07.705_AF702.5 - PHASE FIVE FINISH PLANS.pdf
PDF 5 MB Posted
- Solicitation number
- 36C24926R0057
About this file
This is a Phase Five Finish Plan document for a medical center renovation project, specifically detailing finishes and signage for the MT Home facility in Virginia and Tennessee.
The finish schedule specifies materials and colors for multiple rooms including corridors, prep/recovery areas, nurse stations, and support spaces. Floor finishes include luxury vinyl tile (LVT-1, LVT-2, LVT-3), epoxy flooring (E-1), and ceramic tile options. Wall finishes consist primarily of latex eggshell paint in oatmeal (P-1) and Sheffield gray (P-2), with select areas featuring P-6 waterbased epoxy semi-gloss paint. Base materials are vinyl wall base B-1 in Moon Rock color, while ceilings utilize acoustic ceiling tile ACT-1 or gypsum board. Additional finish specifications include bumper guards, corner guards, cabinetry systems, handrails, and wall protection systems from manufacturers such as Inpro, Armstrong, Midmark, and Stonhard. The signage schedule identifies 18 sign locations throughout Phase Five areas, with sign types IN-04.02, IN-04.01, IN-09.03, IN-01.22, and IN-01.31, to be installed in rooms including prep/recovery areas L227A through L227F, nurse station L227, office L227H, soiled room L227I, patient toilet L227G, and stress lab L230. General notes require coordination with wall protection plans, ADA-compliant floor transitions, substrate preparation, and reference to elevation details for accent walls and ceilings.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A.
B.
C.
D.
E.
F.
G.
H.
I.
REFER TO GI000 FOR GENERAL NOTES.
REFER TO SIGNAGE DETAILS ON AF702.1
PAINT WALLS P-1 AND CEILINGS P-5 UNLESS OTHERWISE NOTED. LOWER SATIN, LOWER ENAMEL IS ACCEPTABLE FOR CEILINGS.
REFER TO FINISH PLAN/RCP FOR ACCENT WALLS/CEILINGS.
PAINT DOOR FRAMES P-4, UNLESS OTHERWISE NOTED.
FINISHES INDICATED BY WALL FINISH ARROWS ARE FLOOR TO CEILING ARROW TO ARROW.
DEMOLISH EXISTING FINISHES AS REQUIRED FOR PROPOSED FINISH INSTALLATION.
* INDICATES THAT FINISH SHOWN IS AN OVERSIMPLIFICATION. REFER TO ELEVATIONS FOR ENTIRE EXTENT.
PREPARE SUBSTRATE FOR SMOOTH, CONSISTENT, ADA COMPLIANT FLOOR FINISH TRANSITIONS.
COORDINATE WALL FINISHES WITH WALL PROTECTION - REFER TO WALL PROTECTION PLAN.
GENERAL NOTES
1 / AFXXX
WALL
BASE
P-X B-X
CPT-X
TRANSITION BETWEEN FLOORING -
REFER TO NOTED DETAIL
FLOOR FINISH TAG - REFER TO FINISH
LEGEND
WALL AND BASE FINISH TAG - REFER
TO FINISH LEGEND
LEGEND
SIGN
MESSAGE SIDE(S) OF SIGN
111 SIGNAGE TAG
NOT PART OF ARCHITECTURE
SCOPE
NOT PART OF SCOPE FOR
CURRENT PHASE
128 SF
PREP/REC TWO
L227B
134 SF
PREP/REC ONE
L227A
154 SF
PREP/REC THREE
L227C 155 SF
PREP/REC FOUR
L227D
127 SF
PREP/REC FIVE
L227E
129 SF
PREP/REC SIX
L227F
44 SF
PATIENT TOILET
L227G
186 SF
OFFICE
L227H
463 SF
STRESS LAB
L230
824 SF
NURSE STATION
L227
ECHO ONE
L225A
ECHO TWO
L225B
CORRIDOR
C2-5
VFD
L222A
VFD
L231
STERILE STORAGE
L224
E-1
E-1
E-1 E-1
E-1
LVT-3
CT-1
E-1
E-1E-1
LVT-2
LVT-1
PREP/REC TWO
L227B
PREP/REC ONE
L227A
PREP/REC THREE
L227C
PREP/REC FOUR
L227D
PREP/REC FIVE
L227E
PREP/REC SIX
L227F
STRESS LAB
L230
NURSE STATION
L227
AF
2.
/3 AF702.1
AF
2.
