07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.pdf

PDF 4 MB Posted

Attached to
Z2DA--621-22-121 Renovate Bldg. 204 for Cath Lab II - Engineering
Solicitation number
36C24926R0057
Issued by

About this file

This document is an equipment plan for Phase Four of a VA Medical Center construction project, specifically showing the total equipment requirements and general installation notes.

The equipment list identifies 58 distinct equipment types with a total of 216 units to be procured and installed across the facility. Key medical equipment includes radiographic/fluoroscopic angio units (monoplane, digital), defibrillator-monitor-recorders, anesthesia booms with lead shield, physiological monitors, infusion pumps, hemoglobin and coagulation analyzers, and ultrasonic treatment units. Additional equipment encompasses furniture (task chairs, benches, lockers), IT infrastructure (computers with dual monitors), storage systems (shelving, catheter cabinets, linen hampers), and facility items (fire extinguishers, soap/sanitizer dispensers, waste disposal carts). Responsibility for furnishing and installation is distributed among four categories: VA furnish/VA install (VV), VA furnish/contractor install (VC), contractor furnish/VA install (CV), and contractor furnish/contractor install (CC). The document specifies that blocking must be provided for wall and ceiling-mounted equipment, with coordination required between the contractor and VA designer. All equipment tag marks correspond to JSN (Job Sequence Numbers), with variations identified by an 'A' suffix and unique equipment types beginning with 'U'. The contractor is required to confirm manufacturer specifications for height, weight, mounting, and clearance requirements, notifying the owner and architect of any conflicts prior to installation. The modular ceiling system is specified as a sole-source AJ CARES Modular Diffuser System requiring coordination with the Contracting Officer's Representative (COR).

View the file

Other files

File Type Posted
07 42 13 - Insulated Metal Wall Panels.pdf PDF
00 01 10 - Table Of Contents 29072026.pdf PDF
Appendix B - HVAC CUTSHEETS.pdf PDF
07.112_AE112.2 - PHASE TWO ENLARGED PLAN.pdf PDF
36C24926R0057 0004.pdf PDF
07.314_AE301 - PENTHOUSE CONSTRUCTION.pdf PDF
14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.24_EE102.4.2 - PHASE 4 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.22_EE102.3.2 - PHASE 3 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
00 00 00 - Specification Cover.pdf PDF
14.27_EE102.5.3 - PHASE 5 ENLARGED LIGHTING TECH PLAN.pdf PDF
07 41 13 - Insulated Metal Roof Panels.pdf PDF
13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf PDF
07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf PDF
14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
23 82 00 - Convection Heating and Cooling Units.pdf PDF
28 23 00 - Video Surveillance.pdf PDF
01 45 35 - Special Inspections.pdf PDF
14.16_EE102.1.2 - PHASE 1 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
00 01 10 - Table Of Contents.pdf PDF
2026-0724 Addendum 02 Summary.docx DOCX document
14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf PDF
07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf PDF
FINAL COORDINATION STUDY -- 12-17-19.pdf PDF
01 45 35a - Schedule of SI.pdf PDF
28 05 00 - Common Work Results for Electronic Safety and Security.pdf PDF
11.10_PD102.5 - PLUMBING SECOND FLOOR DEMOLITION PLAN PHASE 5.pdf PDF
S-102824-291.pdf PDF
09 54 00 - Operating Room Modular Diffuser System.pdf PDF
13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf PDF
36C24926R0057 0003.pdf PDF
14.02_E102 - SECOND FLOOR OVERALL PLAN.pdf PDF
14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.pdf PDF
11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.pdf PDF
09 05 16 - Subsurface Preparation For Floor Finishes.pdf PDF
14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
Revised Cath Shielding 2024.pdf PDF
Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.xlsx XLSX spreadsheet
10 51 26 - Plastic Lockers and Bench.pdf PDF
01 45 35b - Statement of SI.pdf PDF
07.705_AF702.5 - PHASE FIVE FINISH PLANS.pdf PDF
14.29_E501 - TECHNOLOGY DETAILS.pdf PDF
621-22-121 Site Visit Sign in sheet.pdf PDF
36C24926R0057 0002.pdf PDF
2026-0629 Cath Lab II - BID specs - Add 01.pdf PDF
36C24926R0057 0001.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

S

N N

OS OS

F F

SS

F

F

S

S

S S SS

S S

AP

S

F

S

A.

B.

C.

D.

E.

F.

REFER TO GI000 FOR GENERAL NOTES.

REFER TO ACCESSIBILITY DETAILS ON SHEETS GI003 & GI004.

PROVIDE BLOCKING AS REQUIRED FOR WALL AND CEILING MOUNTED EQUIPMENT INCLUDING ITEMS PROVIDED OR INSTALLED

BY THE VA - COORDINATE WITH VA DESIGNER.

