11.10_PD102.5 - PLUMBING SECOND FLOOR DEMOLITION PLAN PHASE 5.pdf

PDF 526 KB Posted

Attached to
Z2DA--621-22-121 Renovate Bldg. 204 for Cath Lab II - Engineering
Solicitation number
36C24926R0057
Issued by

About this file

This is a plumbing demolition plan drawing for the second floor of a medical facility (MT Home, VA Medical Center), specifically addressing the Renovate Blvd 204 Cath Lab II project. The drawing is prepared as a 100% bid document and indicates fully sprinklered systems.

The plan specifies multiple plumbing removal and demolition tasks to be executed by the contractor, including: removal of plumbing fixtures and associated piping (note 11.01); removal and capping of domestic water piping (11.04); removal and capping of vent piping (11.05); removal and capping of medical air, medical vacuum, and oxygen piping (11.06); removal of medical gas outlets and wall patching (11.07); removal of medical gas zone valves and associated piping with wall patching (11.08); removal and capping of storm water piping (11.09); removal of floor drains with floor patching to match existing conditions (11.10); and removal of medical gas alarm panels with associated pressure switches and wiring (11.11). The contractor must field verify existing conditions and report any discrepancies to the Contracting Officer's Representative, and must comply with VHA Directive 1061 regarding healthcare-associated Legionella disease prevention and scald injury prevention, including prohibition of domestic water piping deadlegs greater than two pipe diameters in length. The drawing references sheet P001 for abbreviations, legend, and general project notes, and notification to the Energy Manager is required if deadlegs are removed during the project.

View the file

Other files

File Type Posted
00 01 10 - Table Of Contents 29072026.pdf PDF
07 42 13 - Insulated Metal Wall Panels.pdf PDF
07.314_AE301 - PENTHOUSE CONSTRUCTION.pdf PDF
09 54 00 - Operating Room Modular Diffuser System.pdf PDF
23 82 00 - Convection Heating and Cooling Units.pdf PDF
14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf PDF
14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf PDF
13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf PDF
S-102824-291.pdf PDF
01 45 35a - Schedule of SI.pdf PDF
28 05 00 - Common Work Results for Electronic Safety and Security.pdf PDF
07 41 13 - Insulated Metal Roof Panels.pdf PDF
14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf PDF
14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf PDF
07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf PDF
FINAL COORDINATION STUDY -- 12-17-19.pdf PDF
10 51 26 - Plastic Lockers and Bench.pdf PDF
09 05 16 - Subsurface Preparation For Floor Finishes.pdf PDF
01 45 35b - Statement of SI.pdf PDF
14.29_E501 - TECHNOLOGY DETAILS.pdf PDF
14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM PLAN.pdf PDF
14.02_E102 - SECOND FLOOR OVERALL PLAN.pdf PDF
14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.pdf PDF
07.705_AF702.5 - PHASE FIVE FINISH PLANS.pdf PDF
07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.pdf PDF
11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.pdf PDF
Revised Cath Shielding 2024.pdf PDF
Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.xlsx XLSX spreadsheet
36C24926R0057 0003.pdf PDF
28 23 00 - Video Surveillance.pdf PDF
01 45 35 - Special Inspections.pdf PDF
36C24926R0057 0002.pdf PDF
621-22-121 Site Visit Sign in sheet.pdf PDF
2026-0629 Cath Lab II - BID specs - Add 01.pdf PDF
36C24926R0057 0001.pdf PDF
2026-0629 Cath Lab II - BID Dwgs - Add 01.pdf PDF
621-22-121 Renovate B204 for Cath Lab II - Bid Specifications.pdf PDF
36C24926R0057_1.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
Price Breakout Schedule.xlsx XLSX spreadsheet
Contractor EMR Certification Form.docx DOCX document
621-22-121 Renovate B204 for Cath Lab II - Bid Drawings.pdf PDF
Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
WD TN20260191 2 Jan 2026.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UUUU

TTTT

SSSS

RRRR

PPPP

NN

NN

MMMM

9.7

9.7

9.2

9.2

8.5

8.5

7.7

7.7

7.2

7.2

V A

OV

V A

V O

V A OV

V A

OV

4" SW DN

(E) 4" SW UP

(E) 6" OD UP

(E) 6" OD UP

(E) 4" SW UP

(E) 6" OD UP

(E) 4" SW UP

(E) 6" OD

DISCHARGE

(E) 6" OD

DISCHARGE

(E) 6" OD

4" SW DN

(E) 3" V UP

(E) 6" OD

TO VTR

2" V 2" V

(E) 4" SW DN

(E) 4" SW

CM

SINK

FM WC

WM LAV

FD

WM

SINK

CM

SINK

ZV

ZV

(E) 3/4" O

(E) 3/4" MA

(E) 1" MV

(E) 1" DHWR

(E) 1 1/2" DHW

(E) 2" DCW

3/4" MV

1 1/4" DCW

3/4" MA

1" DHW

3/4" O

3/4" MV

3/4" MA

3/4" O

1/2" MV

1/2" MA

1/2" O

3/4" MV

3/4" MA

3/4" O

1 1/4" DCW

1" DHW

1/2" 1/2"