/3 AF702.1
128 SF
PREP/REC TWO
L227B
134 SF
PREP/REC ONE
L227A
154 SF
PREP/REC THREE
L227C 155 SF
PREP/REC FOUR
L227D
127 SF
PREP/REC FIVE
L227E
129 SF
PREP/REC SIX
L227F
PATIENT TOILET
L227G
186 SF
OFFICE
L227H 463 SF
STRESS LAB
L230
824 SF
NURSE STATION
L227
ECHO ONE
L225A
ECHO TWO
L225B
CORRIDOR
C2-5
VFD
L222A
VFD
L231
STERILE STORAGE
L224
WALL
BASE
P-2 B-1
WALL
BASE
P-2 E-1
WALL
BASE
P-2 B-1
WALL
BASE
P-1 E-1
WALL
BASE
P-1 E-1
WALL
BASE
P-2 E-1
WALL
BASE
P-2 E-1
WALL
BASE
P-2 E-1
WALL
BASE
P-1 E-1
WALL
BASE
P-1 E-1
WALL
BASE
CT-2*
CT-2
WALL
BASE
P-1 E-1
WALL
BASE
P-1 E-1
WALL
BASE
P-1 E-1
W
AL
L
BA
SE
P-
E-
WALL
BASE
P-2 E-1
WALL
BASE
P-2 E-1
W
AL
L
BA
SE
P-
B-
W
AL
L
BA
SE
P-
E-
W
AL
L
BA
SE
P-
E-
W
AL
L
BA
SE
P-
E-
W
AL
L
BA
SE
P-
E-
WALL
BASE
CT-2
B-1
WALL
BASE
P-1 E-1
PREP/REC TWO
L227B
PREP/REC ONE
L227A
PREP/REC THREE
L227C
PREP/REC FOUR
L227D
PREP/REC FIVE
L227E
PREP/REC SIX
L227F
OFFICE
L227H
STRESS LAB
L230
FE-3
225A
WALLBASE P-1
B-1
227D227C
227E
227F
227B
227A
227G
227I
227H
W
AL
L
BA
SE
P-
B-
WALL
BASE
P-1 E-1
W
AL
L
BA
SE
P-
E-
W
AL
L
BA
SE
P-
E-
227J
27F2
27E1
27D127C1
27B1
27A1
KEY PLAN
ENTIRE FLOOR
AREA SHOWN ON SHEET
NORTH EXISTING BELOW
CEILING ONLY RELATED WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
F
Au to de sk
D oc s:
//M t H om e
VA
C at h
La b/
FF
E_
R en ov at e C at h
La b
II_
B2
(2
4)
.rv t
7/
/2
3:
:2
PM
AF702.5
PHASE FIVE FINISH PLANS
06/12/2026 MP NM
RENOVATE BLDG 204 CATH LAB II 621-22-121
MT. HOME, TENNESSEE
100% BID DOCUMENTS
MT HOME, VA
MEDICAL
CENTER Approved: MT HOME, VA MEDICAL CENTER
3/16" = 1'-0"1 FLOOR FINISH PLAN - PHASE FIVE
3/16" = 1'-0"2 WALL FINISH PLAN - PHASE FIVE
FINISH LEGEND
MARK DESCRIPTION BASIS OF DESIGN STYLE/ COLOR
ACT-1 ACOUSTIC CEILING TILE - TYPE 1 ARMSTRONG ARMSTRONG CALLA HIGH CAC LAY-IN 8805
B-1 VINYL WALL BASE JOHNSONITE 29 MOON ROCK, TRADITIONAL 6"
BG-1 BUMPER GUARD INPRO 700, VINYL WALL GUARD, CASTLE 0256
CG-1 CORNER GUARD INPRO 8' SAS-1828, 14 GAUGE STAINLESS STEEL
3-1/2" WING
CS-1 CABINETRY SYSTEM MIDMARK TIMBER 801
CT-1 CERAMIC TILE - TYPE 1 FLORIDA TILE SEQUENCE DRIFT, 12X24
CT-2 CERAMIC TILE - TYPE 2 FLORIDA TILE SEQUENCE VORTEX, 12X24
DF-2 NOT USED. - -
DP-1 DOOR PANEL GRAINTECH METAL DOOR CUSTOM TO MATCH WILSONART WALNUT
E-1 EPOXY FLOOR STONHARD STONBLEND GSI WITH CF7 TOPCOAT
ETR EXISTING TO REMAIN - -
EXP EXPOSED TO STRUCTURE
ABOVE
G-1 GROUT TEC 908 DOVE GRAY
HR-1 HANDRAIL INPRO 3500, STAINLESS STEEL OVAL HANDRAIL WITH
VINYL BOTTOM, CASTLE 0256
