3 AF Form 3052.pdf

PDF 98 KB Posted

Attached to
Repair Comm HQ, Facility 1540 Federal contract opportunity
Solicitation number
FA487721B0001
Issued by
Department of the Air Force Air Combat Command

About this file

This document includes a construction cost estimate breakdown and details for a federal contract opportunity to repair a base communications headquarters facility. The opportunity is a 100% small business set-aside issued by the Department of the Air Force Air Combat Command. Contractors shall furnish all labor, equipment, and materials to repair the Base Communications Headquarters Facility 1540 in accordance with the specifications. Site visits will be held on December 8th, 2020 and requests for information are due by December 10th. Bids for the project, estimated to be valued between $1 million and $5 million, are due by January 5th, 2021. The award date was not specified.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Comm HQ, Facility 1540, newest first.
File Type Posted
Special Notice - DM Access.pdf PDF
Attachment 11 RFI LOG_Gov Response.xlsx XLSX spreadsheet
Attachment 12 Site Visit Sign in Sheet.pdf PDF
Solicitation Amendment FA487721B00010001 SF 30.pdf PDF
Attachment 11 RFI LOG_Gov Response.xlsx XLSX spreadsheet
Solicitation - FA487721B0001.pdf PDF
1 Template of Contractor EAL.xls XLS spreadsheet
9 Contractor Environmental Guide_2019.pdf PDF
4 Bid Schedule.pdf PDF
5 Specifications.pdf PDF
7 Plans_Bldg 1540.pdf PDF
6 DMAFB Design Guide.pdf PDF
10 Submittal Register.xlsx XLSX spreadsheet
2 WD - AZ20190032 Sep 2020.pdf PDF
8 Asbestos Lead Paint Survey Report.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

