14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf

PDF 277 KB Posted

Attached to
Z2DA--621-22-121 Renovate Bldg. 204 for Cath Lab II - Engineering
Solicitation number
36C24926R0057
Issued by

About this file

This document is an electrical single-line diagram for a medical center facility, specifically the Mt. Home, VA Partial Single Line Diagram for the Corporate Bldg 204 Cath Lab II.

The drawing depicts the electrical distribution system for the facility, including multiple panelboards, transfer switches, transformers, and circuit breakers throughout the first and second floors of the building. Key components shown include main service equipment at 480/277V and 208/120V, various sized circuit breakers ranging from 15A to 400A, multiple automatic transfer switches (ATS) for backup power, uninterruptible power supplies (UPS) rated at 1.1KVA to 75KVA, and isolated power panels rated at 7.5KVA for medical equipment. The diagram identifies critical loads such as the Cath Lab, air handling units (AHU), and various medical equipment served by dedicated circuits and backup systems.

A critical note states that equipment names and identifiers require field verification and relabeling. The contractor must track all transfer switches and panelboards, then apply laminated, engraved nameplates with unique building and branch identifiers using a systematic naming convention (e.g., 204-ATS-CR-1, 204-ATS-LS-1). The scope assumes work on two automatic transfer switches and two panelboards, including upstream and downstream equipment, requiring 12 labels and 12 panel schedules as part of the project deliverables.

View the file

Other files

File Type Posted
00 01 10 - Table Of Contents 29072026.pdf PDF
07 42 13 - Insulated Metal Wall Panels.pdf PDF
Appendix B - HVAC CUTSHEETS.pdf PDF
07.112_AE112.2 - PHASE TWO ENLARGED PLAN.pdf PDF
36C24926R0057 0004.pdf PDF
09 54 00 - Operating Room Modular Diffuser System.pdf PDF
23 82 00 - Convection Heating and Cooling Units.pdf PDF
14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf PDF
13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf PDF
S-102824-291.pdf PDF
01 45 35a - Schedule of SI.pdf PDF
28 05 00 - Common Work Results for Electronic Safety and Security.pdf PDF
07 41 13 - Insulated Metal Roof Panels.pdf PDF
14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf PDF
07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf PDF
FINAL COORDINATION STUDY -- 12-17-19.pdf PDF
28 23 00 - Video Surveillance.pdf PDF
01 45 35 - Special Inspections.pdf PDF
00 01 10 - Table Of Contents.pdf PDF
00 00 00 - Specification Cover.pdf PDF
14.27_EE102.5.3 - PHASE 5 ENLARGED LIGHTING TECH PLAN.pdf PDF
14.16_EE102.1.2 - PHASE 1 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.24_EE102.4.2 - PHASE 4 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.22_EE102.3.2 - PHASE 3 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
11.10_PD102.5 - PLUMBING SECOND FLOOR DEMOLITION PLAN PHASE 5.pdf PDF
2026-0724 Addendum 02 Summary.docx DOCX document
10 51 26 - Plastic Lockers and Bench.pdf PDF
09 05 16 - Subsurface Preparation For Floor Finishes.pdf PDF
01 45 35b - Statement of SI.pdf PDF
14.29_E501 - TECHNOLOGY DETAILS.pdf PDF
14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
36C24926R0057 0002.pdf PDF
621-22-121 Site Visit Sign in sheet.pdf PDF
2026-0629 Cath Lab II - BID specs - Add 01.pdf PDF
36C24926R0057 0001.pdf PDF
2026-0629 Cath Lab II - BID Dwgs - Add 01.pdf PDF
621-22-121 Renovate B204 for Cath Lab II - Bid Specifications.pdf PDF
36C24926R0057_1.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
Price Breakout Schedule.xlsx XLSX spreadsheet
Contractor EMR Certification Form.docx DOCX document
Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
WD TN20260191 2 Jan 2026.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
621-22-121 Renovate B204 for Cath Lab II - Bid Drawings.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLOOR

NORMAL - N

EQUIPMENT - EQ

CRITICAL - C/CR

LIFE SAFETY - LS

480Y/277V - H

208Y/120V - BLANK

1ACRH1

1100kW 1375kVA 480Y/277V 130 C

3PH-4W

SEPARATELY

DERIVED SYSTEM

G

2000A

400A

125A

400A, 480Y/277V, 3PH-4W, 14KAIC, 12.6KAISC, RM. 222A2AEQH1-1

SPARE

125A

RM L225H CATH

LAB UPS

(1) (2) 20A

(3) 20A

(4) 150A

(5)

SPACE

(7-12)

AHU-1

SUPPLY

AHU-1

RETURN

PHILLIPS

PDU

ATS-EQ2

#A - # POLE

RM. L169NE

BLDG. 204

CHILLER

(PREVIOUS CATH

LAB CHILLER)