LVT-1 LUXURY VINYL TILE SHAW CONTRACT TERRAIN II 30 MIL, NEST
LVT-2 LUXURY VINYL TILE SHAW CONTRACT TERRAIN II 30 MIL, ECHO
LVT-3 LUXURY VINYL TILE SHAW CONTRACT TERRACE 2.5 MM BRUSHWOOD
P-1 PAINT - TYPE 1 PPG PAINTS LATEX EGGSHELL, OATMEAL, PPG1023-1
P-2 PAINT - TYPE 2 PPG PAINTS LATEX EGGSHELL, SHEFFIELD GRAY,
PPG1041-6
P-4 PAINT - TYPE 4 (DOOR FRAME) PPG PAINTS WATERBASED SEMI GLOSS, VA INTERIOR
DESIGNER TO DETERMINE COLOR
P-5 PAINT - TYPE 5 (CEILING PAINT) PPG PAINTS LATEX CEILING PAINT, FLAT, BRIGHT WHITE
P-6 PAINT - TYPE 6 PPG PAINTS WATERBASED EPOXY SEMI GLOSS, OATMEAL,
PPG1023-1
SS-1 SOLID SURFACE - TYPE 1 CORIAN ARTISTA CANVAS
TME TO MATCH EXISTING - REFER TO DETAILS ON WALL FINISH PLANS
WP-1 WALL PROTECTION INPRO PALLADIUM RIGID SHEET: RIGID VINYL
PEPPERDUST 0119, 48"
WP-2 WALL PROTECTION INPRO RICHOCHET SORCERER DASH
WP-3 WALL PROTECTION INPRO PALLADIUM RIGID SHEET: RIGID VINYL STORM
CLOUD 0372, 48"
FINISH SCHEDULE - PHASE FIVE
ROOM FINISH
NUMBER NAME FLOOR BASE WALL CEILING
C2-5 CORRIDOR LVT-1 B-1 P-1 ACT-1
L225A ECHO ONE LVT-2 B-1 P-1/P-2 ACT-1
L227 NURSE STATION E-1 E-1 P-1/P-2 GYP/ ACT-1
L227A PREP/REC ONE E-1 E-1 P-1/P-2 GYP/ ACT-1
L227B PREP/REC TWO E-1 E-1 P-1/P-2 GYP/ ACT-1
L227C PREP/REC THREE E-1 E-1 P-1/P-2 GYP/ ACT-1
L227D PREP/REC FOUR E-1 E-1 P-1/P-2 GYP/ ACT-1
L227E PREP/REC FIVE E-1 E-1 P-1/P-2 GYP/ ACT-1
L227F PREP/REC SIX E-1 E-1 P-1/P-2 GYP/ ACT-1
L227G PATIENT TOILET CT-1 CT-2 CT-2/P-2 GYP
L227H OFFICE LVT-3 B-1 P-1/P-2 ACT-1
L227I SOILED E-1 E-1 P-1 GYP
L230 STRESS LAB E-1 E-1 P-1/P-2 GYP
SIGNAGE SCHEDULE - PHASE FIVE
MARK SIGN TYPE ROOM NAME ROOM NUMBER ADDITIONAL MESSAGE COUNT
27A1 IN-04.02 PREP/REC ONE L227A 1
27B1 IN-04.02 PREP/REC TWO L227B 1
27C1 IN-04.02 PREP/REC THREE L227C 1
27D1 IN-04.02 PREP/REC FOUR L227D 1
27E1 IN-04.02 PREP/REC FIVE L227E 1
27F2 IN-04.02 PREP/REC SIX L227F 1
225A IN-04.01 ECHO ONE L225A 1
227 IN-04.01 NURSE STATION L227 1
227A IN-04.01 PREP/REC ONE L227A 1
227B IN-04.01 PREP/REC TWO L227B 1
227C IN-04.01 PREP/REC THREE L227C 1
227D IN-04.01 PREP/REC FOUR L227D 1
227E IN-04.01 PREP/REC FIVE L227E 1
227F IN-04.01 PREP/REC SIX L227F 1
227G IN-09.03 PATIENT TOILET L227G RESTROOM 1
227H IN-04.01 OFFICE L227H 1
227I IN-04.01 SOILED L227I 1
227J IN-01.22 SOILED L227I Bio-Hazard 1
230 IN-04.01 STRESS LAB L230 1
FE-3 IN-01.31 NURSE STATION L227 Fire Equipment 1
0 100% BID DOCUMENTS 06/12/2026
1 ADDENDUM 01 06/29/2026
2 ADDENDUM 02 07/24/2026
File details come from the government source that posted it. Updated .