Rpr Base Comm HQ, Fac 1540

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

FBNV 140013 Davis Monthan AFB, AZ

MATERIAL COST LABOR COSTS

UNIT OTHER

LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

COST TO PRIME

OVERHEAD- FIELD AND OFFICE

PROFIT

TAX

BOND

CONSTRUCTION COST

ESCALATION

CONTRACT COST

DESIGN FEE

OCCUPANCY CONDITIONS

SUPERVISION

TOTAL COST

AF Form 3052 JAN 88 PREVIOUS EDITION IS OBSOLETE PROJECT SUMMARY FOR OFFICIAL USE ONLY Page 1

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

Rpr Base Comm HQ, Fac 1540

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

FBNV 140013 Davis Monthan AFB, AZ

MATERIAL COST LABOR COSTS

UNIT OTHER

LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

ADDITION

1 Substructure

2 Superstructure

3 Exterior Closure

4 Roofing

5 Interior Construction

6 Interior Finishes

7 Conveying Systems

8 Plumbing

9 HVAC

10 Fire Protection Systems

11 Electrical Power and Lighting

12 Special Electrical Systems

13 Equipment

14 Furnishings

15 Special Construction

16 Selective Building Demolition

17 Site Preparation

18 Site Improvements

19 Site Mechanical Utilities

20 Site Electrical Utilities

SHEET TOTAL

AF Form 3052 JAN 88 PREVIOUS EDITION IS OBSOLETE SYSTEM SUMMARY FOR OFFICIAL USE ONLY Page 2

CONTRA CTOR:
ADDRESS:
PROPOSED TOTAL CONTRA CT PRICE:
PURCHA SE REQUEST NUMBER:
UNIT OF MEASURE 2Row1:
QUANTITY 3Row1:
UNIT 4Row1:
TOTAL 5Row1:
MANHOURS MANDAYS 6Row1:
AVERAGE RATE 7Row1:
TOTAL 8Row1:
OTHER DIRECT COSTS 9Row1:
LINE TOTAL 10Row1:
UNIT OF MEASURE 2COST TO PRIME:
QUANTITY 3COST TO PRIME:
UNIT 4Row2:
TOTAL 5Row2:
MANHOURS MANDAYS 6Row2:
AVERAGE RATE 7Row2:
TOTAL 8Row2:
OTHER DIRECT COSTS 9Row2:
LINE TOTAL 10Row2:
UNIT OF MEASURE 2Row3:
QUANTITY 3Row3:
UNIT 4Row3:
TOTAL 5Row3:
MANHOURS MANDAYS 6Row3:
AVERAGE RATE 7Row3:
TOTAL 8Row3:
OTHER DIRECT COSTS 9Row3:
LINE TOTAL 10Row3:
UNIT OF MEASURE 2OVERHEAD FIELD AND OFFICE:
QUANTITY 3OVERHEAD FIELD AND OFFICE:
UNIT 4Row4:
TOTAL 5Row4:
MANHOURS MANDAYS 6Row4:
AVERAGE RATE 7Row4:
TOTAL 8Row4:
OTHER DIRECT COSTS 9Row4:
LINE TOTAL 10Row4:
UNIT OF MEASURE 2PROFIT:
QUANTITY 3PROFIT:
UNIT 4Row5:
TOTAL 5Row5:
MANHOURS MANDAYS 6Row5:
AVERAGE RATE 7Row5:
TOTAL 8Row5:
OTHER DIRECT COSTS 9Row5:
UNIT OF MEASURE 2TAX:
QUANTITY 3TAX:
UNIT 4Row6:
TOTAL 5Row6:
MANHOURS MANDAYS 6Row6:
AVERAGE RATE 7Row6:
TOTAL 8Row6:
OTHER DIRECT COSTS 9Row6:
UNIT OF MEASURE 2BOND:
QUANTITY 3BOND:
UNIT 4Row7:
TOTAL 5Row7:
MANHOURS MANDAYS 6Row7:
AVERAGE RATE 7Row7:
TOTAL 8Row7:
OTHER DIRECT COSTS 9Row7:
LINE TOTAL 10Row6:
UNIT OF MEASURE 2CONSTRUCTION COST:
QUANTITY 3CONSTRUCTION COST:
UNIT 4Row8:
TOTAL 5Row8:
MANHOURS MANDAYS 6Row8:
AVERAGE RATE 7Row8:
TOTAL 8Row8:
OTHER DIRECT COSTS 9Row8:
LINE TOTAL 10Row7:
UNIT OF MEASURE 2ESCALATION:
QUANTITY 3ESCALATION:
UNIT 4Row9:
TOTAL 5Row9:
MANHOURS MANDAYS 6Row9:
AVERAGE RATE 7Row9:
TOTAL 8Row9:
OTHER DIRECT COSTS 9Row9:
UNIT OF MEASURE 2Row10:
QUANTITY 3Row10:
UNIT 4Row10:
TOTAL 5Row10:
MANHOURS MANDAYS 6Row10:
AVERAGE RATE 7Row10:
TOTAL 8Row10:
OTHER DIRECT COSTS 9Row10:
UNIT OF MEASURE 2CONTRACT COST:
QUANTITY 3CONTRACT COST:
UNIT 4Row11:
TOTAL 5Row11:
MANHOURS MANDAYS 6Row11:
AVERAGE RATE 7Row11:
TOTAL 8Row11:
OTHER DIRECT COSTS 9Row11:
UNIT OF MEASURE 2Row12:
QUANTITY 3Row12:
UNIT 4Row12:
TOTAL 5Row12:
MANHOURS MANDAYS 6Row12:
AVERAGE RATE 7Row12:
TOTAL 8Row12:
OTHER DIRECT COSTS 9Row12:
UNIT OF MEASURE 2DESIGN FEE:
QUANTITY 3DESIGN FEE:
UNIT 4Row13:
TOTAL 5Row13:
MANHOURS MANDAYS 6Row13:
AVERAGE RATE 7Row13:
TOTAL 8Row13:
OTHER DIRECT COSTS 9Row13:
UNIT OF MEASURE 2OCCUPANCY CONDITIONS:
QUANTITY 3OCCUPANCY CONDITIONS:
UNIT 4Row14:
TOTAL 5Row14:
MANHOURS MANDAYS 6Row14:
AVERAGE RATE 7Row14:
TOTAL 8Row14:
OTHER DIRECT COSTS 9Row14:
UNIT OF MEASURE 2SUPERVISION:
QUANTITY 3SUPERVISION:
UNIT 4Row15:
TOTAL 5Row15:
MANHOURS MANDAYS 6Row15:
AVERAGE RATE 7Row15:
TOTAL 8Row15:
OTHER DIRECT COSTS 9Row15:
UNIT OF MEASURE 2Row16:
QUANTITY 3Row16:
UNIT 4Row16:
TOTAL 5Row16:
MANHOURS MANDAYS 6Row16:
AVERAGE RATE 7Row16:
TOTAL 8Row16:
OTHER DIRECT COSTS 9Row16:
UNIT OF MEASURE 2TOTAL COST:
QUANTITY 3TOTAL COST:
UNIT 4Row17:
TOTAL 5Row17:
MANHOURS MANDAYS 6Row17:
AVERAGE RATE 7Row17:
TOTAL 8Row17:
OTHER DIRECT COSTS 9Row17:
UNIT OF MEASURE 2Row18:
QUANTITY 3Row18:
UNIT 4Row18:
TOTAL 5Row18:
MANHOURS MANDAYS 6Row18:
AVERAGE RATE 7Row18:
TOTAL 8Row18:
OTHER DIRECT COSTS 9Row18:
CONTRA CTOR_2:
ADDRESS_2:
PROPOSED TOTAL CONTRACT PRICE:
PURCHA SE REQUEST NUMBER_2:
UNIT OF MEASURE 2ADDITION:
QUANTITY 3ADDITION:
UNIT 4Row1_2:
TOTAL 5Row1_2:
MANHOURS MANDAYS 6Row1_2:
AVERAGE RATE 7Row1_2:
TOTAL 8Row1_2:
OTHER DIRECT COSTS 9Row1_2:
LINE TOTAL 10Row1_2:
UNIT OF MEASURE 2Substructure:
QUANTITY 3Substructure:
UNIT 4Row2_2:
TOTAL 5Row2_2:
MANHOURS MANDAYS 6Row2_2:
AVERAGE RATE 7Row2_2:
TOTAL 8Row2_2:
OTHER DIRECT COSTS 9Row2_2:
LINE TOTAL 10Row2_2:
UNIT OF MEASURE 2Superstructure:
QUANTITY 3Superstructure:
UNIT 4Row3_2:
TOTAL 5Row3_2:
MANHOURS MANDAYS 6Row3_2:
AVERAGE RATE 7Row3_2:
TOTAL 8Row3_2:
OTHER DIRECT COSTS 9Row3_2:
LINE TOTAL 10Row3_2:
UNIT OF MEASURE 2Exterior Closure:
QUANTITY 3Exterior Closure:
UNIT 4Row4_2:
TOTAL 5Row4_2:
MANHOURS MANDAYS 6Row4_2:
AVERAGE RATE 7Row4_2:
TOTAL 8Row4_2:
OTHER DIRECT COSTS 9Row4_2:
LINE TOTAL 10Row4_2:
UNIT OF MEASURE 2Roofing:
QUANTITY 3Roofing:
UNIT 4Row5_2:
TOTAL 5Row5_2:
MANHOURS MANDAYS 6Row5_2:
AVERAGE RATE 7Row5_2:
TOTAL 8Row5_2:
OTHER DIRECT COSTS 9Row5_2:
LINE TOTAL 10Row5_2:
UNIT OF MEASURE 2Interior Construction:
QUANTITY 3Interior Construction:
UNIT 4Row6_2:
TOTAL 5Row6_2:
MANHOURS MANDAYS 6Row6_2:
AVERAGE RATE 7Row6_2:
TOTAL 8Row6_2:
OTHER DIRECT COSTS 9Row6_2:
LINE TOTAL 10Row6_2:
UNIT OF MEASURE 2Interior Finishes:
QUANTITY 3Interior Finishes:
UNIT 4Row7_2:
TOTAL 5Row7_2:
MANHOURS MANDAYS 6Row7_2:
AVERAGE RATE 7Row7_2:
TOTAL 8Row7_2:
OTHER DIRECT COSTS 9Row7_2:
LINE TOTAL 10Row7_2:
UNIT OF MEASURE 2Conveying Systems:
QUANTITY 3Conveying Systems:
UNIT 4Row8_2:
TOTAL 5Row8_2:
MANHOURS MANDAYS 6Row8_2:
AVERAGE RATE 7Row8_2:
TOTAL 8Row8_2:
OTHER DIRECT COSTS 9Row8_2:
LINE TOTAL 10Row8_2:
UNIT OF MEASURE 2Plumbing:
QUANTITY 3Plumbing:
