36C24926R0057 0003.pdf

PDF 127 KB Posted

Attached to
Z2DA--621-22-121 Renovate Bldg. 204 for Cath Lab II - Engineering
Solicitation number
36C24926R0057
Issued by

About this file

This is Amendment 0003 to Solicitation 36C24926R0057, issued by the Department of Veterans Affairs Network Contracting Office 9 (90C) located in Murfreesboro, Tennessee for Project 621-22-121. The amendment extends the proposal submission deadline to 10:00 AM EDT on August 10, 2026, with offers to be submitted to jeannette.morphew@va.gov and john.mccomas@va.gov. All other terms and conditions of the solicitation remain unchanged.

The amendment provides additional documentation and information for a catheterization laboratory renovation project at a VA facility. New materials include Request for Information (RFI) responses, a Final Coordination Study dated December 17, 2019, a revised catheterization shielding document from 2024, revised specifications and drawings, and an addendum summary. The attachment list includes comprehensive technical specifications covering insulated metal roof panels, subsurface floor preparation, operating room modular diffuser systems, heating and cooling units, electronic safety and security systems, and video surveillance. The package also includes detailed construction drawings and plans for all project phases, including second floor overall plans, mechanical HVAC plans, plumbing demolition and scheduling diagrams, electrical legends, fire alarm plans for five phases with both demolition and enlarged technical views, lighting technical plans, technology details, and electrical single line diagrams. The solicitation is being administered by Network Contracting Office 9 with Contracting Officer Jeannette Morphew.

View the file

Other files

File Type Posted
00 01 10 - Table Of Contents 29072026.pdf PDF
07 42 13 - Insulated Metal Wall Panels.pdf PDF
07.314_AE301 - PENTHOUSE CONSTRUCTION.pdf PDF
09 54 00 - Operating Room Modular Diffuser System.pdf PDF
23 82 00 - Convection Heating and Cooling Units.pdf PDF
14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf PDF
14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf PDF
13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf PDF
S-102824-291.pdf PDF
01 45 35a - Schedule of SI.pdf PDF
28 05 00 - Common Work Results for Electronic Safety and Security.pdf PDF
07 41 13 - Insulated Metal Roof Panels.pdf PDF
14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf PDF
07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf PDF
FINAL COORDINATION STUDY -- 12-17-19.pdf PDF
10 51 26 - Plastic Lockers and Bench.pdf PDF
09 05 16 - Subsurface Preparation For Floor Finishes.pdf PDF
01 45 35b - Statement of SI.pdf PDF
14.29_E501 - TECHNOLOGY DETAILS.pdf PDF
14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.02_E102 - SECOND FLOOR OVERALL PLAN.pdf PDF
14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.pdf PDF
07.705_AF702.5 - PHASE FIVE FINISH PLANS.pdf PDF
07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.pdf PDF
11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.pdf PDF
Revised Cath Shielding 2024.pdf PDF
Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.xlsx XLSX spreadsheet
28 23 00 - Video Surveillance.pdf PDF
01 45 35 - Special Inspections.pdf PDF
00 01 10 - Table Of Contents.pdf PDF
36C24926R0057 0002.pdf PDF
621-22-121 Site Visit Sign in sheet.pdf PDF
2026-0629 Cath Lab II - BID specs - Add 01.pdf PDF
36C24926R0057 0001.pdf PDF
2026-0629 Cath Lab II - BID Dwgs - Add 01.pdf PDF
621-22-121 Renovate B204 for Cath Lab II - Bid Specifications.pdf PDF
36C24926R0057_1.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
Price Breakout Schedule.xlsx XLSX spreadsheet
Contractor EMR Certification Form.docx DOCX document
621-22-121 Renovate B204 for Cath Lab II - Bid Drawings.pdf PDF
Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
WD TN20260191 2 Jan 2026.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

621-22-121

Department of Veterans Affairs Network Contracting Office 9 (90C)

NCO 9

1639 Medical Center Parkway, Suite 204 Murfreesboro TN 37129

90C

Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 204 Murfreesboro TN 37129

To all Offerors/Bidders

36C24926R0057

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 08-10-2026 10AM EDT x 1

The purpose of this amendment is to provide RFIs and responses, Final Coordination Study, Revised Cath Shielding document, revised specs and drawings with addendum summary.

Proposals are extended until 10AM ET on 8/10/2026 to jeannette.morphew@va.gov and john.mccomas@va.gov

All other terms and conditions remain unchanged.

Jeannette Morphew Contracting Officer

See attached document: Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.

See attached document: FINAL COORDINATION STUDY -- 12-17-19.

See attached document: Revised Cath Shielding 2024.

See attached document: S-102824-291.

See attached document: 2026-0724 Addendum 02 Summary.

See attached document: 00 00 00 - Specification Cover.

See attached document: 00 01 10 - Table Of Contents.

See attached document: 01 45 35 - Special Inspections.

See attached document: 01 45 35a - Schedule of SI.

See attached document: 01 45 35b - Statement of SI.

See attached document: 07 41 13 - Insulated Metal Roof Panels.

See attached document: 09 05 16 - Subsurface Preparation For Floor Finishes.

See attached document: 09 54 00 - Operating Room Modular Diffuser System.

See attached document: 10 51 26 - Plastic Lockers and Bench.

See attached document: 23 82 00 - Convection Heating and Cooling Units.

See attached document: 28 05 00 - Common Work Results for Electronic Safety and Security.

See attached document: 28 23 00 - Video Surveillance.

See attached document: 07.704_AF702.4 - PHASE FOUR FINISH PLANS.

See attached document: 07.705_AF702.5 - PHASE FIVE FINISH PLANS.

See attached document: 07.730_AQ732 - OVERALL EQUIPMENT PLAN.

See attached document: 07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.

See attached document: 11.10_PD102.5 - PLUMBING SECOND FLOOR DEMOLITION

PLAN PHASE 5.

See attached document: 11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.

See attached document: 13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN -

PHASE 4.

See attached document: 13.12_MH103 - MECHANICAL ROOF HVAC PLAN.

See attached document: 14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.

See attached document: 14.02_E102 - SECOND FLOOR OVERALL PLAN.

See attached document: 14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM

PLAN.

See attached document: 14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM

PLAN.

See attached document: 14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM

PLAN.

See attached document: 14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM

PLAN.

See attached document: 14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM

PLAN.

See attached document: 14.16_EE102.1.2 - PHASE 1 ENLARGED TECH FIRE ALARM

PLAN.

See attached document: 14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM

PLAN.

See attached document: 14.22_EE102.3.2 - PHASE 3 ENLARGED TECH FIRE ALARM

PLAN.

See attached document: 14.24_EE102.4.2 - PHASE 4 ENLARGED TECH FIRE ALARM

PLAN.

See attached document: 14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM

PLAN.

See attached document: 14.27_EE102.5.3 - PHASE 5 ENLARGED LIGHTING TECH PLAN.

See attached document: 14.29_E501 - TECHNOLOGY DETAILS.

See attached document: 14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.

File details come from the government source that posted it. Updated .