13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf
PDF 1 MB Posted
- Solicitation number
- 36C24926R0057
About this file
This document is a mechanical system design plan for the second floor HVAC infrastructure of a medical facility renovation project at MT Home, VA Medical Center. The drawing details the heating, hot water, and air distribution systems serving the Cath Lab and EP Cath Lab areas, along with associated support spaces including equipment rooms, control rooms, scrub areas, storage, and staff facilities.
The design specifies multiple new heating hot water piping connections to existing systems, installation of new room thermostats linked to variable air volume (VAV) boxes for climate control, and ductwork routing to an AHU CATH unit located on the roof. Key specifications include piping sizes ranging from 3/4" to 1-1/4" for both hot water supplies and returns, with both new and existing (marked as "E") components identified throughout. The drawing notes direct contractors to avoid existing electrical lighting equipment during installation and to lead-line low air return ductwork from floor level to seven feet above finished floor. The project is identified as a fully sprinklered facility under Phase 4 construction, with documentation prepared by FFE Engineering & Architecture for the U.S. Department of Veterans Affairs as 100% bid documents.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T
T
T
T
TTT
T
T
T
T T
T
T
T
T
T
T
RRRR
PPPP
NNNN
MMMM
LLLL
JJJJ
HHHH
GGGG
FFFF
EEEE
7.7
7.7
7.2
7.2
6.3
6.3
5.2
5.2
4.5
4.5
3.9
3.9
(E)14"x8" EA
(E) LD
250 CFM
(E) LD
250 CFM
(E) LD
250 CFM
(E) LD
250 CFM
(E) LD
250 CFM
(E) LD
250 CFM
(E) SD
240 CFM
(E) EG
260 CFM
(E) EG
440 CFM
(E) EG
170 CFM
(E ) T
U- 4_
"x
" R
A
RG-4
615 CFM
RG-4
615 CFM
RG-4
615 CFM
12"x10" RA
8"ø SA
SD-1
130 CFM
SD-1
120 CFM 8"ø SA
6"x6" RA
RG-1
120 CFM
SD-3
400 CFM
10"ø SA
RG-2
400 CFM
10"x10" RA
RG-2
560 CFM 12
"x
" R A
"x
" R
A 8" ø
SA
12"x10" SA
"x
" R
A
6" ø
SA
"x
" S A
SD-2
245 CFM
SD-3
400 CFM
10"ø SA 7"ø SA18"x16" SA
"ø
S
A TU-D_6
10"x8" RA
RG-2
350 CFM
RG-2
400 CFM
12"x12" RA
"x
" R
A
12"x8" SA 8"ø SA8"ø SA
12"x8" SA
TU
-D
_4
TU
-D
_1
SD-2
220 CFM
SD-2
220 CFM
20"x16" SA20"x16" SA18"x16" SA
20"x18" RA 20"x18" RA
RG-1
200 CFM
RG-1
200 CFM
18"x18" RA12"x12" RA10"x8" RA
SD-3
400 CFM
10"ø SA TU-D_3
RG-2
400 CFM
7"ø SA
"ø
S A
TU
-D
_2
RG-4
615 CFM
8"ø SA
SD-1
130 CFM
RG-4
615 CFM
RG-4
615 CFM
(E)14"x12" SA
TU-E_20
SD-2
245 CFM
(E)8"ø SA SD-2
245 CFM
6"x6" RA
SD-1
60 CFM
RG-1
60 CFM
"x
" S
A
RG-2
350 CFM
(E) SD
170 CFM
(E) RG
60 CFM
(E) SD
60 CFM
SD-2
245 CFM
24"x24" RA (UP) 22"x22" SA (UP)13.27
TU
-E
_1
ELECTRICAL
L252 TU
-E _1
TU
-D
_5
VFD
L222A
VFD
L231
STERILE STORAGE
L224
CORRIDOR
C2-5
CONTROL ROOM
L222C
