36C24926R0057 0003.pdf
PDF 127 KB Posted
- Solicitation number
- 36C24926R0057
About this file
This is Amendment 0003 to Solicitation 36C24926R0057, issued by the Department of Veterans Affairs Network Contracting Office 9 (90C) located in Murfreesboro, Tennessee for Project 621-22-121. The amendment extends the proposal submission deadline to 10:00 AM EDT on August 10, 2026, with offers to be submitted to jeannette.morphew@va.gov and john.mccomas@va.gov. All other terms and conditions of the solicitation remain unchanged.
The amendment provides additional documentation and information for a catheterization laboratory renovation project at a VA facility. New materials include Request for Information (RFI) responses, a Final Coordination Study dated December 17, 2019, a revised catheterization shielding document from 2024, revised specifications and drawings, and an addendum summary. The attachment list includes comprehensive technical specifications covering insulated metal roof panels, subsurface floor preparation, operating room modular diffuser systems, heating and cooling units, electronic safety and security systems, and video surveillance. The package also includes detailed construction drawings and plans for all project phases, including second floor overall plans, mechanical HVAC plans, plumbing demolition and scheduling diagrams, electrical legends, fire alarm plans for five phases with both demolition and enlarged technical views, lighting technical plans, technology details, and electrical single line diagrams. The solicitation is being administered by Network Contracting Office 9 with Contracting Officer Jeannette Morphew.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
621-22-121
Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 204 Murfreesboro TN 37129
90C
Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 204 Murfreesboro TN 37129
To all Offerors/Bidders
36C24926R0057
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 08-10-2026 10AM EDT x 1
The purpose of this amendment is to provide RFIs and responses, Final Coordination Study, Revised Cath Shielding document, revised specs and drawings with addendum summary.
Proposals are extended until 10AM ET on 8/10/2026 to jeannette.morphew@va.gov and john.mccomas@va.gov
All other terms and conditions remain unchanged.
Jeannette Morphew Contracting Officer
See attached document: Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.
See attached document: FINAL COORDINATION STUDY -- 12-17-19.
See attached document: Revised Cath Shielding 2024.
See attached document: S-102824-291.
See attached document: 2026-0724 Addendum 02 Summary.
See attached document: 00 00 00 - Specification Cover.
See attached document: 00 01 10 - Table Of Contents.
See attached document: 01 45 35 - Special Inspections.
See attached document: 01 45 35a - Schedule of SI.
See attached document: 01 45 35b - Statement of SI.
See attached document: 07 41 13 - Insulated Metal Roof Panels.
See attached document: 09 05 16 - Subsurface Preparation For Floor Finishes.
See attached document: 09 54 00 - Operating Room Modular Diffuser System.
See attached document: 10 51 26 - Plastic Lockers and Bench.
See attached document: 23 82 00 - Convection Heating and Cooling Units.
See attached document: 28 05 00 - Common Work Results for Electronic Safety and Security.
See attached document: 28 23 00 - Video Surveillance.
See attached document: 07.704_AF702.4 - PHASE FOUR FINISH PLANS.
See attached document: 07.705_AF702.5 - PHASE FIVE FINISH PLANS.
See attached document: 07.730_AQ732 - OVERALL EQUIPMENT PLAN.
See attached document: 07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.
See attached document: 11.10_PD102.5 - PLUMBING SECOND FLOOR DEMOLITION
PLAN PHASE 5.
See attached document: 11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.
See attached document: 13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN -
PHASE 4.
See attached document: 13.12_MH103 - MECHANICAL ROOF HVAC PLAN.
See attached document: 14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.
See attached document: 14.02_E102 - SECOND FLOOR OVERALL PLAN.
See attached document: 14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM
PLAN.
See attached document: 14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM
PLAN.
See attached document: 14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM
PLAN.
See attached document: 14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM
PLAN.
See attached document: 14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM
PLAN.
See attached document: 14.16_EE102.1.2 - PHASE 1 ENLARGED TECH FIRE ALARM
PLAN.
See attached document: 14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM
PLAN.
See attached document: 14.22_EE102.3.2 - PHASE 3 ENLARGED TECH FIRE ALARM
PLAN.
See attached document: 14.24_EE102.4.2 - PHASE 4 ENLARGED TECH FIRE ALARM
PLAN.
See attached document: 14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM
PLAN.
See attached document: 14.27_EE102.5.3 - PHASE 5 ENLARGED LIGHTING TECH PLAN.
See attached document: 14.29_E501 - TECHNOLOGY DETAILS.
See attached document: 14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.
File details come from the government source that posted it. Updated .