UNIT 4Row9_2:
TOTAL 5Row9_2:
MANHOURS MANDAYS 6Row9_2:
AVERAGE RATE 7Row9_2:
TOTAL 8Row9_2:
OTHER DIRECT COSTS 9Row9_2:
LINE TOTAL 10Row9:
UNIT OF MEASURE 2HVAC:
QUANTITY 3HVAC:
UNIT 4Row10_2:
TOTAL 5Row10_2:
MANHOURS MANDAYS 6Row10_2:
AVERAGE RATE 7Row10_2:
TOTAL 8Row10_2:
OTHER DIRECT COSTS 9Row10_2:
LINE TOTAL 10Row10:
UNIT OF MEASURE 2Fire Protection Systems:
QUANTITY 3Fire Protection Systems:
UNIT 4Row11_2:
TOTAL 5Row11_2:
MANHOURS MANDAYS 6Row11_2:
AVERAGE RATE 7Row11_2:
TOTAL 8Row11_2:
OTHER DIRECT COSTS 9Row11_2:
LINE TOTAL 10Row11:
UNIT OF MEASURE 2Electrical Power and Lighting:
QUANTITY 3Electrical Power and Lighting:
UNIT 4Row12_2:
TOTAL 5Row12_2:
MANHOURS MANDAYS 6Row12_2:
AVERAGE RATE 7Row12_2:
TOTAL 8Row12_2:
OTHER DIRECT COSTS 9Row12_2:
LINE TOTAL 10Row12:
UNIT OF MEASURE 2Special Electrical Systems:
QUANTITY 3Special Electrical Systems:
UNIT 4Row13_2:
TOTAL 5Row13_2:
MANHOURS MANDAYS 6Row13_2:
AVERAGE RATE 7Row13_2:
TOTAL 8Row13_2:
OTHER DIRECT COSTS 9Row13_2:
LINE TOTAL 10Row13:
UNIT OF MEASURE 2Equipment:
QUANTITY 3Equipment:
UNIT 4Row14_2:
TOTAL 5Row14_2:
MANHOURS MANDAYS 6Row14_2:
AVERAGE RATE 7Row14_2:
TOTAL 8Row14_2:
OTHER DIRECT COSTS 9Row14_2:
LINE TOTAL 10Row14:
UNIT OF MEASURE 2Furnishings:
QUANTITY 3Furnishings:
UNIT 4Row15_2:
TOTAL 5Row15_2:
MANHOURS MANDAYS 6Row15_2:
AVERAGE RATE 7Row15_2:
TOTAL 8Row15_2:
OTHER DIRECT COSTS 9Row15_2:
LINE TOTAL 10Row15:
UNIT OF MEASURE 2Special Construction:
QUANTITY 3Special Construction:
UNIT 4Row16_2:
TOTAL 5Row16_2:
MANHOURS MANDAYS 6Row16_2:
AVERAGE RATE 7Row16_2:
TOTAL 8Row16_2:
OTHER DIRECT COSTS 9Row16_2:
LINE TOTAL 10Row16:
UNIT OF MEASURE 2Selective Building Demolition:
QUANTITY 3Selective Building Demolition:
UNIT 4Row17_2:
TOTAL 5Row17_2:
MANHOURS MANDAYS 6Row17_2:
AVERAGE RATE 7Row17_2:
TOTAL 8Row17_2:
OTHER DIRECT COSTS 9Row17_2:
LINE TOTAL 10Row17:
UNIT OF MEASURE 2Site Preparation:
QUANTITY 3Site Preparation:
UNIT 4Row18_2:
TOTAL 5Row18_2:
MANHOURS MANDAYS 6Row18_2:
AVERAGE RATE 7Row18_2:
TOTAL 8Row18_2:
OTHER DIRECT COSTS 9Row18_2:
LINE TOTAL 10Row18:
UNIT OF MEASURE 2Site Improvements:
QUANTITY 3Site Improvements:
UNIT 4Row19:
TOTAL 5Row19:
MANHOURS MANDAYS 6Row19:
AVERAGE RATE 7Row19:
TOTAL 8Row19:
OTHER DIRECT COSTS 9Row19:
LINE TOTAL 10Row19:
UNIT OF MEASURE 2Site Mechanical Utilities:
QUANTITY 3Site Mechanical Utilities:
UNIT 4Row20:
TOTAL 5Row20:
MANHOURS MANDAYS 6Row20:
AVERAGE RATE 7Row20:
TOTAL 8Row20:
OTHER DIRECT COSTS 9Row20:
LINE TOTAL 10Row20:
UNIT OF MEASURE 2Site Electrical Utilities:
QUANTITY 3Site Electrical Utilities:
UNIT 4Row21:
TOTAL 5Row21:
MANHOURS MANDAYS 6Row21:
AVERAGE RATE 7Row21:
TOTAL 8Row21:
OTHER DIRECT COSTS 9Row21:
LINE TOTAL 10Row21:
UNIT OF MEASURE 221:
QUANTITY 321:
UNIT 4Row22:
TOTAL 5Row22:
MANHOURS MANDAYS 6Row22:
AVERAGE RATE 7Row22:
TOTAL 8Row22:
OTHER DIRECT COSTS 9Row22:
LINE TOTAL 10Row22:
UNIT OF MEASURE 2SHEET TOTAL:
QUANTITY 3SHEET TOTAL:
UNIT 4Row23:
TOTAL 5Row23:
MANHOURS MANDAYS 6Row23:
AVERAGE RATE 7Row23:
TOTAL 8Row23:
OTHER DIRECT COSTS 9Row23:
LINE TOTAL 10Row23:
LINE TOTAL 10Row8: