07.112_AE112.2 - PHASE TWO ENLARGED PLAN.pdf

PDF 907 KB Posted

Attached to
Z2DA--621-22-121 Renovate Bldg. 204 for Cath Lab II - Engineering
Solicitation number
36C24926R0057
Issued by

About this file

This document is an architectural drawing set for Phase Two of a medical center renovation project, specifically detailing enlarged floor plan and reflected ceiling plan (RCP) views for a facility located in Mt. Home, Tennessee operated by the U.S. Department of Veterans Affairs.

The scope of work includes construction of multiple examination rooms (Exam Four through Exam Eight, designated L204D through L204H) with standardized 9-foot ceiling heights, partition installation with fire-rating requirements (1-hour and 2-hour fire barriers), and coordination of structural, mechanical, electrical, and plumbing systems. Key construction requirements include installation of Type F1 column furring, fire-treated plywood blocking (3/4-inch minimum) for all wall-mounted items such as casework, equipment, fixtures, and handrails, with blocking extending 12 inches beyond each mounting point and additional steel reinforcement for items exceeding 250 pounds of force. The ceiling design specifies 2-foot-by-2-foot acoustical tile with integrated LED light fixtures, sprinkler head coordination, and scribing for tight fit. General requirements address demolition damage repair, door opening clearances of 4 inches from partition faces, alignment with existing construction, and fully recessed fire extinguisher cabinets with fire-resistant blocking. All work must conform to referenced general notes on sheet GI000, seismic restraint requirements on AE501, and overall ceiling plan coordination on AE112, with the fully sprinklered facility requiring 100-percent bid documentation.

View the file

Other files

File Type Posted
07.314_AE301 - PENTHOUSE CONSTRUCTION.pdf PDF
00 01 10 - Table Of Contents 29072026.pdf PDF
07 42 13 - Insulated Metal Wall Panels.pdf PDF
09 54 00 - Operating Room Modular Diffuser System.pdf PDF
23 82 00 - Convection Heating and Cooling Units.pdf PDF
14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf PDF
14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf PDF
13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf PDF
S-102824-291.pdf PDF
10 51 26 - Plastic Lockers and Bench.pdf PDF
09 05 16 - Subsurface Preparation For Floor Finishes.pdf PDF
01 45 35b - Statement of SI.pdf PDF
14.29_E501 - TECHNOLOGY DETAILS.pdf PDF
14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.02_E102 - SECOND FLOOR OVERALL PLAN.pdf PDF
14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.pdf PDF
07.705_AF702.5 - PHASE FIVE FINISH PLANS.pdf PDF
07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.pdf PDF
11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.pdf PDF
Revised Cath Shielding 2024.pdf PDF
Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.xlsx XLSX spreadsheet
36C24926R0057 0003.pdf PDF
01 45 35a - Schedule of SI.pdf PDF
28 05 00 - Common Work Results for Electronic Safety and Security.pdf PDF
07 41 13 - Insulated Metal Roof Panels.pdf PDF
14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf PDF
07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf PDF
FINAL COORDINATION STUDY -- 12-17-19.pdf PDF
28 23 00 - Video Surveillance.pdf PDF
01 45 35 - Special Inspections.pdf PDF
36C24926R0057 0002.pdf PDF
621-22-121 Site Visit Sign in sheet.pdf PDF
2026-0629 Cath Lab II - BID specs - Add 01.pdf PDF
36C24926R0057 0001.pdf PDF
2026-0629 Cath Lab II - BID Dwgs - Add 01.pdf PDF
621-22-121 Renovate B204 for Cath Lab II - Bid Specifications.pdf PDF
36C24926R0057_1.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
621-22-121 Renovate B204 for Cath Lab II - Bid Drawings.pdf PDF
Price Breakout Schedule.xlsx XLSX spreadsheet
Contractor EMR Certification Form.docx DOCX document
Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
WD TN20260191 2 Jan 2026.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

AP

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

N N

AN

S

S

AP

AN

S

F

S

AP

AN

S

GENERAL FLOOR PLAN NOTES

A.

B.

C.

D.

E.

F.

G.

H.

REFER TO GI000 FOR GENERAL NOTES.

COLUMN FURRING ARE TYPE F1, UNLESS OTHERWISE NOTED.

PATCH AND REPAIR DAMAGES FROM DEMOLITION IN ALL AFFECTED AREAS.

CONSTRUCT ALL DOOR OPENINGS 4 ” CLEAR FROM A PERPENDICULAR PARTITION OUTSIDE FACE OF FRAME, UNLESS NOTED

OTHERWISE.