268 MCA

FIRST FLOOR

SECOND FLOOR

ROOF

BUILDING SECTION

SEQUENTIAL DESIGNATOR

BUILDING 77

(BUILDING 204

BASEMENT RM. L001)

1ALSH1

125A MCB

480/277V

RM. 169

(1)

(E) XFMR

1000kVA 12.47kV:

480/277V 5.79%Z

125A

1600A

(E) MCB

(E)PRIMARY

SWITCH

12.47kV

15CLE-50E

(2) 125A

(3) 400A

ATS-UPS

BLDG. 77

(4) 400A

(5) 400A

(6) 400A

(7) 400A

(8) 400A

(9) 400A

(10) 300A

(11) 250A

(12) 250A

ATS-EL

(E) MSB-204A

1600A

480/277V

65KA SCCR

20.8KAISC

125A

800A

(E) MCB

ATS-EQ

125A

ATS-EL

400A

ATS-LS

400A

ATS-CR

400A

(E) 204-EDP

1600A

480/277V

65KA SCCR

SPACE SPACE300A 125A 400A 400A 400A

(E) 77 204-XSB

1600A

480/277V

35KA SCCR

ATS-EQ3 MRI

#A - # POLE

RM. L169

800A600A

XXDP

600A

MDSS

(1)(1)(1)

ATS-LS

RM. L169

NE

2ALSH1

100A MCB

480/277V

RM. L252

ATS-CR

RM. L169

NE

1ACH1

225A MCB

480/277V

RM. 169

1BCH1

250A MCB

480/277V

RM. L108

2BCH1

60A MCB

480/277V

RM. L226

2BC1

60A MCB

208/120V

RM. L226

T-2BC1

15KVA

ATS-EQ

RM. L169

NE

1ACH2

100A MCB

480/277V

RM. L150

2ACH1

60A MCB

480/277V

RM. L252

2AC1

100A MCB

208/120V

RM. L252

T-2AC1

45KVA

1AEQH1

250A MCB

480/277V

RM. 169

1BEQH1

250A MCB

480/277V

RM. 169

2BEQH1

225A MCB

480/277V

RM. L226

2BEQ1

60A MCB

208/120V

RM. L220

T-2BEQ1

15KVA

ATS-UPS

BLDG. 77

ATS-CR3

400A - 4 POLE

RM. L169

NE

PROVIDE NEW 400A TRANSFER SWITCH.

IP-A-1

ISOLATED

POWER

PANEL

7.5KVA

480 TO 120V

SINGLE PHASE

ISOLATION

MONITOR AND

(4) DUPLEX AND

GROUND JACKS

CATH LAB

UPS

480V

RM. L228

(3) #1, #6G, 1-1/2"C

(4) #500, #2G, 4"C

UTILIZE EXISTING SPARE BREAKER

SWGR-MDSA

400A

N E

2AEQH1-2

400A MCB

480/277V

RM. L207A

MRI MDP

200A MCB

480/277V

RM. L291

MRI

CHILLER

48 FLA

ATS-EQ4

RM. L169

NE

ATS-CR2

RM. L169

NE

2AC2-1

400A MCB

480/277V

RM. L222A

(4) #500, #2G, 4"C

T-2AC2-1

75KVA

400A

SPARE

PROVIDE PANELBOARD

1BNH1

400A MCB

480/277V

RM. L108

2BNH1

100A MCB

480/277V

RM. L226

2BN1-1

175A MCB

208/120V

RM. L226

T-2BN1

45KVA

1CCH1

480/277V

PROVIDE 400A BREAKER OF SAME TYPE AND

INTERRUPTING RATING AS EXISTING CIRCUIT BREAKERS

1ANH1

400A MCB

480/277V

2ANH1

225A MCB

480/277V

RM. L252

2AN1-1

225A MCB

208/120V

RM. L252

T-2AN1

75KVA

2AC2-2

400A MLO

480/277V

RM. L222A

2ANH2

400A MCB

480/277V

RM. L231400A

125A

(3) POLE

SHUNT

TRIP

400A, 480Y, 3PH-4 #KAIC, #KAISC2ACH3

(1) (2)

30A

(2) POLE

(3) (4) (1)

CATH LAB

UPS

480V

RM. L216

(2)

IP-A-2

ISOLATED

POWER

PANEL

7.5KVA

480 TO 120V

SINGLE PHASE

ISOLATION

MONITOR AND

(4) DUPLEX AND

GROUND JACKS

IP-B-1

ISOLATED

POWER

PANEL

7.5KVA

480 TO 120V

SINGLE PHASE

ISOLATION

MONITOR AND

(4) DUPLEX AND

GROUND JACKS

IP-B-2

ISOLATED

POWER

PANEL

7.5KVA

480 TO 120V

SINGLE PHASE

ISOLATION

MONITOR AND

(4) DUPLEX AND

GROUND JACKS

300A (6)

204-ACCU-1

20A

(1) POLE

(5)

