S-102824-291.pdf

PDF 1 MB Posted

Attached to
Z2DA--621-22-121 Renovate Bldg. 204 for Cath Lab II - Engineering
Solicitation number
36C24926R0057
Issued by

About this file

This document is a structural engineering design specification and plan view for a Clean Air Room Equipment System (SS-CARES) ISO Center being installed at VA Mountain Home's Trauma Room. The system is a hybrid aluminum structure measuring 107.37" × 200.50" × 18.00" with a white finish, designed to support a modular plenum frame with integrated hanger rod support systems. The design accommodates maximum kicker forces ranging from 500 to 6,530 pounds and maximum hanger forces up to 6,530 pounds in compression, with individual hanger rods rated for maximum 3,300 pounds tension or 300 pounds compression. The structure utilizes four individual threaded rods (A, B, C, D) at each hanger location to distribute loads to the supporting structure, with the system analyzed for worst-case moving load scenarios along the Phillips rail and boom mount points.

The engineering documentation includes detailed specifications for lateral deflection limits (0.1" maximum), vertical structural stiffness requirements per seismic bracing codes, and allowable deflection limits for ceiling structure per Phillips Healthcare requirements (0.24mm or 0.0093" at plan east rail). The design accounts for combined loads from the hanger rod attachment points and includes frame module configurations designated PM-01 through PM-06, with specific load case designations and collector connection points clearly marked. The drawing is dated February 19, 2025, with design reference S-102824-291, and was prepared by BSE Structural Engineers under project 25-054, with the plan view representing the upper frame configuration.

View the file

Other files

File Type Posted
00 01 10 - Table Of Contents 29072026.pdf PDF
07 42 13 - Insulated Metal Wall Panels.pdf PDF
07.314_AE301 - PENTHOUSE CONSTRUCTION.pdf PDF
01 45 35a - Schedule of SI.pdf PDF
28 05 00 - Common Work Results for Electronic Safety and Security.pdf PDF
07 41 13 - Insulated Metal Roof Panels.pdf PDF
14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf PDF
07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf PDF
FINAL COORDINATION STUDY -- 12-17-19.pdf PDF
09 54 00 - Operating Room Modular Diffuser System.pdf PDF
23 82 00 - Convection Heating and Cooling Units.pdf PDF
14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf PDF
14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf PDF
13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf PDF
10 51 26 - Plastic Lockers and Bench.pdf PDF
09 05 16 - Subsurface Preparation For Floor Finishes.pdf PDF
01 45 35b - Statement of SI.pdf PDF
14.29_E501 - TECHNOLOGY DETAILS.pdf PDF
14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.02_E102 - SECOND FLOOR OVERALL PLAN.pdf PDF
14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.pdf PDF
07.705_AF702.5 - PHASE FIVE FINISH PLANS.pdf PDF
07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.pdf PDF
11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.pdf PDF
Revised Cath Shielding 2024.pdf PDF
Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.xlsx XLSX spreadsheet
36C24926R0057 0003.pdf PDF
28 23 00 - Video Surveillance.pdf PDF
01 45 35 - Special Inspections.pdf PDF
00 01 10 - Table Of Contents.pdf PDF
36C24926R0057 0002.pdf PDF
621-22-121 Site Visit Sign in sheet.pdf PDF
2026-0629 Cath Lab II - BID specs - Add 01.pdf PDF
36C24926R0057 0001.pdf PDF
2026-0629 Cath Lab II - BID Dwgs - Add 01.pdf PDF
Price Breakout Schedule.xlsx XLSX spreadsheet
Contractor EMR Certification Form.docx DOCX document
621-22-121 Renovate B204 for Cath Lab II - Bid Specifications.pdf PDF
36C24926R0057_1.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
621-22-121 Renovate B204 for Cath Lab II - Bid Drawings.pdf PDF
Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
WD TN20260191 2 Jan 2026.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ryan Kubr Cloud+

Ryan Kubr Cloud+

EXAMPLE HANGER LOCATION NEXT PAGE

Ryan Kubr Cloud

BSE Structural Engineers

Kyle Bauer

25-054

VA Mountain Home SK-1

Feb 26, 2025 at 09:37 AM

25-054 VA Mountain Home R…

Ryan Kubr Polygon

Ryan Kubr Callout

STRUCTURAL SUPPORT / COLLECTOR SUPPORTING RODS A, B, C, & D, BY OTHERS

Ryan Kubr Callout CENTER NODE = A + B + C + D. 'MAXIMUM HANGER FORCES' LISTED IS THE WORST CASE TOTAL OF ALL RODS SUPPORTED BY THE COLLECTOR CONNECTION TO SUPPORTING STRUCTURE AT THIS NODE

Ryan Kubr Callout

INDIVIDUAL ROD A, B, C, OR D

MAXIMUM 3300 LB ROD TENSION OR 300 LB COMPRESSION IN EACH ROD APPLIES AT ANY ONE OF THESE 4 RODS AND IS FOR DESIGN OF THE INDIVIDUAL HANGER ROD ONLY. MAXIMUM ROD FORCES IN EACH GROUP VARIES AND WILL NOT DIRECTLY SUM TO THE COLLECTOR TOTAL NOTED.

Ryan Kubr Text Box NOTE THE PLENUM FRAME IS ANALYZED USING MOVING LOADS ALONG THE PHILLIPS RAIL AND BOOM MOUNT POINTS. THE LOADS PROVIDED ARE THE MAXIMUM REACTIONS AND INDIVIDUAL ROD FORCES FROM THE WORST CASE LOAD LOCATIONS. ACTUAL LOADS IN THE HANGER RODS AND COLLECTORS VARY BASED ON LOCATION OF THE MOVING LOADS ALONG THE FRAME.

File details come from the government source that posted it. Updated .