunnel sections for a steam tunnel construction project at the VA facility in Des Moines, IA. The drawings depict various cross-sectional views of a south tunnel system including typical sections, connections to existing infrastructure, and expansion loop details.

The drawings show specifications for a reinforced concrete tunnel structure with waterproofing systems, featuring 10" high pressure steam lines, 4" low pressure condensate lines, and 2" pumped condensate piping with associated support systems. The tunnel includes reinforced concrete walls, lid, footings, and floors, with fluid-applied waterproofing and drainage board systems extending from the top to the footing. The design incorporates lighting, drain systems, geofabric layers, and fill materials as specified in civil drawings. The tunnel sections are drawn at various scales (1-1/2" = 1'-0" to 2-1/2" = 1'-0") and include both new construction and interfaces with existing tunnel infrastructure. The drawing is dated August 9, 2024, with a revision on February 7, 2025, and was prepared by IMEG and Anderson as the designers of record.

View the file

Other files

File Type Posted
Site Visit Sign-In Sheet.pdf PDF
36C26325R0017 0005.docx DOCX document
260541 Underground Electrical Construction - 9 pages.pdf PDF
232213 Steam and Condensate Heating Piping - 26 pages.pdf PDF
336300 Steam Energy Distribution - 40 pages.pdf PDF
334613 Foundation Drainage - 7 pages.pdf PDF
329000 Planting - 11 pages.pdf PDF
230923 Direct-Digital Control Systems for HVAC - 67 pages.pdf PDF
271323-13i Communications Optical Fiber Splicing and Terminations - 1 pages.pdf PDF
36C26325R0017 0004.docx DOCX document
02833313 Lead-Based Paint Removal Disposal - 13 pages.pdf PDF
271323i Communications Optical Fiber Backbone Cabling - 3 pages.pdf PDF
265600 Exterior Lighting - 5 pages.pdf PDF
36C26325R0017 0003.docx DOCX document
Wage Determination 2.7.25 - 7 pages.pdf PDF
636A6-23-101 Steam Tunnel Questions - 12 pages.pdf PDF
MP101.pdf PDF
MP501.pdf PDF
C401-S-2.pdf PDF
E104.pdf PDF
C501-N-1.pdf PDF
AE314.pdf PDF
Building 10 Addition 1973 - 9 pages.pdf PDF
AE312.pdf PDF
C601-N.pdf PDF
S201.pdf PDF
AE311.pdf PDF
C401-N-1.pdf PDF
CL701-N.pdf PDF
C401-N-2.pdf PDF
AE520.pdf PDF
MP104.pdf PDF
S001.pdf PDF
S202.pdf PDF
36C26325R0017 0002.pdf PDF
AE101-SB.pdf PDF
S203.pdf PDF
C201-N.pdf PDF
Building 10 Original Construction 1932 - 8 pages.pdf PDF
C401-S-1.pdf PDF
C902.pdf PDF
MP302.pdf PDF
E103.pdf PDF
MV402.pdf PDF
E501.pdf PDF
AE521.pdf PDF
CD101-N.pdf PDF
Tremco Product Infomation.pdf PDF
Wage Determination 1.31.25 - 7 pages.pdf PDF
36C26325R0017 0001.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING VENT. SEE MECHANICAL

EXISTINGNEW

FILL. SEE CIVIL

LIGHTING. -SEE ELECTRICAL

PIPING SUPPORT SYSTEM.

SEE MECHANICAL

10" HIGH PRESSURE STEAM -

SEE MECHANICAL

4" LOW PRESSURE

CONDENSATE - SEE

MECHANICAL

REINFORCED

CONCRETE FOOTING

/ FLOOR. -SEE

STRUCTURAL

EXISTING TUNNEL AND

WALKWAY SYSTEM.

EXISTING CONCRETE

FLOOR. - SEE STRUCTURAL

REINFORCED CONCRETE

LID. -SEE STRUCTURAL

AE520

SIM/MIR

AE520

SIM/MIR

REINFORCED CONCRETE WALL. -SEE

STRUCTURAL

REINFORCED CONCRETE LID. -SEE

STRUCTURAL

REINFORCED CONCRETE FOOTING / FLOOR. -SEE

STRUCTURAL

DRAIN SYSTEM. SEE CIVIL

FLUID APPLIED WATERPROOFING SYSTEM AND

DRAINAGE BOARD. ALL SIDES AND TOP OF TUNNEL.

EXTEND DOWN TO TOP OF FOOTING.