1/2" DHW

1 1/4" DCW

AREA ALARM

PANEL

4" SW

3/4" O

3/4" MA

3/4" MV

3/4" O

3/4" MA

3/4" MV

11.04

11.09

11.1011.01 11.01

11.01

11.01

11.01

11.08 11.06

11.04

11.07

11.07

11.07 11.07

11.07

11.07

11.07

11.07 11.09

11.05

11.06

11.04

2" V

1/2" DHW

1/2" DCW

11.06

11.07

11.11

11.08

G E N E R A L N O T E S :

A.

B.

C.

REFER TO SHEET P001 FOR ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES.

CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND REPORT ANY DISCREPANCIES

THAT MAY IMPACT THE PROGRESS OF WORK TO THE COR.

ADHERE TO VHA DIRECTIVE 1061 FOR PREVENTION OF HEALTHCARE-ASSOCIATED

LEGIONELLA DISEASE AND SCALD INJURY FROM POTABLE WATER DISTRIBUTION SYSTEMS.

DOMESTIC WATER PIPING DEADLEGS ARE PROHIBITED. A DEADLEG IS DEFINED AS A DEAD

END GREATER THAN TWO PIPE DIAMETERS IN LENGTH. NOTIFY ENERGY MANAGER IF

DEADLEGS ARE REMOVED DURING THE PROJECT.

PROCEDURE

L225

EQUIPMENT CLOSET

L225A

CONTROL

L225C

DIRTY UTILITY

L225D

CATH LAB HOLDING

L225E

MEDS

L225F

TOILET

L225G

STORAGE

L225H

CATH LAB HOLDING

L221

STORAGE

L222B

HAND WASH

L225K

LOCKER ROOM

L222C

VFD

L222A

CORRIDOR

L222

EQUIPMENT STORAGE

L223

BREAK ROOM

L224

VFD

L231

KEY PLAN ENTIRE FLOOR

EXISTING BELOW

PHASE ON SHEET SHOWN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

F

Au to de sk

D oc s:

//M t H om e

VA

C at h

La b/

FF

E_

R en ov at e C at h

La b

II_

B2

_M

EP

(2

4)

.rv t

7/

/2

9:

:3

AM

PD102.5

PLUMBING SECOND FLOOR

DEMOLITION PLAN PHASE 5

06/12/2026 PP GP

RENOVATE BLDG 204 CATH LAB II 621-22-121

MT HOME, TENNESSEE

100% BID DOCUMENTS

MT HOME, VA

MEDICAL

CENTER Approved: Owner

1/4" = 1'-0"1 SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 5

D R A W I N G N O T E S :

11.01 REMOVE PLUMBING FIXTURE AND ASSOCIATED PIPING BACK TO POINTS SHOWN.

11.04 REMOVE DOMESTIC WATER PIPING BACK TO POINT SHOWN AND CAP.

11.05 REMOVE VENT PIPING BACK TO POINT SHOWN AND CAP.

11.06 REMOVE MA, MV, AND O PIPING BACK TO POINTS SHOWN AND CAP.

11.07 REMOVE MEDICAL GAS OUTLETS AND ASSOCIATED PIPING. PATCH WALL TO MATCH EXISTING

IF NECESSARY.

11.08 REMOVE MEDICAL GAS ZONE VALVE AND ASSOCIATED PIPING. PATCH WALL TO MATCH

EXISTING IF NECESSARY.

11.09 REMOVE STORM WATER PIPING TO POINT SHOWN AND CAP.

11.10 REMOVE FLOOR DRAIN AND ASSOCIATED PIPING. PATCH FLOOR TO MATCH EXISTING.

11.11 REMOVE MEDICAL GAS ALARM PANEL AND ASSOCIATED PRESSURE SWITCHES AND WIRING.

0 100% BID DOCUMENTS 06/12/2026

1 ADDENDUM 01 06/29/2026

2 ADDENDUM 02 07/24/2026

06/12/2026