This is a Schedule of Material Submittals template for the BARC EPSS (Generator/ATS/MTS) Maintenance and Repair Indefinite Delivery, Indefinite Quantity (IDIQ) contract at the Beltsville Agricultural Research Center (BARC), USDA-ARS in Beltsville, Maryland.

The template establishes a structured framework for tracking contractor submittals throughout the contract period. Seven line items are identified for submission, including: Project Schedule with SWD Maintenance Schedule and Initial Inventory/Inspection Report (Specification Section 01 32 16.00 20); Monthly Reports (Section 01 32 16.00 20); Project Record Documents (Section 01 78 00); Documentation on Diverting Project Waste to Recycle (Section 01 78 00); Safety Plan (Section 01 78 00); Project O&M Manuals if required (Section 01 78 00); and Apparatus Inspection and Testing (Section 26 20 00). The template provides columns for the Contracting Officer Representative (COR) to identify required submittal types (certificates of compliance, shop drawings, samples, color selections, manufacturer recommendations, warranties, catalog/product data, operating instructions, test reports, and other specification-required items), required submission dates, dates received by the COR, return suspense dates, contractor notification dates, and approval/disapproval status with submittal numbers. The Contract Administrator completes corresponding columns documenting the approval process and contractor resubmittal requirements. Lines 8-23 remain blank for additional submittals as needed during contract performance.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BARC EPSS (Generator/ATS/MTS) Maintenance and Repair IDIQ Beltsville Agricultural Research Center (BARC) USDA-ARS, Beltsville, MD

Exhibit E Schedule of Material Submittals

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER:

PROJECT TITLE:

SOLICITATION/CONRTACT NUMBER:

TO BE COMPLETED BY COR TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LINE NO.

SOW /PWS/

SPECIFICATION NO: ITEM CE

RT

IF

IC

AT

E O

F

CO

M

PL

IA

N

CE

SH

O

P

DR

AW

IN

G S

SA

M

PL

ES

CO

LO

R

SE

LE

CT

IO

N

M

AN

U

FA

CT

U

RE

R'

S

RE

CO

M

M

EN

DA

TI

O N

S

M

AN

U

FA

CT

U

RE

R'

S W

AR

RE

N

TY

CA

TA

LO

G

PR

O

DU

CT

D

AT

A

O

PE

RA

TI

N G

IN

ST

RU

CT

IO

N

S

TE

ST

R

EP

O

RT

S

O

TH

ER

(S

EE

S

PE

CI

FI

CA

TI

O

N

REQUIRED

SUBMISSION

DATE

DATE TO

COR

DATE

CONTRACTING

OFFICER

RECEIVED

RETURN

SUSPENSE DATE

DATE

CONTRACTOR

NOTIFIED

APPROVED

(INSERT

SUBMITTAL

NUMBER)

DISAPPROVED

(INSERT

SUBMITTAL

NUMBER)

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

Specification Section 01

32 16.00 20 Project Schedule X

SWD Maintenance Schedule X SWD Initial Inventory and Inspection Report X

Specification Section 01

32 16.00 20 Monthly Reports X

Specification Section 01

78 00 Project Record Documents X X X X X

Specification Section 01

78 00 Documentation on Diverting Project Waste to Recycle

X

Specification Section 01

78 00 Safety Plan

Specification Section 01

78 00 Project O&M Manuals (if required) X

Specification Section 26

20 00 Apparatus Inspection and Testing X X X X X X

BARC EPSS (Generator/ATS/MTS) Maintenance and Repair IDIQ