E103.pdf

PDF 350 KB Posted

Attached to
Z1DA--PN: 636A6-23-101 Construct Steam Tunnel (DM)
Solicitation number
36C26325R0017
Issued by

About this file

This is an electrical plan drawing showing the layout of the North Tunnel Links C & D for a VA facility construction project in Rock Island, IL. The drawing, dated February 6, 2025, is prepared at a scale of 1/8" = 1'-0" and shows electrical components and routing for tunnel sections connecting Building 3.

The plan details electrical installations including panel locations, vault specifications (including Vault #4), and various electrical fixtures labeled with codes such as EF-2, ELI-5, ELI-6, and multiple "+48"GFIWP" notations throughout the tunnel layout. The drawing includes an existing electrical manhole location and contains general electrical notes and keyed notes in the upper right corner. The project appears to be part of a larger steam tunnel construction project (636A6-23-101) for the Department of Veterans Affairs, with IMEG and Anderson listed as the consultant and designer of record respectively.

View the file

Other files

File Type Posted
Site Visit Sign-In Sheet.pdf PDF
36C26325R0017 0005.docx DOCX document
260541 Underground Electrical Construction - 9 pages.pdf PDF
232213 Steam and Condensate Heating Piping - 26 pages.pdf PDF
336300 Steam Energy Distribution - 40 pages.pdf PDF
334613 Foundation Drainage - 7 pages.pdf PDF
329000 Planting - 11 pages.pdf PDF
230923 Direct-Digital Control Systems for HVAC - 67 pages.pdf PDF
271323-13i Communications Optical Fiber Splicing and Terminations - 1 pages.pdf PDF
36C26325R0017 0004.docx DOCX document
02833313 Lead-Based Paint Removal Disposal - 13 pages.pdf PDF
271323i Communications Optical Fiber Backbone Cabling - 3 pages.pdf PDF
265600 Exterior Lighting - 5 pages.pdf PDF
36C26325R0017 0003.docx DOCX document
Wage Determination 2.7.25 - 7 pages.pdf PDF
636A6-23-101 Steam Tunnel Questions - 12 pages.pdf PDF
MP101.pdf PDF
MP501.pdf PDF
C401-S-2.pdf PDF
E104.pdf PDF
C501-N-1.pdf PDF
AE314.pdf PDF
Building 10 Addition 1973 - 9 pages.pdf PDF
AE312.pdf PDF
C601-N.pdf PDF
S201.pdf PDF
AE311.pdf PDF
C401-N-1.pdf PDF
CL701-N.pdf PDF
C401-N-2.pdf PDF
AE520.pdf PDF
MP104.pdf PDF
S001.pdf PDF
S202.pdf PDF
36C26325R0017 0002.pdf PDF
AE101-SB.pdf PDF
S203.pdf PDF
C201-N.pdf PDF
Building 10 Original Construction 1932 - 8 pages.pdf PDF
C401-S-1.pdf PDF
C902.pdf PDF
MP302.pdf PDF
MV402.pdf PDF
AE313.pdf PDF
E501.pdf PDF
AE521.pdf PDF
CD101-N.pdf PDF
Tremco Product Infomation.pdf PDF
Wage Determination 1.31.25 - 7 pages.pdf PDF
36C26325R0017 0001.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SS

S S

J

J

J

J

J

ELECTRICAL GENERAL NOTES

1. ALL DEVICES, EQUIPMENT, FIXTURES, AND THE LIKE MUST BE GROUNDED BY USE

OF A PROPERLY SIZED GROUNDING CONDUCTOR. MECHANICAL AND

ELECTRICAL BONDS OF THE METALLIC RACEWAY SYSTEM SHALL BE MAINTAINED.

GROUND AND BOND PER NEC ARTICLE 250.

2. ELECTRICAL CONTRACTOR SHALL PROVIDE TAMPER RESISTANCE RECEPTACLES

PER NEC 406.12.

3. ALL DISCONNECTS ON MECHANICAL EQUIPMENT SHALL BE MOUNTED ON

STRUCTURE TO ALLOW REMOVAL OF THE EQUIPMENT FOR MAINTENANCE WITH A

MINIMUM OF WIRING WORK. VERIFY NEC CLEARANCE REQUIREMENTS ARE MET

PRIOR TO ROUGH-IN.

4. MAINTAIN SERVICE CLEARANCE AROUND MECHANICAL & ELECTRICAL

EQUIPMENT. DO NOT ROUTE PIPING OR CONDUIT IN CLEARANCE SPACE.

5. ALL RECEPTACLE CIRCUITS SHALL HAVE DEDICATED NEUTRAL.

6. INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITE SIDES OF THE

SAME WALL ARE WITHIN 24" OF EACH OTHER.

7. PRIOR TO ROUGH-IN, COORDINATE ALL WALL DEVICES WITH FINAL CASEWORK

ELEVATIONS AND OTHER TRADES. CONFLICTS SHALL BE BROUGHT IMMEDIATELY

TO THE ATTENTION OF THE DESIGN TEAM.