EQUIPMENT COUNTS SHOWN ON INDIVIDUAL SCHEDULES REPRESENT THE AMOUNT OF EQUIPMENT PER ROOM TYPE. REFER

TO TOTAL EQUIPMENT LIST ON SHEET AQ732 FOR ABSOLUTE TOTALS.

EQUIPMENT TAG MARK SHOWN IS THE JSN NUMBER. NUMBERS ENDING IN 'A' ARE A VARIATION OF THE ORIGINAL JSN. JSN

STARTING WITH 'U' ARE UNIQUE TYPES OF EQUIPMENT.

RESPONSIBILITY DEFINITIONS:

CV = CONTRACTOR FURNISH VA INSTALL

CC = CONTRACTOR FURNISH CONTRACTOR INSTALL

VV = VA FURNISH VA INSTALL

VC = VA FURNISH CONTRACTOR INSTALL

G. CONFIRM REQUIREMENTS FOR HEIGHT, WEIGHT, MOUNTING, AND REQUIRED CLEARANCES WITH EQUIPMENT MANUFACTURER.

NOTIFY THE OWNER AND ARCHITECT OF ANY CONFLICTS PRIOR TO INSTALLATION.

GENERAL EQUIPMENT NOTES

NOT PART OF ARCHITECTURE

SCOPE

NOT PART OF SCOPE FOR

CURRENT PHASE

X#### EQUIPMENT TAG

LEGEND

SCRUB

L222B

STERILE STORAGE

L224

CONTROL ROOM

L222C

CONTROL ROOM

L220A

CATH LAB

L222

EQUIPMENT

L228

EP CATH LAB

L220

STERILE STORAGE

L212

SCRUB

L220B

ELECTRICAL

L226

HAC

L215

EQUIPMENT

L216

ELECTRICAL

L252

MECH

STAFF TOILET

L217

STAFF TOILET

L219

AMM

L284

PATIENT TOILET

L283

SOILED

L282

CLEAN

L281

PATIENT TOILET

L205

ULTRASOUND

L285

E0954

F3050

M3090 M3072

M7650

M7818

M3150

M1800A F0300

M4255

L0220 L1085

M3165

F0535

M7802

A5025

A5150

A5075

F3200

A5104

M4250

M4255

M4812

M7845

M8800

M8810

M8825

M4255

M8200

A5104

M1801 M1801 M1800A

F0300

F3200

U0009

U0001 U0001

R6900

E0954

F3050

M7650

M3150

L0220

L1085

F3200

M4812

U0009

R6900

M3165

F3200

M3072 M3090

A5104

M4250

M4255

M7845

M8800

M8825

M4255

A5104

M8810

M4255

F0535

A5075

A5150

M7802

A1040

F2010A

A5082

M8826

F2010A A5082

M7818

A1015 A1015

F2010A

F2010A

A5150

GOWNING

L213

A5077A1000AA1000A

M2080B

M2080B M2080B

M2080B

MECH

STAFF TOILET

L217

STAFF TOILET

L219

AMM

L284

PATIENT TOILET

L283

SOILED

L282

CLEAN

L281

PATIENT TOILET

L205

ULTRASOUND

L285

STERILE STORAGE

L224

SCRUB

L222B

ELECTRICAL

L252

EQUIPMENT

L228

CONTROL ROOM

L222C

CONTROL ROOM

L220A

STERILE STORAGE

L212

SCRUB

L220B

EQUIPMENT

L216

M7801B M7801D

M7801C

M7801B

M7801A

M7801C

3' - 3" 9' - 9"5'-6

5'

- 6

3'

- 3

9'

- 9

" 5' - 6"

5' - 6"

12.03

12.033' - 4"

HAC

L215

GOWNING

L213

PROVIDE STRUCTURAL FRAMING - REFER TO

STRUCTURAL DRAWINGS

VA FURNISHED CEILING MOUNTED BOOMS. SOLE

SOURCE IS SKYTRON. COORDINATE INSTALLATION

WITH COR AND MANUFACTURER

CONTRACTOR FURNISHED AND INSTALLED

MODULAR CEILING. SOLE SOURCE IS AJ CARES

MODULAR DIFFUSER SYSTEM. COORDINATE

SPECIFIC MODEL WITH COR AND MANUFACTURER

KEY PLAN

ENTIRE FLOOR

AREA SHOWN ON SHEET

NORTH EXISTING BELOW

CEILING ONLY RELATED WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

F

Au to de sk

D oc s:

//M t H om e

VA

C at h

La b/

FF

E_

R en ov at e C at h

La b

II_

B2

(2

4)

.rv t

7/

/2

3:

:5

PM

AQ732.4

EQUIPMENT PLANS - PHASE FOUR

06/12/2026 MP NM

RENOVATE BLDG 204 CATH LAB II 621-22-121

MT. HOME, TENNESSEE

100% BID DOCUMENTS

MT HOME, VA

MEDICAL

CENTER Approved: MT HOME, VA MEDICAL CENTER

3/16" = 1'-0"1 EQUIPMENT PLAN - PHASE FOUR

3/16" = 1'-0"2 EQUIPMENT REFLECTED CEILING PLAN - PHASE FOUR

TOTAL EQUIPMENT - PHASE FOUR

MARK NAME VV VC CV CC COUNT

A1000A 10LB WATER MIST FIRE EXTINGUISHER SURFACE MOUNTED WITH BRACKET AT

40" AFF.

