This is a plumbing demolition plan drawing for the second floor of a medical facility (MT Home, VA Medical Center), specifically addressing the Renovate Blvd 204 Cath Lab II project. The drawing is prepared as a 100% bid document and indicates fully sprinklered systems.
The plan specifies multiple plumbing removal and demolition tasks to be executed by the contractor, including: removal of plumbing fixtures and associated piping (note 11.01); removal and capping of domestic water piping (11.04); removal and capping of vent piping (11.05); removal and capping of medical air, medical vacuum, and oxygen piping (11.06); removal of medical gas outlets and wall patching (11.07); removal of medical gas zone valves and associated piping with wall patching (11.08); removal and capping of storm water piping (11.09); removal of floor drains with floor patching to match existing conditions (11.10); and removal of medical gas alarm panels with associated pressure switches and wiring (11.11). The contractor must field verify existing conditions and report any discrepancies to the Contracting Officer's Representative, and must comply with VHA Directive 1061 regarding healthcare-associated Legionella disease prevention and scald injury prevention, including prohibition of domestic water piping deadlegs greater than two pipe diameters in length. The drawing references sheet P001 for abbreviations, legend, and general project notes, and notification to the Energy Manager is required if deadlegs are removed during the project.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UUUU
TTTT
SSSS
RRRR
PPPP
NN
NN
MMMM
9.7
9.7
9.2
9.2
8.5
8.5
7.7
7.7
7.2
7.2
V A
OV
V A
V O
V A OV
V A
OV
4" SW DN
(E) 4" SW UP
(E) 6" OD UP
(E) 6" OD UP
(E) 4" SW UP
(E) 6" OD UP
(E) 4" SW UP
(E) 6" OD
DISCHARGE
(E) 6" OD
DISCHARGE
(E) 6" OD
4" SW DN
(E) 3" V UP
(E) 6" OD
TO VTR
2" V 2" V
(E) 4" SW DN
(E) 4" SW
CM
SINK
FM WC
WM LAV
FD
WM
SINK
CM
SINK
ZV
ZV
(E) 3/4" O
(E) 3/4" MA
(E) 1" MV
(E) 1" DHWR
(E) 1 1/2" DHW
(E) 2" DCW
3/4" MV
1 1/4" DCW
3/4" MA
1" DHW
3/4" O
3/4" MV
3/4" MA
3/4" O
1/2" MV
1/2" MA
1/2" O
3/4" MV
3/4" MA
3/4" O
1 1/4" DCW
1" DHW
1/2" 1/2"
1/2" DHW
1 1/4" DCW
AREA ALARM
PANEL
4" SW
3/4" O
3/4" MA
3/4" MV
3/4" O
3/4" MA
3/4" MV
11.04
11.09
11.1011.01 11.01
11.01
11.01
11.01
11.08 11.06
11.04
11.07
11.07
11.07 11.07
11.07
11.07
11.07
11.07 11.09
11.05
11.06
11.04
2" V
1/2" DHW
1/2" DCW
11.06
11.07
11.11
11.08
G E N E R A L N O T E S :
A.
B.
C.
REFER TO SHEET P001 FOR ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES.
CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND REPORT ANY DISCREPANCIES
THAT MAY IMPACT THE PROGRESS OF WORK TO THE COR.
ADHERE TO VHA DIRECTIVE 1061 FOR PREVENTION OF HEALTHCARE-ASSOCIATED
LEGIONELLA DISEASE AND SCALD INJURY FROM POTABLE WATER DISTRIBUTION SYSTEMS.
DOMESTIC WATER PIPING DEADLEGS ARE PROHIBITED. A DEADLEG IS DEFINED AS A DEAD
END GREATER THAN TWO PIPE DIAMETERS IN LENGTH. NOTIFY ENERGY MANAGER IF
DEADLEGS ARE REMOVED DURING THE PROJECT.
PROCEDURE
L225
EQUIPMENT CLOSET
L225A
CONTROL
L225C
DIRTY UTILITY
L225D
CATH LAB HOLDING
L225E
MEDS
L225F
TOILET
L225G
STORAGE
L225H
CATH LAB HOLDING
L221
STORAGE
L222B
HAND WASH
L225K
LOCKER ROOM
L222C
VFD
L222A
CORRIDOR
L222
EQUIPMENT STORAGE
L223
BREAK ROOM
L224
VFD
L231
KEY PLAN ENTIRE FLOOR
EXISTING BELOW
PHASE ON SHEET SHOWN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
F
Au to de sk
D oc s:
//M t H om e
VA
C at h
La b/
FF
E_
R en ov at e C at h
La b
II_
B2
_M
EP
(2
4)
.rv t
7/
/2
9:
:3
AM
PD102.5
PLUMBING SECOND FLOOR
DEMOLITION PLAN PHASE 5
06/12/2026 PP GP
RENOVATE BLDG 204 CATH LAB II 621-22-121
MT HOME, TENNESSEE
100% BID DOCUMENTS
MT HOME, VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"1 SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 5
D R A W I N G N O T E S :
11.01 REMOVE PLUMBING FIXTURE AND ASSOCIATED PIPING BACK TO POINTS SHOWN.
11.04 REMOVE DOMESTIC WATER PIPING BACK TO POINT SHOWN AND CAP.
11.05 REMOVE VENT PIPING BACK TO POINT SHOWN AND CAP.
11.06 REMOVE MA, MV, AND O PIPING BACK TO POINTS SHOWN AND CAP.
11.07 REMOVE MEDICAL GAS OUTLETS AND ASSOCIATED PIPING. PATCH WALL TO MATCH EXISTING
IF NECESSARY.
11.08 REMOVE MEDICAL GAS ZONE VALVE AND ASSOCIATED PIPING. PATCH WALL TO MATCH
EXISTING IF NECESSARY.
11.09 REMOVE STORM WATER PIPING TO POINT SHOWN AND CAP.
11.10 REMOVE FLOOR DRAIN AND ASSOCIATED PIPING. PATCH FLOOR TO MATCH EXISTING.
11.11 REMOVE MEDICAL GAS ALARM PANEL AND ASSOCIATED PRESSURE SWITCHES AND WIRING.
0 100% BID DOCUMENTS 06/12/2026
1 ADDENDUM 01 06/29/2026
2 ADDENDUM 02 07/24/2026
06/12/2026