8. ALL FLOOR BOXES SHALL HAVE THEIR EXACT ROUGH-IN LOCATIONS

DETERMINED BY THE DESIGN TEAM THROUGH DIMENSIONED DRAWINGS

APPROVED BY THE OWNER PRIOR TO ROUGH-IN. LOCATIONS SHOWN ARE FOR

BIDDING PURPOSES ONLY.

9. REFER TO TECH SHEETS FOR ADDITIONAL ROUGH-IN INFORMATION OF LOW

VOLTAGE DEVICES.

10. REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS FOR

THE SPECIFIC DEVICE ROUGH-IN AND PLACEMENT. ANY DEVIATIONS FROM THE

ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS SHALL BE

REVIEWED AND APPROVED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.

11. CONTRACTOR SHALL PROVIDE A UL924 RATED TRANSFER DEVICES SERVING ALL

TUNNEL LIGHTING. LIGHTING CONTROLS MANUFACTURER SHALL DETERMINED

EXACT QUANTITIES WITH LIGHTING CONTROL ZONES AND LAYOUTS. ELECTRICAL

CONTRACTOR SHALL EXTEND SWITCHED CONDUCTOR FROM 120V CIRCUIT TO

UL924 DEVICE TO BE USED FOR SENSING AND LIGHTING CONTROL OVERRIDE.

F1

F1

F1

F1

F1

F1

F1

F1

E1

F1

F1

F1

F1

F1

3-B-6E-37

E1

F1

F1

F1

F1

F1

F1

+48"

GFI

WP

+48"

GFI

WP

3-B-6E-36

+48"

GFI

WP

+48"

GFI

WP

+48"

GFI

WP

+48"

GFI

WP

F1

3-B-6E

BUILDING 3

SEE SHEET E104 FOR

CONTINUATION

VAULT #3

VAULT #4

EF-2 VAULT #4

3-B-6E-32

ELI-6

E2

E3

LINK D

ELI-5

LINK C

Panel 3-1-3

E8

E4

+48"

+48"

E11

+48"

+48"

E11

E5

E12+48"

+48"

+48"

GFI

WP

EXR

PANEL 3

APPROXIMATE LOCATION OF

EXISTING ELECTRICAL MANHOLE

E

E14

ELECTRICAL PLAN KEYED NOTES

E1

LOCATION OF UL924 SENSING CIRCUIT SWITCH. SWITCH SHALL BE WIRED

TO OPEN CIRCUIT USED FOR UL924 SENSING PURPOSES. WHEN SWITCH IS

OPENED, UL924 DEVICE SHALL OVERRIDE OCCUPANCY SENSORS

INTEGRAL TO LIGHT FIXTURES AND LINE VOLTAGE SWITCH(ES) SERVING

TUNNEL LIGHT FIXTURES. LIGHTS SHALL REMAIN ON AND UNCONTROLLED

WHEN SWITCH IS OPENED. SWITCH SHALL BE CLEARLY LABELED

"OCCUPANCY OVERRIDE". REFER TO SHEET E501 FOR UL924 TRANSFER

DEVICE DETAIL.

E2

PROVIDE HAND-OFF-AUTO COMBINATION MOTOR STARTER WITH 1 HP

RATED, 1P TOGGLE SWITCH WITH NEMA 1 HOUSING.

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

E3

DISCONNECT POWER FROM EXISTING LOUVER TO BE REMOVED. REMOVE

RACEWAY AND CONDUCTORS BACK TO NEAREST JUNCTION BOX. EXTEND

CIRCUIT TO NEW LOUVER CONTROLLER LOCATION. COORDINATE WITH

MECHANICAL CONTRACTOR.

E4

CIRCUIT SHALL BE (2)#10, #10G, 3/4"C TO LIMIT VOLTAGE DROP TO 3%.

VERIFY CIRCUIT LENGTH AND VOLTAGE DROP PRIOR TO ROUGH-IN.

E5

CIRCUIT SHALL BE (2)#8, #10G, 3/4"C TO LIMIT VOLTAGE DROP TO 3%.

VERIFY CIRCUIT LENGTH AND VOLTAGE DROP PRIOR TO ROUGH-IN.

E6

CIRCUIT SHALL BE (2)#4, #10G, 1-1/4"C TO LIMIT VOLTAGE DROP TO 3%.

VERIFY CIRCUIT LENGTH AND VOLTAGE DROP PRIOR TO ROUGH-IN.

E7

CIRCUIT SHALL BE (2)#3, #8G, 1-1/4"C TO LIMIT VOLTAGE DROP TO 3%.

VERIFY CIRCUIT LENGTH AND VOLTAGE DROP PRIOR TO ROUGH-IN.

E8

REFER TO CIVIL PLANS FOR RELOCATION OF EXISTING SITE LIGHTING

CONDUITS. DOWNTIME AND OUTAGES SHALL BE STRATEGICALLY

MINIMIZED AND COORDINATED CLOSELY WITH OWNER. COOORDINATE

DISCONNECTION OF CIRCUITS WITH CIVIL CONTRACTOR DURING

CONSTRUCTION.