CR-UPS-LP1

UPS

1.1KVA

277V/120V

(2) #8, #8G, 3/4"C

(6)

(2) #12, #12G, 3/4"C

80A SHUNT

TRIP

BREAKER

80A SHUNT

TRIP

BREAKER

CATH LAB

EQUIPMENT

CATH LAB

EQUIPMENT

(4) #500, #2G, 4"C

2AN1-2

225A MCB

208/120V

RM. L252

UNKNOWN

2ACH2

125A MCB

480/277V

RM. L207A

2AC2

100A MCB

208/120V

RM. L207A

T-2AC2

30KVA

2AC3

250A MLO

208/120V

RM. L290

EPO

N/O

2BN1-2

225A MLO

208/120V

RM. L226

2ANH3

400A MCB

480/277V

RM. 207A

400A

2AN3-1

225A MCB

208/120V

RM. L227A

T-2AN3

75KVA

2AN3-2

250A MLO

208/120V

RM. L207A

(7) (8)

30A

(2) POLE

30A

(2) POLE

30A

(2) POLE

20A

(1) POLE

20A

(1) POLE

20A

(1) POLE

TVSS

(0)

CR-UPS-LP2

UPS

1.1KVA

277V/120V

CR-UPS-LP3

UPS

1.1KVA

277V/120V

CR-UPS-LP4

UPS

1.1KVA

277V/120V

125A

(3) POLE

SHUNT

TRIP

EPO CONTROL WIRING,

277V FROM CRITICAL

UPS, TYPICAL

EPO

N/O

(E)

(E)

TEMPORARY

CONNECTION CABINET

60A (6)

204-AHU-D

REMOTE

ANNUNCIATOR

PROVIDE CONDUIT AND WIRING FOR GEN.

START SIGNAL. CONNECT TO START SIGNAL

WIRING IN NEARBY EXISTING ATS.

COORDINATE FINAL

LOCATION WITH COR.

16.0KAISC

9.6KAISC

(2) #8, #8G, 3/4"C

PROVIDE 30A, 2 POLE

BREAKER OF THE SAME

TYPE AND INTERRUPTING

RATING AS EXISTING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Au to de sk

D oc s:

//M t H om e

VA

C at h

La b/

FF

E_

R en ov at e C at h

La b

II_

B2

_M

EP

(2

4)

.rv t

7/

/2

2:

:4

PM

E600

PARTIAL SINGLE LINE DIAGRAM

06/12/2026 JB IA

RENOVATE BLDG 204 CATH LAB II 621-22-121

MT HOME, TENNESSEE

100% BID DOCUMENTS

MT HOME, VA

MEDICAL

CENTER Approved: Owner

NTS1 PARTIAL SINGLE LINE - BLDG 204

NOTE: ALL EQUIPMENT SHOW IS EXISTING UNLESS OTHERWISE NOTED OR INDICATED.

TRANSFER SWITCH LABELING N O T E:

A.

B.

EQUIPMENT NAMES AND IDENTIFIERS ON THIS DRAWING ARE FOR REFERENCE ONLY. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY ALL CONNECTIONS. ALTHOUGH EVERY EFFORT WAS MADE TO VERIFY CONNECTIONS, EXACT VERIFICATION COULD NOT BE MADE. MANY ITERATIONS OF PROJECTS THROUGH THE YEARS HAVE LEFT ABNORMAL NAMING CONVENTIONS, DUPLICATED PANELBOARD NAMES, AND CONNECTIONS THAT COULD NOT BE VERIFIED THROUGH REVIEW OF REFERENCE DRAWINGS AND FIELD DOCUMENTATION. INCLUDE COSTS IN SCOPE TO TRACK ALL TRANSFER SWITCHES DOWN AND THEN RE-LABLED WITH LAMINATED, ENGRAVED NAMEPLATES WITH A UNIQUE NUMBER FOR THE BUILDING THE TRANSFER SWITCH IS LOCATED IN AND THE BRANCH THAT IT SERVES. THE PANELBOARDS THAT FEED THE TRANSFER SWTICHES SHOULD BE RE-LABELED WITH LAMINATED AND ENGRAVED NAMEPLATES AS WELL. FOR EXAMPLE, 204-ATS-CR-1, 204-ATS-CR-2, 204- ATS-CR-3, 204-ATS-CR-4.... 204-ATS-LS-1, 204-ATS-LS-2, 204-ATS-LS-3... FOR CR, LS, EE, AND N AS APPLICABLE.

ASSUME (2) ATS AND TWO PANELBOARDS INCLUDING UPSTREAM AND DOWNSTREAM EQUIPMENT (12 LABLES AND 12 PANEL SCHEDULES)

No. Revisions: Date:

0 100% BID DOCUMENTS 06/12/2026

1 ADDENDUM 01 06/29/2026

2 ADDENDUM 02 07/24/2026

06/12/2026