This is a mechanical roof HVAC plan drawing for a renovation project at a medical center facility in Mt. Home, Tennessee. The document depicts four floor plan phases showing the layout and installation of air handling units (AHUs), HVAC equipment, ductwork, and associated mechanical systems across multiple levels of the building.

The drawing notes specify several key mechanical requirements: installation of a metal cap on the roof curb to seal penetration (13.10); rebalancing of existing RTU to new design conditions (13.31); connection of new exhaust ductwork to existing roof ventilator (13.32); installation of a steam unit heater for the penthouse (13.33); connection of chilled water piping from a new chiller to the house system with a three-way valve (13.34); installation of a new thermostat to serve the steam unit heater and exhaust fan (13.35); and procurement and installation of a new AHU control panel with coordination for power and data connections (13.36). The design includes new roof-top air-cooled condensing units to serve AHUs 204-AHU-D and 204-AHU-E, and existing equipment modifications to serve new prep and recovery areas. The drawing is fully sprinklered and represents 100% bid documents prepared by FFE Engineering & Architecture as the architect/engineer of record.

View the file

Other files

File Type Posted
07 42 13 - Insulated Metal Wall Panels.pdf PDF
00 01 10 - Table Of Contents 29072026.pdf PDF
Appendix B - HVAC CUTSHEETS.pdf PDF
07.112_AE112.2 - PHASE TWO ENLARGED PLAN.pdf PDF
36C24926R0057 0004.pdf PDF
07.314_AE301 - PENTHOUSE CONSTRUCTION.pdf PDF
07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.pdf PDF
14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.24_EE102.4.2 - PHASE 4 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.22_EE102.3.2 - PHASE 3 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
00 00 00 - Specification Cover.pdf PDF
14.27_EE102.5.3 - PHASE 5 ENLARGED LIGHTING TECH PLAN.pdf PDF
07 41 13 - Insulated Metal Roof Panels.pdf PDF
07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf PDF
14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
23 82 00 - Convection Heating and Cooling Units.pdf PDF
28 23 00 - Video Surveillance.pdf PDF
01 45 35 - Special Inspections.pdf PDF
14.16_EE102.1.2 - PHASE 1 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
00 01 10 - Table Of Contents.pdf PDF
2026-0724 Addendum 02 Summary.docx DOCX document
14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf PDF
07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf PDF
FINAL COORDINATION STUDY -- 12-17-19.pdf PDF
01 45 35a - Schedule of SI.pdf PDF
28 05 00 - Common Work Results for Electronic Safety and Security.pdf PDF
11.10_PD102.5 - PLUMBING SECOND FLOOR DEMOLITION PLAN PHASE 5.pdf PDF
S-102824-291.pdf PDF
09 54 00 - Operating Room Modular Diffuser System.pdf PDF
13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf PDF
36C24926R0057 0003.pdf PDF
14.02_E102 - SECOND FLOOR OVERALL PLAN.pdf PDF
14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.pdf PDF
11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.pdf PDF
09 05 16 - Subsurface Preparation For Floor Finishes.pdf PDF
14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
Revised Cath Shielding 2024.pdf PDF
Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.xlsx XLSX spreadsheet
10 51 26 - Plastic Lockers and Bench.pdf PDF
01 45 35b - Statement of SI.pdf PDF
07.705_AF702.5 - PHASE FIVE FINISH PLANS.pdf PDF
14.29_E501 - TECHNOLOGY DETAILS.pdf PDF
621-22-121 Site Visit Sign in sheet.pdf PDF
36C24926R0057 0002.pdf PDF
2026-0629 Cath Lab II - BID specs - Add 01.pdf PDF
36C24926R0057 0001.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

TTTT

SSSS

RRRR

PPPP

NNNN

MMMM

LLLL

JJJJ

5.2 4.5 3.9

(E) 204 AHU 4

204-AHU 2

204-ACCU-113.15

L-1

32"x24" RA (DN)

24"x22" SA (DN)

