This document is an Addendum 02 Summary that details updated drawings, specifications, and revisions for the "Renovate Bldg. 204 Cath Lab II" project at the James H. Quillen Veterans Affairs Medical Center in Mount Home, Tennessee (Project Number: 621-22-121). The addendum, dated 07-24-2026, incorporates responses to Request for Information (RFI) submissions and provides comprehensive modifications across multiple drawing sheets and specification sections. Key drawing modifications include the addition of water mist fire extinguisher legends and access panels for booms, clarification of steel member labeling, removal of frosted glass from scope, updates to phasing notes and door manufacturer information, amendments to epoxy floor details, and replacement of Uline shelves with contractor-provided M2080B wire shelves. Equipment modifications include the addition of two 10-lb bracket-mounted water mist fire extinguishers marked as contractor-provided, clarification that ceiling booms are Skytron brand, updates to equipment matrix descriptions, and marking of specific equipment as vendor-furnished or contractor-provided.
Specification modifications include the addition of three new specifications (07 41 13 - Insulated Metal Roof Panels, 10 51 26 - Plastic Lockers and Bench, 23 82 00 - Convection Heating and Cooling Units, and 28 23 00 - Video Surveillance), removal of commissioning-related specifications, formatting corrections to the operating room modular diffuser system specification, and updates to special inspection schedules and training requirements. Plumbing, mechanical, and electrical system modifications are also documented, including additions of medical gas system removals, lead-lined low air return ductwork, Avigilon camera systems across multiple phases with corresponding card readers and data drops, and associated mounting details and scheduling information. The addendum extends proposal response dates to 08-10-2026.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“RENOVATE BLDG 204 CATH LAB II” PROJECT FOR THE
JAMES H. QUILLEN VETERANS AFFAIRS MEDICAL CENTER (VAMC)
MT. HOME, TENNESSEE
PROJECT NUMBER: 621-22-121
UPDATED DRAWINGS, SPECIFICATIONS AND EXPLANATION OF REVISIONS
ADDENDUM NUMBER 02
07-24-2026
SUMMARY OF UPDATES
BID RFI RESPONSES UNDER SEPARATE COVER.
DRAWING MODIFICATIONS, BY SHEET
GI101
1. Added to legend water mist fire extinguisher.
GI110
1. General notes, drawing notes and infection and dust control notes updated to reflect RFI responses.
2. Note added to the General Notes: 3-week turnover before each phase
SE102.4
1. Labeled steel member just northwest of grid JJ-5.2 (HSS20x8x3/8).
SE103.1
1. Corrected section referenced in keynote 05.13 (should have said 20/S501).
AE112.4
1. Eight (8) access panels added for booms.
AE301
1. Added more information about penthouse roof BOD.
2. Adjusted details to more accurately reflect BOD condition.
AE502
1. Removed frosted glass from scope.
AE504
1. Added phasing note to general notes to reflect RFI responses.
AE601
1. Door general notes updated to reflect manufacturer.
AF702.1 - AE702.4
1. Marked DF-2 as not used.
2. Amended details of Epoxy floor.
AF702.5
1. Marked DF-2 as not used.
2. Amended details of Epoxy floor.
3. Six (6) signs clarified to be the IN-04.02 sign type.
4. Replaced Uline shelves with M2080B
AQ732
1. Two (2) total 10-lb bracket-mounted water mist fire extinguishers have been added across both Cath labs as Contractor-provided on the Equipment Schedule and Equipment Plan.
2. Equipment Matrix changes
a. Description of fire extinguisher changed to clarify VA is responsible for extinguisher itself.
b. A1000A Water Mist Fire Extinguisher added.
c. A1067 Mirror description updated to include size.
d. All Ceiling Booms M7801A-D marked as VC.
e. M7650 Defibrator marked as VV.
f. M0750 Flowmeter marked as VV.
g. Removed uline equipment and changed to contractor provided wire shelves.
AQ732.4
1. Two (2) 10-lb bracket-mounted water mist fire extinguishers have been added as Contractor-provided on the Equipment Schedule and Equipment Plan.
2. Language of booms clarified to be Skytron.
3. Replaced Uline shelves with M2080B
PD102.5
1. Added note to remove medical gas alarm panel, pressure switches, and wiring.
PL601
1. Added P-502 to Plumbing Fixture Schedule.
MH102.4
1. Keynote added to provide low air return ductwork in L222 EP Cath Lab and L220 Cath Lab with lead lining from the floor to seven feet above the floor.
MH103
1. Keynote was updated to reflect the correct units being supplied by the new chiller.
E001
1. Added Avigilon camera symbols to the symbol legend.
E102
1. Added note in room L252 about routing coax to this location.
ED102.1.2
1. Added note that each demo WAO drop has (3) cables.
ED102.2.2
1. Added note that each demo WAO drop has (3) cables.
ED102.3.2
1. Added note that each demo WAO drop has (3) cables.
ED102.4.2
1. Added note that each demo WAO drop has (3) cables.
ED102.5.2
1. Added note that each demo WAO drop has (3) cables.
EE102.1.2
1. Two(2) Dual-head Avigilon dome cameras are added.
2. Phase 1 camera schedule is added.
3. One(1) Card Readers are added.
EE102.2.2
1. Two(2) Dual-head Avigilon Dome cameras and One(1) Triple-head Avigilon Dome camera added to corridors.
2. One(1) Dual-head Avigilon Dome camera and one(1) Triple-head Avigilon Dome camera added to Waiting L202.
3. Phase 2 Camera schedule is added.
4. Three(3) Card Readers added to plan.
EE102.3.2
1. One(1) Triple-head Avigilon Dome camera is added.
2. Added Phase 3 camera schedule.
EE102.4.2
1. Two (2) Dual-head Avigilon Dome cameras are added.
2. Phase 4 camera schedule is added.
3. Added four(4) Card Readers.
4. Added two(2) Data Drops.
5. Removed antenna from door hardware schedule.
EE102.5.2
1. One(1) Card reader is added.
2. One(1) Triple-head Avigilon camera is added.
3. Phase 5 camera schedule is added.
EE102.5.3
1. One(1) dual-head camera added.
2. Added two(2) Card Readers.
3. Added phase 5.1 camera schedule.
E501
1. Wall-mounted camera detail notes, Ceiling-mounted camera detail notes, and general camera mounting detail notes added.
E600
1. Provided note related to providing ATS labeling.
SPECIFICATION MODIFICATIONS
00 01 10 – Table of Contents
1. Removed Commissioning-related specifications.
2. Added 07 41 13.
3. Added 10 51 26.
4. Added 23 82 00.
01 45 35 – Special Inspections
1. Added Schedule of Special Inspections and Statement of Special Inspections. These two files are now attached to the Specifications.
07 41 13 – Insulated Metal Roof Panels
1. Added entire specification.
09 54 00 – Operating Room Modular Diffuser System
1. Formatted to have the correct number specification number.
10 51 26 – Plastic Lockers and Bench
1. Added entire specification.
23 82 00 – Convection Heating and Cooling Units
1. Added entire specification.
28 05 00 – Common Work Results for Electronic Safety and Security
1. Training requirements modified in section 3.4.D. to show 8 hours.
28 23 00 – Video Surveillance
1. Added entire specification.