PARTITION TYPES INDICATED ARE CONTINUOUS TO A CORNER OR AN INTERSECTING PARTITION, UNLESS INDICATED OTHERWISE. WHERE PARTITIONS OF DIFFERENT THICKNESSES MEET, CONFIRM ALIGNMENT WITH PLANS.

ANCHOR WALL HUNG CASEWORK, GRAB BARS AND EQUIPMENT ATTACHED TO WALLS TO BLOCKING BETWEEN STUDS.

PROVIDE CONTINUOUS BLOCKING AT TOP AND BOTTOM OF EQUIPMENT.

ALIGN NEW CONSTRUCTION WITH EXISTING ADJACENT CONSTRUCTION WHERE APPLICABLE. PREPARE ALIGNED SURFACES TO

RECEIVE NEW FINISHES.

STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING (SME& P) SYMBOLS ARE SHOWN FOR COORDINATION PURPOSES

ONLY - REFER TO RESPECTIVE DISCIPLINE.

NEW WORK LEGEND

EXISTING CONSTRUCTION

EXISTING SMOKE ZONE BARRIER

EXISTING 2-HOUR FIRE BARRIER

EXISTING 1-HOUR FIRE BARRIER

PROPOSED PARTITION

PROPOSED SMOKE ZONE BARRIER

PROPOSED 1-HOUR FIRE BARRIER

PROPOSED 2-HOUR FIRE BARRIER

PROPOSED DOOR AND FRAME

NOT PART OF CURRENT

PHASE

NO ARCHITECTURAL SCOPE

ON THIS SHEET

FOR ALL WALL-MOUNTED ITEMS, INCLUDING BUT NOT LIMITED TO CASEWORK, EQUIPMENT, FIXTURES, HANDRAILS, ETC., PROVIDE CONTINUOUS 3/4" FIRE-TREATED PLYWOOD BETWEEN STUDS AND SECURED TO STUD WALL STRUCTURE. ALL BLOCKING TO EXTEND 12" MINIMUM IN ALL DIRECTIONS BEYOND EACH MOUNTING POINT. CONTRACTOR TO REVIEW ALL DRAWINGS AND SPECIFICATIONS TO DETERMINE THE LOCATIONS OF ALL SPECIFIC MOUNTING LOCATIONS. FOR ALL ITEMS THAT EXCEED 250 LBS. OF FORCE AT ANY POINT IN ANY

DIRECTION, PROVIDE ADDITIONAL STEEL AT ALL BLOCKING LOCATIONS.

1.31.7

2.3

RR

PP

NN

MM

LL

JJ

CC

DD

EE

FF

GG

HH

2.62.73.9

129 SF

EKG ONE

L203A

125 SF

EKG TWO

L203B

128 SF

EXAM TWO

L204B

126 SF

EXAM ONE

L204A

565 SF

WAITING

L202

168 SF

EXAM THREE

L204C

EXAM SEVEN

L204G

EXAM EIGHT

L204H

565 SF

CORRIDOR

C2-3

110 SF

VITALS

C2-3A

CORRIDOR

C2-1

ELEVATOR

S-18

ELEVATOR

S-17

MECH

'-4

'-4

'-4

'-1 3/

4"

'-1 1 3

/8"

10'-5 3/4" +/-

9"

F1

B1

A1

A1

A1

A1

A1

A1

A1

A1

A1

6'-1 3/8" 13'-7 7/8"

A1

A1

'-8

A2

'-2

6'-9" 6'-0 1/8" 6'-0 1/8" 6'-0 1/8"

A2

B1

B1

B1

A1

11.01

09.01

09.01

L202B

L2

C

L2

A L2

B

L2

C L2

D

L2

E L2

F

L2

A L2

B

132 SF

EXAM FOUR

L204D

139 SF

EXAM FIVE

L204E

150 SF

EXAM SIX

L204F

565 SF

CORRIDOR

C2-3

EXAM SEVEN

L204G

EXAM EIGHT

L204H

CORRIDOR

C2-1

MECH

MECH

STAFF TOILET

L219

STAFF TOILET

L217

MECH

PATIENT TOILET

L205

F1F1

F1

F1

F1

AE411

2 SIM

AE411

2 SIM

AE411

2 SIM

AE411

2 SIM

AE411

2 SIM

AE411

2 SIM

AE502

AE411

AE411

3 SIM

A1

146 SF

RECEPTION

L202A

20 1/2"

20 1/2"

20 1/2"

6'- 7"

1'- 0"

AE502

L2

A

09.0109.01

1'- 1"

R2 3

1.31.7

2.3

RR

PP

NN

MM

LL

JJ

CC

DD

EE

FF

GG

HH

2.62.73.9

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

8' - 8"

7' - 0"