EF-2

204-AHU-D 204-AHU-E

24"x24" RA 32 "x

" R

A

"x

" S

A

"x

" R

A

"x

" O

A

16"x50" OA 12"x40" OA

22"x14" EA 60"x14" EA

L-2 L-3

L-4 20"x20" SA

68"x42" SA

RRRR

PPPP

NNNN

MMMM

LLLL

JJJJ

5.2 4.5 3.9

204-ACCU-1

24"x24" RA

20"x20" SA

24"x24" RA (DN)

22"x22" SA (DN)

24"x24" RA

204-AHU-D 204-AHU-E

UUUU

TTTT

SSSS

RRRR

PPPP

NNNN

MMMM

9.7 9.2 8.5 7.7 7.2 6.3

RR-2

204-AHU-1

BLDG 204 CHILLER

13.10

(E) 204-AHU-CATH 13.14

13.10

13.31

13.32

RRRR

PPPP

NNNN

MMMM

LLLL

JJJJ

5.2 4.5 3.9

204-AHU 2

204-ACCU-113.15

4" CHR

4" CHS

204-AHU-D 204-AHU-E

3/4" MPR

3/4" MPS

1 1/2" MPR DN

2" MPS DN

204-SUH-1

1 1/4" MPR

1 1/2" MPS

3/4" MPR

3/4" MPS

1 1/2" MPS 1 1/4" MPR

3" CHS

3" CHR 2 1/2" CHS

2 1/2" CHR

4" CHR

4" CHS

3/4" MPS

3/4" MPR

1 1/4" MPS

1" MPR

1 1/2" MPR

2" MPS

13.33

4" CHR

4" CHS13.34

13.35

AHU CONTROL

PANEL 13.36

KEY PLAN ENTIRE FLOOR

EXISTING BELOW

PHASE ON SHEET SHOWN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

F

Au to de sk

D oc s:

//M t H om e

VA

C at h

La b/

FF

E_

R en ov at e C at h

La b

II_

B2

_M

EP

(2

4)

.rv t

7/

/2

:2 9:

A

M

MH103

MECHANICAL ROOF HVAC PLAN

06/12/2026 KF JV

RENOVATE BLDG 204 CATH LAB II 621-22-121

MT HOME, TENNESSEE

100% BID DOCUMENTS

MT HOME, VA

MEDICAL

CENTER Approved: Owner

D R A W I N G N O T E S :

13.10 PROVIDE A METAL CAP ON TOP OF ROOF CURB TO SEAL THE PENETRATION.

13.14 EXISTING RTU TO SERVE NEW PREP AND RECOVERY AREA.

13.15 NEW ROOF TOP AIR COOLED CONDENSING UNIT TO SERVE 204-AHU-D AND 204-AHU-E.

13.31 REBALANCE THE EXISTING AHU TO THE NEW DESIGN CONDITIONS FOUND ON SHEET M602

13.32 CONNECT NEW EXHAUST DUCTWORK TO EXISTING ROOF VENTILATOR.

13.33 INSTALL STEAM UNIT HEATER TO HEAT PENTHOUSE.

13.34 CONNECT CHILLED WATER PIPING FROM NEW CHILLER TO THE HOUSE CHILLED WATER. CONNECT WITH THREE WAY

VALVE.

13.35 NEW THERMOSTAT TO SERVE STEAM UNIT HEATER AND EXHAUST FAN IN MECHANICAL PENTHOUSE.

13.36 NEW AHU CONTROL PANEL. COORDINATE WITH OTHER DISCIPLINES TO PROVIDE POWER AND DATA.

1/8" = 1'-0"1 ROOF HVAC PLAN - PHASE 1

1/8" = 1'-0"4 ROOF HVAC PLAN - PHASE 4

1/8" = 1'-0"3 ROOF HVAC PLAN - PHASE 5

1/8" = 1'-0"2 ROOF PIPING PLAN - PHASE 1

0 100% BID DOCUMENTS 06/12/2026

1 ADDENDUM 01 06/29/2026

2 ADDENDUM 02 07/24/2026

07/24/2026

File details come from the government source that posted it. Updated .