10-Exhibit I_NFPA 110 EPSS Maintenance and Operation Testing Log_04012026_BA.pdf

NFPA Standard PDF 321 KB Posted

Attached to
Generator Maintenance
Solicitation number
1232SA26Q0395
Issued by

About this file

This document is a template for the NFPA 110 Emergency Power Supply System (EPSS) Maintenance and Operation Testing Log used for the Beltsville Agricultural Research Center (BARC) EPSS Generator/ATS/MTS Maintenance and Repair IDIQ contract with USDA-ARS in Beltsville, Maryland.

The log serves as a standardized record-keeping form for maintenance and operational testing of emergency power supply systems. It requires documentation of generator specifications including make, model, fuel type, engine model, serial number, standby kW rating, normal operating temperature, and normal oil pressure. The testing procedure consists of fourteen sequential steps performed during each test cycle: performing scheduled maintenance with specific gravity testing and general condition checks; recording running time meter readings; simulating power failure from cold start; documenting time delays on start, transfer, re-transfer, and shutdown; recording cranking time; transferring load to the EPS generator; and capturing AC voltage, frequency, amperage, and kW readings at multiple intervals. The form also requires recording oil pressure, battery charging rate (DC amps), and water or air temperature at initial startup, after 15 minutes of running time, and immediately prior to re-transfer to normal power. All testing must include a minimum 30-minute running period under load before returning to normal power and placing the unit in automatic operation mode. The log includes a date-tested column with multiple entries and requires operator initials to verify completion of each test cycle.

View the file

Other versions and copies of NFPA 110

File Revision Posted Attached to
ATTACHMENT A-NFPA 110-19(STANDARD FOR EMERGENCY POWER).pdf 2019 edition J059--SOURCES SOUGHT NOTICE- ANNUAL ATS AND PARALLEL SWITCH GEAR INSPECTION SERVICES
NFPA 110 2010 Edition Chapter 8.pdf 2010 Service of Emergency generator, automatic transfer switches, and relay panels FY24-26
Quarterly_Inspection_Checklist_2005_NFPA_110_Annex_A _Figure_A_8.3.1(a).docx 2005 Generator and Transfer Switch Service & Repairs
Quarterly_Inspection_Checklist_2005_NFPA_110_Annex_A _Figure_A_8.3.1(a).docx 2005 Emergency Generator Service and Repair Contract
11-Exhibit J_NFPA 110 EPSS Operational Test Report_04012026_BA.pdf Revision not stated Generator IDIQ
7-Exhibit F_NFPA 110 EPSS Maintenance History Form_04012026_BA.pdf Revision not stated Generator IDIQ
9-Exhibit H_NFPA 110 EPSS Suggested Maintenance Schedule_04012026_BA.pdf Revision not stated Generator IDIQ
10-Exhibit I_NFPA 110 EPSS Maintenance and Operation Testing Log_04012026_BA.pdf Same revision and size as this file Revision not stated Generator IDIQ
8-Exhibit G_NFPA 110 EPSS Maintenance Log_04012026_BA.pdf Revision not stated Generator IDIQ
10-Exhibit I_NFPA 110 EPSS Maintenance and Operation Testing Log_04012026_BA.pdf Same revision and size as this file Revision not stated Generator IDIQ Contract
9-Exhibit H_NFPA 110 EPSS Suggested Maintenance Schedule_04012026_BA.pdf Revision not stated Generator IDIQ Contract
8-Exhibit G_NFPA 110 EPSS Maintenance Log_04012026_BA.pdf Revision not stated Generator IDIQ Contract
11-Exhibit J_NFPA 110 EPSS Operational Test Report_04012026_BA.pdf Revision not stated Generator IDIQ Contract
7-Exhibit F_NFPA 110 EPSS Maintenance History Form_04012026_BA.pdf Revision not stated Generator IDIQ Contract
11-Exhibit J_NFPA 110 EPSS Operational Test Report_04012026_BA.pdf Revision not stated Generator Maintenance
8-Exhibit G_NFPA 110 EPSS Maintenance Log_04012026_BA.pdf Revision not stated Generator Maintenance
9-Exhibit H_NFPA 110 EPSS Suggested Maintenance Schedule_04012026_BA.pdf Revision not stated Generator Maintenance
7-Exhibit F_NFPA 110 EPSS Maintenance History Form_04012026_BA.pdf Revision not stated Generator Maintenance
S.O.W. NFPA-110.pdf Revision not stated NFPA 110 Course Power Generating Equipment Training
RFQ_NFPA_110.pdf Revision not stated NFPA 110 and Power Gerating Equipment Training
Show all 20

Who attaches NFPA 110

State Files
Massachusetts 1

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BARC EPSS (Generator/ATS/MTS) Maintenance and Repair IDIQ Beltsville Agricultural Research Center (BARC) USDA-ARS, Beltsville, MD

Exhibit I NFPA 110 EPSS Maintenance and Operation Testing Log

NFPA 110 Maintenance and Operational Testing Log

Site/Location:

Generator Make/Model: Fuel Type:

Engine Model: Normal Operating Temp: Standby kW Rating: kW

Serial #: Normal Oil Pressure: 30% of Standby Rating: kW

Date Tested

1) Perform maintenance per Maintenance Schedule Test Specific Gravity Complete Checklist General Condition

2) Record running time meter (RTM) at start and end of test.

Start (Hrs.)

End (Hrs.)

3) Simulate power failure from a cold start using test switch or opening normal power supply.

4) Observe and record time delay (T/D) on start.

T/D Start (sec)

5) Record cranking time (terminates when engine starts).

Crank time (sec)

6) Transfer load to EPS Generator.

T/D Transfer (sec)

7) Record AC voltage, frequency, amperage.

AC Voltage Hz AC Amps AC kW

8) Record initial oil pressure and battery charging rate.

Oil pressure (psi) DC Amps

9) Record oil pressure, battery charging rate, and water or air temp after 15-min running time.

Oil pressure (psi) DC Amps Water/Air Temp

10) Re-transfer back to normal power after running under load for a minimum of 30 minutes.

11) Record engine and AC instruments just prior to re-transfer.

Oil pressure (psi) DC Amps Water/Air Temp AC Voltage Hz AC Amps AC kW

12) Record time delay on re-transfer.

T/D re-transfer (min)

13) Record time delay on shutdown for units so equipped.

T/D Stop (min)

14) Place unit in automatic operation mode.

Operator Initials