EKG ONE

L203A

WAITING

L202

ELEVATOR

S-18

ELEVATOR

S-17

CORRIDOR

C2-1

MECH

EKG TWO

L203B EXAM TWO

L204B

EXAM ONE

L204A

EXAM THREE

L204C

EXAM FOUR

L204D

EXAM FIVE

L204E

EXAM SIX

L204F

EXAM SEVEN

L204G

EXAM EIGHT

L204H

CORRIDOR

C2-3

VITALS

C2-3A

ELEVATOR

S-18

ELEVATOR

S-17

MECH

STAFF TOILET

L219

STAFF TOILET

L217

MECH

PATIENT TOILET

L205

8' - 8" 8' - 8"

AE502

8' - 8"

RECEPTION

L202A

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

REFER TO GI000 FOR GENERAL NOTES.

REFER TO CEILING PLAN AND FINISH LEGEND FOR CEILING FINISH INFORMATION.

REFER TO LEGEND ON GI001 FOR ADDITIONAL CEILING SYMBOLS.

REFER TO AE112 OVERALL CEILING PLAN FOR COMPLETE CEILING SCOPE.

REFER TO AE501 FOR SEISMIC RESTRAINT FOR ACT REQUIREMENTS.

PROVIDE COLD-FORMED STEEL FRAMED BULKHEADS WITH GYPSUM BOARD SHEATHING AT CEILING HEIGHT TRANSITIONS.

PAINT AS SPECIFIED IN ROOM FINISH SCHEDULE.

REFER TO MECHANICAL DRAWINGS FOR QUANTITY AND TYPE OF DIFFUSERS, RETURN AIR GRILLES, AND EXHAUST GRILLES.

SCRIBE CEILING MATERIALS CAREFULLY FOR A TIGHT FIT.

REFER TO ELECTRICAL DRAWINGS FOR QUANTITY AND TYPES OF LIGHTS, SPEAKERS, DETECTORS, POWER OUTLETS, ETC.

SCRIBE CEILING MATERIALS CAREFULLY FOR A TIGHT FIT.

ALL LAY-IN CEILING GRID SHALL BE EQUAL FROM OPPOSING EDGES OF ROOM UNLESS OTHERWISE NOTED. AVOID CUT SIZES

SMALLER THAN 3"

CENTER SPRINKLER HEADS WITHIN CEILING TILES. COORDINATE WITH OTHER CEILING MOUNTED ACCESSORIES.

CEILING HEIGHT IS 9'-0" UNLESS NOTED OTHERWISE.

GENERAL RCP NOTES

CEILING LEGEND

2'-0" x 2'-0" ACOUSTICAL TILE CEILING

GYPSUM BOARD CEILING

2'-0" x 2'-0" SUPPLY AIR DIFFUSER

1'-0" x 1'-0" RETURN AIR GRILLE

6" CAN LIGHT

OCCUPANCY SENSOR

2'-0" x 2'-0" LED LIGHT FIXTURE

OS

EXIT SIGN

REFER TO GI001

FOR ADDITIONAL SYMBOLS

DEMOLISH 2'-0" x 2'-0" ACOUSTICAL

CEILING TILE IN FUTURE PHASE G PROVIDE GASKETED GRID ON

SPECIFIED CEILING

DRAWING NOTES

09.01 FEATHER IN NEW GYPSUM WALL BOARD TO EXISTING, ALIGN SURFACES.

11.01 FULLY RECESSED FIRE EXTINGUISHER. PROVIDE FIRE RESISTANT BLOCKING AND ADDITIONAL FRAMING AS REQUIRED FOR

INSTALLATION. REFER TO FIRE EXTINGUISHER CABINET DETAIL ON SHEET AE112.1.

KEY PLAN

ENTIRE FLOOR

AREA SHOWN ON SHEET

NORTH EXISTING BELOW

CEILING ONLY RELATED WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

F

Au to de sk

D oc s:

//M t H om e

VA

C at h

La b/

FF

E_

R en ov at e C at h

La b

II_

B2

(2

4)

.rv t

7/

/2

1:

:4

PM

AE112.2

PHASE TWO ENLARGED PLAN

06/12/2026 MP NM

RENOVATE BLDG 204 CATH LAB II 621-22-121

MT. HOME, TENNESSEE

100% BID DOCUMENTS

MT HOME, VA

MEDICAL

CENTER Approved: MT HOME, VA MEDICAL CENTER

3/16" = 1'-0"1 ENLARGED PLAN - PHASE TWO

3/16" = 1'-0"2 ENLARGED REFLECTED CEILING PLAN - PHASE TWO

0 100% BID DOCUMENTS 06/12/2026

1 ADDENDUM 01 06/29/2026

3 ADDENDUM 03 07/29/2026

File details come from the government source that posted it. Updated .