CONTROL ROOM
L220A
EP CATH LAB
L220
CATH LAB
L222
SCRUB
L220B
STERILE STORAGE
L212
HAC
L215
GOWNING
L213
EQUIPMENT
L228
SCRUB
L222B
CORRIDOR
L222
LOCKER ROOM
L222C
PATIENT TOILET
L205
STAFF TOILET
L217
STAFF TOILET
L219
EKG TWO
L203B
CORRIDOR
C2-1
EKG ONE
L203A
ELECTRICAL
L226
EQUIPMENT
L216
CORRIDOR
C2-5
CORRIDOR
C2-6
13.30
EG-1
100 CFM
"x
8" S
A
6"ø SA 6"x6" EA
8" x8
" E A
12"x10" RA 12"x10" RA
"x
" R
A
"x
" R A
"x
" R
A
"x
" R
A
"x
" R
A
12"x10" RA
"x
" S
A
27"x9" SA
27"x9" SA
RG-4
615 CFM
27"x9" SA
RG-4
615 CFM
18"x18" RA
"x
" R A
28"x14" SA
13.39 13.39
13.39 13.39
13.39
13.39
12"x10" RA
13.39
12"x10" RA
RRRR
PPPP
NNNN
MMMM
LLLL
JJJJ
HHHH
GGGG
FFFF
EEEE
7.7
7.7
7.2
7.2
6.3
6.3
5.2
5.2
4.5
4.5
3.9
3.9
(E ) T
U- 4_
TU-D_3
TU
-D
_2 TU
-D
_1
TU
-D
_4
TU-D_6
TU
-D
_5
TU
-E
_1
TU
-E
_1
TU-E_20
(E) 1" HWS
3/4" HWR
3/4" HWS
1" HWR
1" HWS
3/4" HWS
3/4" HWR
(E) 3/4" HWR
(E) 3/4" HWS
(E) 3/4" HWS
(E) 3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
(E) 3/4" HWR
(E) 3/4" HWS
(E) 2" HWS
(E) 2" HWR
3/4" HWS
3/4" HWR
(E) 3/4" HWS
(E) 3/4" HWR
13.25 13.25
13.25
13.25
13.25
13.25
13.25
13.25
(E) 2" HWS
(E) 2" HWR
13.24
3/4" HWR
3/4" HWS
(E) 1" HWR
(E) 1" HWR
(E) 1" HWS
(E) 2" HWS
(E) 2" HWR 1 1/4" HWR
1 1/4" HWS
(E) 2" HWS
(E) 2" HWR
3/4" HWR
3/4" HWS
1" HWR
1" HWS
1" HWS
1" HWR
13.24
13.24
CATH LAB
L222
EP CATH LAB
L220
EQUIPMENT
L216
ELECTRICAL
L226
EQUIPMENT
L228
ELECTRICAL
L252
SCRUB
L222B
SCRUB
L220B
CONTROL ROOM
L222C
CONTROL ROOM
L220A
STERILE STORAGE
L224
CORRIDOR
C2-5
CORRIDOR
C2-5
VFD
L231
VFD
L222A
LOCKER ROOM
L222C
CORRIDOR
L222
CORRIDOR
C2-6
STAFF TOILET
L217
STAFF TOILET
L219
EKG TWO
L203B
EKG ONE
L203A
CORRIDOR
C2-1
CORRIDOR
C2-5
HAC
L215
GOWNING
L213
STERILE STORAGE
L212
KEY PLAN ENTIRE FLOOR
EXISTING BELOW
PHASE ON SHEET SHOWN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
F
Au to de sk
D oc s:
//M t H om e
VA
C at h
La b/
FF
E_
R en ov at e C at h
La b
II_
B2
_M
EP
(2
4)
.rv t
7/
/2
:3 3:
A
M
MH102.4
MECHANICAL SECOND FLOOR
HVAC PLAN - PHASE 4
06/12/2026 KF JV
RENOVATE BLDG 204 CATH LAB II 621-22-121
MT HOME, TENNESSEE
100% BID DOCUMENTS
MT HOME, VA
MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"1 SECOND FLOOR HVAC PLAN - PHASE 4
1/8" = 1'-0"2 SECOND FLOOR PIPING PLAN - PHASE 4
D R A W I N G N O T E S :
13.24 CONNECT NEW HEATING HOT WATER PIPING INTO EXISTING PIPING.
13.25 NEW ROOM THERMOSTATS. CONNECT TO CORRESPONDING VAV BOXES.
13.27 DUCTWORK UP TO AHU CATH ON THE ROOF.
13.30 AVOID EXISTING ELECTRICAL LIGHTING EQUIPMENT.
13.39 LEAD LINE LOW AIR RETURN DUCTWORK FROM FLOOR TO 7 FEET ABOVE FINISHED FLOOR.
0 100% BID DOCUMENTS 06/12/2026
1 ADDENDUM 01 06/29/2026
2 ADDENDUM 02 07/24/2026
07/24/2026
File details come from the government source that posted it. Updated .