E9

PROVIDE 120V POWER AND ANALOG TELEPHONE CONNECTION TO WALL

MOUNTED BLUE LIGHT CALL STATION EQUAL TO TALKAPHONE TWP-WMSE

WITH ETP-520E CALL STATION. WALL PHONE SHALL BE 316 MARINE GRADE

STAINLESS STEEL AND IP66 RATED. COORDINATE ROUGH-IN LOCATION

WITH ALL TRADES TO AVOID OBSTRUCTIONS. TELEPHONE LINE SHALL BE

TERMINATED TO CALL CONSOLIDATOR LOCATED IN BUILDING 11 TELECOM

ROOM.

E10

APPROXIMATE LOCATION OF BUILDING 11 TELECOM ROOM ON FIRST

FLOOR. PROVIDE 1 ANALOG TELEPHONE LINE TO CALL CONSOLIDATOR

EQUAL TO TALKAPHONE EC-6. PROVIDE 120V POWER TO UPS EQUAL TO

TALKAPHONE ETP-UPS TO POWER EC-6. COORDINATE EXACT MOUNTING

LOCATIONS IN TELECOM ROOM PRIOR TO ROUGH-IN.

E11

PROVIDE 120V POWER AND ANALOG TELEPHONE CONNECTION TO WALL

MOUNTED BLUE LIGHT CALL STATION EQUAL TO TALKAPHONE TWP-WMSE

WITH ETP-520E CALL STATION. WALL PHONE SHALL BE 316 MARINE GRADE

STAINLESS STEEL AND IP66 RATED. COORDINATE ROUGH-IN LOCATION

WITH ALL TRADES TO AVOID OBSTRUCTIONS. TELEPHONE LINE SHALL BE

TERMINATED TO CALL CONSOLIDATOR LOCATED IN BUILDING 3 TELECOM

ROOM.

E12

APPROXIMATE LOCATION OF BUILDING 3 TELECOM ROOM ON FIRST FLOOR.

PROVIDE 1 ANALOG TELEPHONE LINE TO CALL CONSOLIDATOR EQUAL TO

TALKAPHONE EC-6. PROVIDE 120V POWER TO UPS EQUAL TO TALKAPHONE

ETP-UPS TO PWER EC-6. COORDINATE EXACT MOUNTING LOCATIONS IN

TELECOM ROOM PRIOR TO ROUGH-IN.

E13

LOCATION OF 2'x2'x1' JUNCTION BOX FOR CHILLER FLOW SENSOR WIRING.

JUNCTION BOX SHALL BE RELOCATED APPROXIMATELY 3' SOUTH ALONG

WALL. REMOVE CONDUIT AND CONDUCTORS AS REQUIRED. SPLICE

CABLING AT NEW JUNCTION BOX LOCATION MATCHING EXISTING

CONDUCTORS. EXTEND WIRING TO NEW JUNCTION BOX LOCATED ABOVE

DOOR AND SPLICE CIRCUIT TO RESTORE CONTINUITY. COORDINATE WORK

AND CHILLER SHUTDOWN OWNER.

E14

REINSTALL EXISTING LIGHT POLE. RECIRCUIT FROM PANEL 3-1-3 IN

BUILDING 3. PROVIDE DIRECT BURIAL CONDUIT FROM EXISTING

ELECTRICAL MANHOLE MATCHING EXISTING CIRCUIT PROPERTIES. REFER

TO SITE PLAN FOR ADDITIONAL DETAILS AND EXACT LOCATION.

E15

REINSTALL EXISTING SALVAGED LIGHT POLE. CIRCUIT CONTINUITY SHALL

BE MAINTAINED FOR DURATION OF CONSTRUCTION. RECONNECT EXISTING

CIRCUIT AT NEW LOCATION. SPLICES IF REQUIRED SHALL REMAIN

ACCESSIBLE. REFER TO SITE PLAN FOR ADDITIONAL DETAILS AND EXACT

LOCATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

623 26TH AVENUE

ROCK ISLAND, IL 61201

9555 JAMES AVE S. SUITE 200

BLOOMINGTON, MN 55431

C U s e rs \A

W e b e r\ D o c u m e n ts \1

-M

-R a w e b e r9

S

.r v t

/6

/2

:3

:0

A

M

E103

NORTH TUNNEL LINKS C & D CONSTRUCT STEAM

TUNNEL

DES MOINES, IA

636A6-23-101

3 & 11

08/09/2024 ATW Author 17270

1/8" = 1'-0"1

NORTH TUNNEL - LINKS C & D ELECTRICAL PLAN

BUILDING 5

VAULT #6

BUILDING 3

FUTURE

BUILDING

BUILDING 25

VAULT #5

VAULT #4

VAULT #3

LINK E

LINK D

LINK C

NORTH TUNNEL KEY PLAN

Revisions: Date:

REVISION 1 02/07/2025

Sheets
E103 - NORTH TUNNEL LINKS C & D

File details come from the government source that posted it. Updated .