X 2

A1015 TELEPHONE, DESK, MULTIPLE LINE X 4

A1040 LOCKER, 2 PERSON, SIDE BY SIDE, 72x15x18 X 8

A5025 BENCH, LOCKER ROOM, PORTABLE X 1

A5075 DISPENSER, SOAP, DISPOSABLE X 2

A5077 DISPENSER, HAND SANITIZER, HANDS-FREE X 1

A5082 DISPENSER, PAPER TOWEL X 2

A5104 CART, WASTE DISPOSAL, W FOOT PEDAL (B.O.D. MIDMARK) X 4

A5150 HOOK, GARMENT, TRIPLE, SURFACE MOUNTED X 7

A5210 BRACKET, TELEVISION, WALL MOUNTED, W-ADJUST ARM X 2

E0954 CART, EMERGENCY, MOBILE, 66Hx52Wx22D X 2

F0300 CHAIR, TASK, SWIVEL, WITH ARMS X 10

F0535 CART, UTILITY X 8

F2010A BASKET, WASTE PAPER, STEP-ON. (B.O.D. MIDMARK SW01) X 4

F3050 WHITEBOARD, DRY ERASE, MAGNETIC, 48IN x 36IN X 2

F3200 CLOCK, ATOMIC X 4

L0220 ANALYZER, HEMOGLOBIN, PORTABLE, HAND HELD X 2

L1085 ANALYZER, COAGULATION, AUTOMATIC X 2

M1800A COMPUTER, DUAL MONITORS X 6

M1801 COMPUTER WITH FLAT PANEL MONITOR X 4

M2080B SHELVING STORAGE, SOLID, CRS, W ADJUSTABLE SHELVES, 6FT, TO COMPLY

WITH PAR X SYSTEM.

X 4

M3072 FRAME, INFECTIOUS WASTE BAG WITH LID X 2

M3090 HAMPER, LINEN, MOBILE, WITH LID (B.O.D. MIDMARK E1020810) X 2

M3150 DISTRIBUTION SYSTEM, MEDICATION, AUTOMATIC 33"x29" X 2

M3165 CABINET, CATHETER STORAGE X 8

M3175 ELECTROSURGICAL UNIT, DUAL OUTPUT X 1

M4250 PUMP, SYRINGE, INFUSION X 2

M4255 STAND, IV, ADJUSTABLE X 14

M4266 PUMP, VOLUMETRIC, INFUSION, MULTIPLE LINE X 14

M4812 PACEMAKER, SINCE CHAMBER X 2

M7650 DEFIBRILLATOR-MONITOR-RECORDER, AUTOMATIC X 2

M7801A ANESTHESIA BOOM – REFER TO MANUFACTURES DRAWINGS X 2

M7801B LEAD SHEILD BOOM - REFER TO MANUFACTURES DRAWINGS X 2

M7801C MONITOR BOOM - REFER TO MANUFACTURES DRAWINGS X 2

M7801D LEAD SHEILD - REFER TO MANUFACTURES DRAWINGS X 2

M7802 MONITOR, HD, LCD, FP, MEDICAL X 2

M7818 MONITOR, TRANSPORT X 2

M7845 MONITOR, PHYSIOLOGICAL, BEDSIDE, 4 CHANNEL X 2

M8200 ULTRASONIC TREATMENT UNIT X 1

M8800 CART, ANESTHESIA X 2

M8810 STAND, MAYO X 2

M8825 TABLE, INSTRUMENT-DRESSING, CRS, APPROX. 36x20x34 X 2 M8826 TABLE, INSTRUMENT-DRESSING, CRS, APPROX. 60x24x34 X 1

R6900 REFRIGERATOR, BIO, UNDERCOUNTER 32" X 2

U0001 POWER, UPS AND DOCUMENTATION FOR MONOPLANE X 2

U0009 PATIENT TRANSPORT, AIR MATRESS PUMP X 2

X6175 RADIOGRAPHIC/FLUORO UNIT, ANGIO, MONOPLANE, DIGITAL X 2

3 MODULAR CEILING SCOPE OVERVIEW

DRAWING NOTES

12.03 ISO CENTER FOR MONOPLANE - REFER TO SHEET AE112.4.

0 100% BID DOCUMENTS 06/12/2026

1 ADDENDUM 01 06/29/2026

2 ADDENDUM 02 07/24/2026

2 2