This is a Statement of Special Inspections document for a federal construction project. The project involves the renovation of Building 204 Cath Lab II located at Mt. Home in Johnson City, Tennessee, with project number 621-22-121 and a document date of July 24, 2026. The project is classified with a Seismic Design Category D, Risk Category IV, and a design wind speed of 118 mph. The project is not identified as having hazardous occupancy or attachment to Group H occupancies.

The document establishes inspection requirements for Designated Seismic Systems and Lateral Force Resisting Systems (LFRS) in accordance with UFC 03-301-01 and the 2015 IBC sections 1704.3.2 and 1704.3.3. A Special Inspector of Record (SIOR), a registered professional, is required per UFGS 01-45-35, Section 1.3.8, though the SIOR name and contact information are marked as "TBD." The critical systems requiring inspection include vertical LFRS elements (light gauge straps referenced to drawing 20/S501) and horizontal LFRS elements (metal roof deck and related fastening systems referenced to the roof plan). The final walk-down inspection must be performed by the Registered Design Professional in Responsible Charge and must document observations, compliance with the Schedule of Special Inspections, proper installation of Designated Seismic Systems according to construction and manufacturer requirements, and collection of all required Compliance Certificates.

View the file

Other files

File Type Posted
00 01 10 - Table Of Contents 29072026.pdf PDF
07 42 13 - Insulated Metal Wall Panels.pdf PDF
Appendix B - HVAC CUTSHEETS.pdf PDF
07.112_AE112.2 - PHASE TWO ENLARGED PLAN.pdf PDF
36C24926R0057 0004.pdf PDF
01 45 35a - Schedule of SI.pdf PDF
28 05 00 - Common Work Results for Electronic Safety and Security.pdf PDF
07 41 13 - Insulated Metal Roof Panels.pdf PDF
14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf PDF
07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf PDF
FINAL COORDINATION STUDY -- 12-17-19.pdf PDF
28 23 00 - Video Surveillance.pdf PDF
01 45 35 - Special Inspections.pdf PDF
00 01 10 - Table Of Contents.pdf PDF
00 00 00 - Specification Cover.pdf PDF
14.27_EE102.5.3 - PHASE 5 ENLARGED LIGHTING TECH PLAN.pdf PDF
14.16_EE102.1.2 - PHASE 1 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.24_EE102.4.2 - PHASE 4 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.22_EE102.3.2 - PHASE 3 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
11.10_PD102.5 - PLUMBING SECOND FLOOR DEMOLITION PLAN PHASE 5.pdf PDF
2026-0724 Addendum 02 Summary.docx DOCX document
09 54 00 - Operating Room Modular Diffuser System.pdf PDF
23 82 00 - Convection Heating and Cooling Units.pdf PDF
14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf PDF
14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf PDF
13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf PDF
S-102824-291.pdf PDF
10 51 26 - Plastic Lockers and Bench.pdf PDF
09 05 16 - Subsurface Preparation For Floor Finishes.pdf PDF
14.29_E501 - TECHNOLOGY DETAILS.pdf PDF
14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
36C24926R0057 0002.pdf PDF
621-22-121 Site Visit Sign in sheet.pdf PDF
36C24926R0057 0001.pdf PDF
2026-0629 Cath Lab II - BID Dwgs - Add 01.pdf PDF
2026-0629 Cath Lab II - BID specs - Add 01.pdf PDF
Price Breakout Schedule.xlsx XLSX spreadsheet
Contractor EMR Certification Form.docx DOCX document
Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
WD TN20260191 2 Jan 2026.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
621-22-121 Renovate B204 for Cath Lab II - Bid Specifications.pdf PDF
36C24926R0057_1.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
621-22-121 Renovate B204 for Cath Lab II - Bid Drawings.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project:

Location:

Project #:

Date:

D

IV

No

1. Record observations of Final Walk Down Inspection

2. Document that Inspections were performed in accordance with the Schedule of Special Inspections

3. Document that all Designated Seismic Systems are installed according to construction/manufacturer document requirements, and that Compliance Certificates have been collected (UFC 03 301 01, 2-13.2.2.1).

Statement of Special Inspections Page 1 of 1

Final Walk Down Inspection and Report

(UFC 3 301 01 SECTION 2-2.4.3)

Designated Seismic Systems shall receive a final walk-down inspection by the Registered Design Professional in

Responsible Charge

Final Walk Down Report, Prepared by the Registered Design Professional in Responsible Charge, Must Include:

Metal Roof Deck & Related Fastening System See Roof Plan

Horizontal LFRS Elements Notes

Lateral Force Resisting System (LFRS)

2015 IBC 1704.3.2 and 1704.3.3

Following is a listing of critical main wind/seismic force resisting systems for this structure. Carefully inspect these elements as part of the roles and responsiblities of the Special Inspector (reference the Schedule of Special Inspections for inspection checklists).

Vertical LFRS Elements Notes

Light Gage Straps See 20/S501

Professional Registration Number:

Consulting Firm Name (if any):

SIOR Office AND Mobile Phone Number:

Special Inspector of Record (SIOR)

A Special Inspector of Record (SIOR) IS required (per UFGS 01 45 35, Section 1.3.8)

SIOR Name (Registered Professional): TBD

Project Risk Category:

Project Design Wind Speed (mph):

Hazardous Occupancy or attached to such? Group H Occupancies (2015 IBC, Section 415)

RENOVATE BLDG 204 CATH LAB II

Mt Home, Johnson City, TN

621-22-121

7/24/2026

STATEMENT OF SPECIAL INSPECTIONS

Project Seismic Design Category:

File details come from the government source that posted it. Updated .