Attachment 11 RFI LOG_Gov Response.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Repair Comm HQ, Facility 1540 Federal contract opportunity
Solicitation number
FA487721B0001
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains responses to questions from contractors regarding a federal solicitation for repair work at a base communications headquarters facility. Key details include: the solicitation is for repair work at the Base Communications Headquarters, Facility 1540 at Davis Monthan Air Force Base; the contractor will furnish all labor, equipment, materials, and perform all operations necessary for the repairs in accordance with specifications; the site visit was on December 8, 2020 and RFIs were due by December 10, 2020 with responses posted by December 22, 2020; the bid due date is January 5, 2021 and the estimated project value is between $1,000,000 to $5,000,000; the acquisition is 100% set aside for small businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Comm HQ, Facility 1540, newest first.
File Type Posted
Special Notice - DM Access.pdf PDF
Attachment 11 RFI LOG_Gov Response.xlsx XLSX spreadsheet
Attachment 12 Site Visit Sign in Sheet.pdf PDF
Solicitation Amendment FA487721B00010001 SF 30.pdf PDF
Solicitation - FA487721B0001.pdf PDF
4 Bid Schedule.pdf PDF
5 Specifications.pdf PDF
7 Plans_Bldg 1540.pdf PDF
1 Template of Contractor EAL.xls XLS spreadsheet
3 AF Form 3052.pdf PDF
9 Contractor Environmental Guide_2019.pdf PDF
2 WD - AZ20190032 Sep 2020.pdf PDF
8 Asbestos Lead Paint Survey Report.pdf PDF
6 DMAFB Design Guide.pdf PDF
10 Submittal Register.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFI LOG
Solicitation FA487721B00001

Title Repair Base Comm HQ Fac 1540

RFI #QuestionContractorGovernment Response
1Can you please provide the name of the manufacture for the existing system controls in building 1540?Pilkington Contstruction Co.Existing components at this facility are controlled with Staefa direct digital controls (DDC). A new and complete DDC will be installed under this project. Controls shall be IAW Davis Monthan Design Compatibility Guidelines.
2Are the system controls monitored off site or by a 3rd party vendor?Pilkington Construction Co.Building is tied into the base wide EMCS .
3Please provide information related to the existing system controls.Pilkington Construction Co.See Response to 1
4Will the site Superintent also be allowed to fill the role of SSHO and CQM?Pilkington Contstruction Co.Superintendent can fulfill SSHO or CQM roles of if qualified
5Can you please provide “As-Builts” for the existing facility so we can determine the locations for existing Fire Alarm Devices?Pilkington Contstruction Co.Fire alarm devices indicated in plan are existing. Duct Detectors are required AHU-5. See Note Fire Alarm/Detection Note 2 on FP101 for additional information.
6There are five 5HP applications located on the Variable Frequency Drive Schedule on sheet M0.3. There are 3 different VFD part numbers. Please confirm this is correct. Our electrician believes they should all be ACH550-VCR-08A8-4.Guardian Construction Inc.VFDs specified are the basis of design. Substitutions of equipment will be considered.
7VFD #9 & 10 on the Variable Frequency Drive Schedule sheet M0.3 both call for NEMA 4 enclosures but also have note #2 which calls for NEMA 1 enclosures. Please confirm the correct enclosure.Guardian Construction Inc.Provide NEMA 4 enclosure.
8The ABB ACH550 VFD’s are being phased out and replaced with ACH580 VFD’s is it acceptable to use the newer model?Guardian Construction Inc.VFDs specified are the basis of design. Substitutions of equipment will be considered.
9On sheet M0.3 in the Variable Frequency Drive Schedule the Manufacturer/Model numbers show a -1 at the very end of the number, this in not a normal ABB model number, after the -4 which indicates 480V, there would be a +K466 after the -4 indicating the Ethernet Adapter. The part number would look like this: ACH550-VCR-08A8-4+k466 for a 5HP, 480V, NEMA 1 with Bypass and Ethernet Adapter. Please explain and confirm the -1 at the end of the model number.Guardian Construction Inc.VFDs specified are the basis of design. Ethernet adaptor is required per VFD schedule note 1. Contractor will ensure model provided meets project requirements.
10Is enhanced commissioning required for this project?Herman Construction GroupEnhanced Commissioning not required
11Verify that the Owner will be responsible for removing ALL equipment, unbolted furniture, personal effects, etc. from the affected areas prior to construction.Herman Construction GroupDust covers and protective enclosures will be required to protect government property/equipment. Computers and other personnel belongings will be removed by government. Furniture and other equipment will be protected in place.
12Is it the responsibility of the contractor to provide temporary facilities to the government while we are working in the facility?Herman Construction GroupThe facility will remain occupied throughout construction. Contractor will provide a sequence of operations which limits the affects of construction and maintains facility operations. Relocating occupants to temporary facilities is not anticipated.
13Specification section 01 45 00.00 10, 3.4.3 states:

In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: electrical, mechanical, structural, environmental, architectural, materials technician, Cx Agent/LEED Specialist. These individuals or specialized technical companies are employees of the prime or subcontractor; be responsible to the CQC System Manager; be physically present at the construction site during work on the specialized personnel's areas of responsibility; have the necessary education or experience in accordance with the experience matrix listed herein.

Is it the intent of the Government for us to budget these personnel to be on-site during the entire duration of work in each specialty area in addition to the full time QC manager? Consequently, adding $millions to the cost of general conditions over the duration of this project.

Herman Construction GroupIndividual can fulfil multiple roles (if qualified); but means and methods is subject to the contractor's discretion.
14Specification section 01 45 00.00 10, 3.4.2 states:

The CQC System Manager is required to be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this Contract.

Does this statement require simply a bachelors degree or a graduate degree such as a master's or a PhD.

Herman Construction Group"Graduate" is referring to a bachelor's degree
15Can the KTR reuse salvaged building components in the new buildout if they are in compliance with the RFP?Herman Construction GroupAll components are new unless otherwise specified.
16Provide sign-in sheets for the pre-bid site walk/meetingHerman Construction GroupSee attached sign in sheet to amendment 0001
17Confirm standard / permissible work hours during construction.Herman Construction GroupAssume 0730-1600 working hours. Hours may be adjusted to accommodate all parties.
18Please confirm that the Government will allow proposers a minimum of seven (7) days to respond to the RFP starting from the date that the Government responds to 100% of the RFIs receivedHerman Construction GroupConfirmed. In accordance with Amendment 0001, the new closing date is Jan 12, 2021
19Please provide existing DDC system details (make, model, version, BACnet Compatibility etc)Herman Construction GroupSee Response to 1
20Sheet M5.1, detail 9 illustrates the installation of a supply air plenum box on the existing CRAC unit located in server room 141. During the site visit it was noticed that there is a set of stairs that are not indicated on the plans. The stairs will impede on the installation of the plenum and ducting. Please advise.Orcom Construction GroupDuct work shown is schematic. Duct work will be adjusted to fit existing conditions.
21Can the work be accomplished by giving the contractor full access to HVAC zone?
a. Example: HVAC Zone 1 (zones TBD based on existing HVAC layout and new install) move occupants out, perform work, final acceptance of government for that zone, occupants move in, repeat next zone.MAC GC-Electric Inc.This approach is not acceptable.
22Will a laydown area for storage, construction office, dumpsters, ect.. be provided on site or remote?MAC GC-Electric Inc.Areas for laydown, construction office, dumpsters, etc., will be available on site.
23Does the government want the old HVAC units that are to be demoed or will the contractor dispose of off base?MAC GC-Electric Inc.Government reserves the right to salvage. Contractor will dispose all other materials not claimed by the government.
24The attachment 8 asbestos lead paint survey report is corrupted. Can you upload a new file to website?MAC GC-Electric Inc.The attachment appears to be opening properly, however, you may request a drop via DoD SAFE. Please email 2d Lt Durlauf to request drop-off.
25Note #13 on sheet A-111 calls for new vinyl faced batts at open storage 175. Please confirm this also applies to room 176.Guardian Construction Inc.Provide insulation as noted.
26The DMAFB Design Compatibility Guidelines are included in the bid package but not referenced on the plans. The existing equipment in the building is connected to the base-wide EMCS - will the new equipment be required to meet the industrial security standards called out in the ‘Authority to Operate’ protocol necessary to integrate into the base-wide EMCS at Davis Monthan?The Carlson CompanyThe new equipment shall be required to meet the industrial security standards called out in the ‘Authority to Operate’ protocol necessary to integrate into the base-wide EMCS at Davis Monthan.
27Where there are discrepancies between the Project specs and the 2017 DM Design guide (EMCS Controls & Press copper fittings) which one takes precedence?The Carlson CompanyConstruction shall be IAW Davis Monthan Design Compatibility Guidelines. Please inform CO of all discrepancies.
28Are press fitting acceptable on this project?The Carlson CompanyPress fitting are not acceptable.