MP501.pdf

PDF 596 KB Posted

Attached to
Z1DA--PN: 636A6-23-101 Construct Steam Tunnel (DM)
Solicitation number
36C26325R0017
Issued by

About this file

This is a mechanical schedules drawing (MP501) for a steam tunnel construction project at the Des Moines VA facility, showing detailed specifications for pressure reducing valves (PRVs), steam traps, trip stop valves, and exhaust fans. The drawing contains multiple equipment schedules detailing specifications for various mechanical components, including a PRV station with 900 lb/hr capacity and 100 PSIG inlet pressure, ten steam traps serving different building areas with capacities ranging from 50-100 lb/hr, and a trip stop valve rated for 900 lb/hr capacity.

The fan schedule specifies five inline fans manufactured by Greenheck, each rated at 1 hp and 115V, with three fans having 1,575 CFM capacity and two having 1,015 CFM capacity. All fans are direct drive and include backdraft dampers. The drawing is part of the 100% Final Bid Documents package (project #636A6-23-101) dated August 9, 2024, prepared by IMEG as consultant and Anderson as designer of record for the Department of Veterans Affairs Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
Site Visit Sign-In Sheet.pdf PDF
36C26325R0017 0005.docx DOCX document
260541 Underground Electrical Construction - 9 pages.pdf PDF
232213 Steam and Condensate Heating Piping - 26 pages.pdf PDF
336300 Steam Energy Distribution - 40 pages.pdf PDF
334613 Foundation Drainage - 7 pages.pdf PDF
329000 Planting - 11 pages.pdf PDF
230923 Direct-Digital Control Systems for HVAC - 67 pages.pdf PDF
271323-13i Communications Optical Fiber Splicing and Terminations - 1 pages.pdf PDF
36C26325R0017 0004.docx DOCX document
02833313 Lead-Based Paint Removal Disposal - 13 pages.pdf PDF
271323i Communications Optical Fiber Backbone Cabling - 3 pages.pdf PDF
265600 Exterior Lighting - 5 pages.pdf PDF
36C26325R0017 0003.docx DOCX document
Wage Determination 2.7.25 - 7 pages.pdf PDF
636A6-23-101 Steam Tunnel Questions - 12 pages.pdf PDF
MP101.pdf PDF
C401-S-2.pdf PDF
E104.pdf PDF
C501-N-1.pdf PDF
AE314.pdf PDF
Building 10 Addition 1973 - 9 pages.pdf PDF
AE312.pdf PDF
C601-N.pdf PDF
S201.pdf PDF
AE311.pdf PDF
C401-N-1.pdf PDF
CL701-N.pdf PDF
C401-N-2.pdf PDF
AE520.pdf PDF
MP104.pdf PDF
S001.pdf PDF
S202.pdf PDF
36C26325R0017 0002.pdf PDF
AE101-SB.pdf PDF
S203.pdf PDF
C201-N.pdf PDF
Building 10 Original Construction 1932 - 8 pages.pdf PDF
C401-S-1.pdf PDF
C902.pdf PDF
MP302.pdf PDF
E103.pdf PDF
MV402.pdf PDF
AE313.pdf PDF
E501.pdf PDF
AE521.pdf PDF
CD101-N.pdf PDF
Tremco Product Infomation.pdf PDF
Wage Determination 1.31.25 - 7 pages.pdf PDF
36C26325R0017 0001.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

623 26TH AVENUE

ROCK ISLAND, IL 61201

9555 JAMES AVE S. SUITE 200

BLOOMINGTON, MN 55431

C U s e rs

\b b ra n d t\ D o c u m e n ts \1

-M -R b b ra n d tL

P A

S

.r v t

/6

/2

:5

:2

A

M

MP501

MECHANICAL SCHEDULES CONSTRUCT STEAM

TUNNEL

DES MOINES, IA

636A6-23-101

3 & 11

08/09/2024 RES RWB

17270

PRV-1 VAULT 3 900 100 22 3/4" SPENCE ED

TAG AREA SERVED CAPACITY LB/HR INLET PRESSURE PSIG OUTLET PRESSURE PSIG VALVE SIZE MANUFACTURER MODEL NOTES

NOTES:

1. COMPLETE STATION TO INCLUDE SAFETY VALVE, BYPASS, STEAM TRAPS, ECT. REFER TO MECHANICAL DETAILS FOR ADDTIONAL REQUIREMENTS.

2. REFER TO SPECIFICATION SECTION 23 22 13 FOR ADDTIONAL COMPONENT INFORMATION.

3. PRV & TRIP STOP VALVE SHALL BE CAST STEEL, NPT, AND FULL PORT.

4. TRIP STOP VALVE SHALL BE INSTALLED IN PLACE OF THE RELIEF VALVE.

PRESSURE REDUCING VALVE SCHEDULE

T-10 PRV INVERTED BUCKET 2 3/4" 50 250 20 ARMSTRONG 970

T-9 PRV INVERTED BUCKET 2 3/4" 50 250 20 ARMSTRONG 970

T-8 PRV INVERTED BUCKET 2 3/4" 50 250 20 ARMSTRONG 970

T-7 PRV INVERTED BUCKET 2 3/4" 50 250 85 ARMSTRONG 970

T-6 LINK E INVERTED BUCKET 2 3/4" 100 250 85 ARMSTRONG 970

T-5 LINK D INVERTED BUCKET 2 3/4" 100 250 85 ARMSTRONG 970

T-4 LINK C INVERTED BUCKET 2 3/4" 100 250 85 ARMSTRONG 970

T-3 LINK B INVERTED BUCKET 2 3/4" 100 250 85 ARMSTRONG 970

T-2 LINK A INVERTED BUCKET 2 3/4" 100 250 85 ARMSTRONG 970

T-1 BUILDING 11 INVERTED BUCKET 2 3/4" 100 250 85 ARMSTRONG 970

TAG AREA SERVED TYPE SAFETY FACTOR SIZE LB/HR MAX ALLOWABLE PRESSURE PRESSURE DIFFERENTIAL MANUFACTURER MODEL NOTES

NOTES:

1. CAPACITY LISTED IS LISTED FOR EACH TRAP AND INCLUDES SAFETY FACTOR. PROVIDE APPROPRIATE ORIFICE TO MEET CAPACITY.

2. SIDE INLET AND OUTLET, SS INTERNALS, CS BODY, AIR VENT.

3. REFER TO PLANS FOR REQUIRED QUANTITIES. IN ADDTION, CONTRACTOR SHALL DETERMINE FINAL QUANTITY OF TRAPS BASED ON FINAL INSTALLTION; EVERY OFFSET AND MAXIMUM OF 200FT.

4. PROVIDE REMOVABLE INSULATION JACKET FOR ALL STEAM TRAPS. COORDINATE WITH SPECIFICATIONS FOR REQUIREMENTS.

TRAP SCHEDULE

TV-1 VAULT 3 900 32 1" SPENCE E5 P125

TAG AREA SERVED CAPACITY LB/HR SET POINT PSIG VALVE SIZE (IN.) MANUFACTURER MAIN VALVE MODEL PILOT MODEL NOTES

NOTES:

1. INSTALLED ON THE MAIN BUILDING FEED AFTER THE PRESSURE REUCING STATION IN PLACE OF THE RELIEF VALVE. REFER TO MECHANICAL DETAILS FOR ADDTIONAL REQUIREMENTS.

2. REFER TO SPECIFICATION SECTION 23 22 13 FOR ADDTIONAL COMPONENT INFORMATION.

3. PRV SHALL BE CAST STEEL, NPT, AND FULL PORT.

TRIP STOP VALVE SCHEDULE

FAN SCHEDULE

TAG LOCATION AREA SERVED CFM

TOTAL EXTERNAL

SP

EQUIPMENT

TYPE DRIVE TYPE FAN RPM BHP MOTOR SIZE

PHASE

NUMBER VOLTAGE

NUMBER OF

POLES MCA (AMPS) MOP (AMPS) FLA MODEL MANUFACTURER NOTES:

EF-1 VAULT #1 LINK 'A' 1,575 CFM 0.5 in-wg INLINEFANS DIRECT 1506 0.24 hp 1 hp 1 115 V 3 16.2 A 25 A 13 A AX-47-37-0415-VG Greenheck PROVIDE BACKDRAFT DAMPER-

EF-1 VAULT #2 LINK 'B' 1,575 CFM 0.5 in-wg INLINEFANS DIRECT 1506 0.24 hp 1 hp 1 115 V 3 16.2 A 25 A 13 A AX-47-37-0415-VG Greenheck PROVIDE BACKDRAFT DAMPER-

EF-2 VAULT #6 LINK 'D' 1,015 CFM 0.5 in-wg INLINEFANS DIRECT 1523 0.13 hp 1 hp 1 115 V 3 16.2 A 25 A 13 A AX-41-31-0317-VG Greenheck PROVIDE BACKDRAFT DAMPER-

EF-2 VAULT #5 "LINK 'C' 1,015 CFM 0.5 in-wg INLINEFANS DIRECT 1523 0.13 hp 1 hp 1 115 V 3 16.2 A 25 A 13 A AX-41-31-0317-VG Greenheck PROVIDE BACKDRAFT DAMPER-

EF-2 VAULT #4 "LINK 'C' 1,015 CFM 0.5 in-wg INLINEFANS DIRECT 1523 0.13 hp 1 hp 1 115 V 3 16.2 A 25 A 13 A AX-41-31-0317-VG Greenheck PROVIDE BACKDRAFT DAMPER-

Revisions: Date:

REVISION 1 02/07/2025

R E G

I S T E

R E

D P R O F E S S I O N A L E N G I N E E R

NORT H DA KOTA

RUSSELL

SCHULTZ

27753

DATE

08-09-2024

Sheets
MP000 - PIPING COVERSHEET
MP101 - EXISTING STEAM TUNNEL SOUTH - LINK 'A' & 'B' PIPING PLANS
MP102 - STEAM TUNNEL NORTH - LINK 'C' PIPING PLANS
MP103 - STEAM TUNNEL NORTHEAST - LINK 'D' & 'E' PIPING PLAN
MP104 - STEAM TUNNEL PIPING - SECTIONS AND VIEWS
MP301 - MECHANICAL PIPING DETAILS
MP302 - MECHANICAL PIPING DETAILS
MP501 - MECHANICAL SCHEDULES
MPD101 - STEAM TUNNEL - PIPING DEMOLITION PLAN
MV402 - CONTROL DIAGRAMS

File details come from the government source that posted it. Updated .