This document is an architectural floor plan for the second floor of a medical facility renovation project. The plan depicts a phased construction approach across five phases, with Phase 1, Phase 2, Phase 3, Phase 4, and Phase 5 clearly demarcated on the layout. The facility is identified as MT Home, VA Medical Center, located in Mt. Home, Tennessee, and is designated as a "100% BID DOCUMENTS" submission for the Corporate Bldg 204 Cath Lab II project (Drawing E102).

The plan includes electrical and HVAC systems schematics on the upper portion, detailing equipment such as AHU (Air Handling Units) 3 and 5, transformers, and electrical panels with specific component designations. The main floor layout shows room configurations, corridors, and mechanical spaces typical of a medical center environment. The document is marked as "Fully Sprinklered," indicating fire suppression system installation throughout. This appears to be a design document prepared by FFE Engineering & Architecture as the Architect/Engineer of Record, with review and approval stamps from the U.S. Department of Veterans Affairs, suggesting this is a federal construction project under VA oversight.

View the file

Other files

File Type Posted
00 01 10 - Table Of Contents 29072026.pdf PDF
07 42 13 - Insulated Metal Wall Panels.pdf PDF
07.314_AE301 - PENTHOUSE CONSTRUCTION.pdf PDF
09 54 00 - Operating Room Modular Diffuser System.pdf PDF
23 82 00 - Convection Heating and Cooling Units.pdf PDF
14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf PDF
14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf PDF
13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf PDF
S-102824-291.pdf PDF
01 45 35a - Schedule of SI.pdf PDF
28 05 00 - Common Work Results for Electronic Safety and Security.pdf PDF
07 41 13 - Insulated Metal Roof Panels.pdf PDF
14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf PDF
07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf PDF
FINAL COORDINATION STUDY -- 12-17-19.pdf PDF
10 51 26 - Plastic Lockers and Bench.pdf PDF
09 05 16 - Subsurface Preparation For Floor Finishes.pdf PDF
01 45 35b - Statement of SI.pdf PDF
14.29_E501 - TECHNOLOGY DETAILS.pdf PDF
14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.pdf PDF
07.705_AF702.5 - PHASE FIVE FINISH PLANS.pdf PDF
07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.pdf PDF
11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.pdf PDF
Revised Cath Shielding 2024.pdf PDF
Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.xlsx XLSX spreadsheet
36C24926R0057 0003.pdf PDF
28 23 00 - Video Surveillance.pdf PDF
01 45 35 - Special Inspections.pdf PDF
00 01 10 - Table Of Contents.pdf PDF
36C24926R0057 0002.pdf PDF
621-22-121 Site Visit Sign in sheet.pdf PDF
2026-0629 Cath Lab II - BID specs - Add 01.pdf PDF
36C24926R0057 0001.pdf PDF
2026-0629 Cath Lab II - BID Dwgs - Add 01.pdf PDF
621-22-121 Renovate B204 for Cath Lab II - Bid Specifications.pdf PDF
36C24926R0057_1.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
Price Breakout Schedule.xlsx XLSX spreadsheet
Contractor EMR Certification Form.docx DOCX document
621-22-121 Renovate B204 for Cath Lab II - Bid Drawings.pdf PDF
Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
WD TN20260191 2 Jan 2026.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E102

E102

E102

E102

E102

AHU-3

AHU-5

2AEQH1-1

2AC2-1

2AC2-2

L222A

L231

(E) 2ANH2

(E) XFMR 2AN1

(E) 2AC1

(E) 2ACH1

(E) 2ALSH1

(E) 2ANH1

(E) 2AN1-2(E) 2AN1-1

L252

(E) XFMR 2AC1

(E) 2BEQH1 (E) 2BEQ1

(E) 2BCH1

(E) 2BC1

(E) 2BN1-2

(E) 2BNH1

XFMR 2BN1

XFMR-2BEQ1

XFMR 2BC1

ELECTRICAL

L226

(E) 2BN1-1

(E) 2ANH3

(E) XFMR 2AN3

(E) 2AN3-2

(E) 2AN3-1

(E) 2AEQH1-2

(E) 2AC2

(E) XFMR 2AC2

(E) 2ACH2

ELECTRIC

L207A

DATA RACK

(E) 2AC3

(E) HIRSCH

CONTROLLER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

F

Au to de sk

D oc s:

//M t H om e

VA

C at h

La b/

FF

E_

R en ov at e C at h

La b

II_

B2

_M

EP

(2

4)

.rv t

7/

/2

2:

:0

PM

E102

SECOND FLOOR OVERALL PLAN

06/12/2026 JB ASB

RENOVATE BLDG 204 CATH LAB II 621-22-121

MT HOME, TENNESSEE

100% BID DOCUMENTS

MT HOME, VA

MEDICAL

CENTER Approved: Owner

1/8" = 1'-0" D-02-SECOND FLOOR - Existing Panels

1/4" = 1'-0"3 L222A, L231

1/4" = 1'-0"4 L252

1/4" = 1'-0"1 L226

1/4" = 1'-0"2 L207A

1/4" = 1'-0"5 L290A

PHASE 1

PHASE 2

PHASE 3

PHASE 4

PHASE 5

PH

AS

E

0 100% BID DOCUMENTS 06/12/2026

1 ADDENDUM 01 06/29/2026

2 ADDENDUM 02 07/24/2026

06/12/2026

ROUTE AND TIE-IN

COAX CABLES TO

MAIN IN THIS ROOM.