This is a technical drawing document for Phase 5 Enlarged Lighting Technology Plan at MT Home, VA Medical Center. The drawing serves as design intent documentation and includes floor plans for the second floor, showing technology and lighting layouts for what appears to be a medical facility renovation or upgrade project.

The document specifies general requirements for coordination with shop drawings and other trades, circuit reuse and numbering protocols, and panel schedule documentation with labeling of all receptacles and switches. Key technical connections include data devices to a network switch in a data rack, card readers to a new Hirsch controller located in telecom room L290A, and speakers to the existing PA system. The drawing package includes door hardware specifications, camera schedule for Phase 5.1, and a legend identifying areas such as sprinklered zones and enlarged areas. The architect/engineer of record is FFE (FFE Engineering & Architecture), and the project is marked as "100% BID DOCUMENTS" and "FULLY SPRINKLERED." The document is identified as drawing number EE102.5.3 with a revision date of 5/22/23, prepared for MT Home, Tennessee.

View the file

Other files

File Type Posted
00 01 10 - Table Of Contents 29072026.pdf PDF
07 42 13 - Insulated Metal Wall Panels.pdf PDF
07.314_AE301 - PENTHOUSE CONSTRUCTION.pdf PDF
01 45 35a - Schedule of SI.pdf PDF
28 05 00 - Common Work Results for Electronic Safety and Security.pdf PDF
07 41 13 - Insulated Metal Roof Panels.pdf PDF
14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf PDF
07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf PDF
FINAL COORDINATION STUDY -- 12-17-19.pdf PDF
09 54 00 - Operating Room Modular Diffuser System.pdf PDF
23 82 00 - Convection Heating and Cooling Units.pdf PDF
14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf PDF
14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf PDF
13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf PDF
S-102824-291.pdf PDF
10 51 26 - Plastic Lockers and Bench.pdf PDF
09 05 16 - Subsurface Preparation For Floor Finishes.pdf PDF
01 45 35b - Statement of SI.pdf PDF
14.29_E501 - TECHNOLOGY DETAILS.pdf PDF
14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.02_E102 - SECOND FLOOR OVERALL PLAN.pdf PDF
14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.pdf PDF
07.705_AF702.5 - PHASE FIVE FINISH PLANS.pdf PDF
07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.pdf PDF
11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.pdf PDF
Revised Cath Shielding 2024.pdf PDF
Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.xlsx XLSX spreadsheet
36C24926R0057 0003.pdf PDF
28 23 00 - Video Surveillance.pdf PDF
01 45 35 - Special Inspections.pdf PDF
36C24926R0057 0002.pdf PDF
621-22-121 Site Visit Sign in sheet.pdf PDF
2026-0629 Cath Lab II - BID specs - Add 01.pdf PDF
36C24926R0057 0001.pdf PDF
2026-0629 Cath Lab II - BID Dwgs - Add 01.pdf PDF
Price Breakout Schedule.xlsx XLSX spreadsheet
Contractor EMR Certification Form.docx DOCX document
621-22-121 Renovate B204 for Cath Lab II - Bid Specifications.pdf PDF
36C24926R0057_1.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
621-22-121 Renovate B204 for Cath Lab II - Bid Drawings.pdf PDF
Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
WD TN20260191 2 Jan 2026.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DS

S

SK

PB

PB

SK

SK

SK

S

AP

S

AN

CR

CR

2AN1-2 - 83

3/16" = 1'-0"1 SECOND FLOOR - LIGHTING PLAN

KEY PLAN

ENTIRE FLOOR

AREA SHOWN ON SHEET

NORTH EXISTING BELOW

CEILING ONLY RELATED WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

F

Au to de sk

D oc s:

//M t H om e

VA

C at h

La b/

FF

E_

R en ov at e C at h

La b

II_

B2

_M

EP

(2

4)

.rv t

7/

/2

2:

:5

PM

EE102.5.3

PHASE 5 ENLARGED LIGHTING

TECH PLAN

06/12/2026 JB IA

RENOVATE BLDG 204 CATH LAB II 621-22-121

MT HOME, TENNESSEE

100% BID DOCUMENTS

MT HOME, VA

MEDICAL

CENTER Approved: Owner

3/16" = 1'-0"3 SECOND FLOOR - TECHNOLOGY PLAN

G E N E R A L N O T E S :

A.

B.

C.

A. DRAWING IS FOR DESIGN INTENT. COORDINATE FINAL REQUIREMENTS WITH APPROVED

SHOP DRAWINGS. COORDINATE INSTALLATION WITH OTHER TRADES.

B. REUSE CIRCUITS MADE SPARE AS PART OF NEW WORK. CIRCUIT NUMBERING IS FOR

REFERENCE ONLY. PROVIDED UPDATED PRINTED PANEL SCHEDULUES AT THE

COMPLETION OF WORK. PROVIDE LABELING OF ALL RECEPTACLES AND SWITCHES.

CONNECT DATA DEVICES TO NETWORK SWITCH IN DATA RACK.

CONNECT CARD READERS TO NEW HIRSCH CONTROLLER LOCATED IN TELECOM ROOM L290A.

CONNECT SPEAKERS TO EXISTING PA SYSTEM.

0 100% BID DOCUMENTS 06/12/2026

1 ADDENDUM 01 06/29/2026

2 ADDENDUM 02 07/24/2026

DOOR HARDWARE

DOOR

NUMBER HARDWARE TYPE MARK Type Mark

C2-4B Card Reader 46

C2-4B DOOR STRIKE 25

C2-4B PUSH BUTTON 456

C2-4B PUSH BUTTON Y

Grand total: 4

06/12/2026

CAMERA SCHEDULE - PHASE 5.1

Manufacturer Model Description Quantity

Avigilon 16.0C-H6ADH-DO1-IR Camera - Unity H6A Dual Head 1