10" HIGH PRESSURE STEAM - SEE MECHANICAL

PIPING SUPPORT SYSTEM. SEE

MECHANICAL

LIGHTING. -SEE ELECTRICAL

4" LOW PRESSURE CONDENSATE - SEE MECHANICAL

2" PUMPED CONDENSATE - SEE MECHANICAL

10" HPS PIPE AND INSULATION . SEE

MECHANICAL

EXISTING TUNNEL SYSTEM. SEE

CIVIL AND STRUCTURAL

4" LOW PRESSURE CONDENSATE -

SEE MECHANICAL

EXISTING 2" CONDENSATE - SEE

MECHANICAL

AE521

FILL. SEE CIVIL

FILL. SEE CIVIL

GEOFABRIC. SEE CIVILFILL. SEE CIVIL

GRADE - SEE CIVIL DRAWINGS

REINFORCED CONCRETE WALL. -SEE

STRUCTURAL

REINFORCED CONCRETE LID. -

SEE STRUCTURAL

REINFORCED CONCRETE FOOTING / FLOOR. -SEE

STRUCTURAL

DRAIN TILE SYSTEM. SEE CIVIL

FLUID APPLIED WATERPROOFING

SYSTEM AND DRAINAGE BOARD. ALL

SIDES AND TOP OF TUNNEL. EXTEND

DOWN TO TOP OF FOOTING.

AE520

SIM

AE520

10" HIGH PRESSURE STEAM - SEE MECHANICAL

PIPING SUPPORT SYSTEM. SEE

MECHANICAL

LIGHTING. -SEE ELECTRICAL

4" LOW PRESSURE CONDENSATE - SEE MECHANICAL

2" PUMPED CONDENSATE - SEE MECHANICAL

SEE STRUCTURAL

8'-0" TYP

S E

E C

IV

IL

S

T R

U C

T U

R A

L

8' -0

M

IN

FILL. SEE CIVIL

SURFACE - SEE CIVIL DRAWINGS

CAP - SEE CIVIL DRAWINGS

FILL. SEE CIVIL

GEOFABRIC. SEE CIVIL

DRAIN SYSTEM. SEE CIVIL

FLUID APPLIED WATERPROOFING

SYSTEM AND DRAINAGE BOARD.

EXPOSED PORTION OF

TUNNEL / VAULT.

EXISTING TUNNEL

SYSTEM. SEE CIVIL

AND STRUCTURAL

GRADE - SEE CIVIL

GRADE - SEE CIVIL

AE520

SIM

LIGHTING. -SEE ELECTRICAL

AE520

SIM

REINFORCED CONCRETE

LID. -SEE STRUCTURAL

REINFORCED CONCRETE

FLOOR. -SEE STRUCTURAL

REINFORCED CONCRETE

BEAM. -SEE STRUCTURAL

REINFORCED CONCRETE

WALL. -SEE STRUCTURAL

10" HIGH PRESSURE STEAM - SEE MECHANICAL

4" LOW PRESSURE CONDENSATE -

SEE MECHANICAL

2" PUMPED CONDENSATE - SEE

MECHANICAL

PIPING SUPPORT SYSTEM. SEE MECHANICAL

AE521

AE521

10" HPS PIPE AND

INSULATION . SEE

MECHANICAL

4" LOW PRESSURE

CONDENSATE - SEE

MECHANICAL

EXISTING 2"

CONDENSATE - SEE

MECHANICAL

SURFACE - SEE CIVIL DRAWINGS

CAP - SEE CIVIL DRAWINGS

GEOFABRIC. SEE CIVIL

FILL. SEE CIVIL

FILL. SEE CIVIL

SURFACE - SEE CIVIL DRAWINGS

CAP - SEE CIVIL DRAWINGS

GEOFABRIC. SEE CIVIL

FILL. SEE CIVIL

1/2" = 1'-0"

SOUTH TUNNEL SECTION - TYPICAL

1/2" = 1'-0"

SECTION - SOUTH TUNNEL @ EXISTING - NORTH/SOUTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

623 26TH AVENUE

ROCK ISLAND, IL 61201

9555 JAMES AVE S. SUITE 200

BLOOMINGTON, MN 55431

C U s e rs

\g b a rb a ri

\D o c u m e n ts

\1

-A -R

G io v a n n i- B a rb a ri .r v t

/7

/2

:3

:2

A M

AE313

TUNNEL SECTIONS CONSTRUCT STEAM

TUNNEL

DES MOINES, IA

636A6-23-101

3, 11 & SITE

08/09/2024 GJB GJB

17270

1/2" = 1'-0"

SECTION - SOUTH TUNNEL @ EXISTING - EAST/WEST

1/2" = 1'-0"

SECTION - SOUTH TUNNEL EXPANSION LOOP

Revisions: Date:

REVISION 1 02/07/2025

Sheets
AE101-SB - SOUTH TUNNEL PLAN - LINK B
AE311 - WALL, TUNNEL & VALUT SECTIONS
AE312 - VAULT LID SECTIONS
AE313 - TUNNEL SECTIONS
AE314 - VAULT & VAULT LID SECTIONS
AE520 - EXTERIOR SECTION DETAILS
AE521 - EXTERIOR SECTION DETAILS

File details come from the government source that posted it. Updated .