Issued by

About this file

This document is Exhibit G of the BARC EPSS (Generator/ATS/MTS) Maintenance and Repair IDIQ contract, containing the NFPA 110 Emergency Power Supply System (EPSS) Maintenance Log template for the Beltsville Agricultural Research Center (BARC), USDA-ARS in Beltsville, Maryland.

The maintenance log template is based on NFPA 110-2022 Figure A.8.3.1(b) and provides a standardized framework for tracking preventive and corrective maintenance activities on emergency power generation systems. The log accommodates two maintenance levels (Level 1 and Level 2) and uses frequency abbreviations: W (Weekly), M (Monthly), Q (Quarterly), S (Semi-Annual), and A (Annually), with some items indexed to operating hours (3/500 hours, 5/500 hours). The template requires documentation of generator model, engine model, installation date, standby kW nameplate rating, 30% of standby rating, fuel type, and normal operating temperature. Maintenance components tracked across multiple sections include: Fuel System (supply tank, day tank, pumps, filters, hoses, piping, and wiring); Lubrication System (oil level, changes, filters, and breather); Cooling System (coolant, antifreeze, water flow, radiator, belts, and ductwork); Exhaust System (leakage, condensate, insulation, and supports); Battery System (electrolyte, terminals, specific gravity, and charger); Electrical System (connections, safeties, circuit breakers, and transfer switch); Prime Mover/Engine (air cleaner, governor, ignition, injectors, and load testing); Generator End (brushes, commutator, rotor, stator, bearings, and voltage regulator); General Condition (unusual noises, vibrations, leakage, and service area); and Automatic Transfer Switch (general inspection, exercising under load, controls, contacts, and thermographic scanning). The log provides columns for recording readings and dates for each maintenance activity across multiple inspection periods.

View the file

Other versions and copies of NFPA 110

File Revision Posted Attached to
ATTACHMENT A-NFPA 110-19(STANDARD FOR EMERGENCY POWER).pdf 2019 edition J059--SOURCES SOUGHT NOTICE- ANNUAL ATS AND PARALLEL SWITCH GEAR INSPECTION SERVICES
NFPA 110 2010 Edition Chapter 8.pdf 2010 Service of Emergency generator, automatic transfer switches, and relay panels FY24-26
Quarterly_Inspection_Checklist_2005_NFPA_110_Annex_A _Figure_A_8.3.1(a).docx 2005 Generator and Transfer Switch Service & Repairs
Quarterly_Inspection_Checklist_2005_NFPA_110_Annex_A _Figure_A_8.3.1(a).docx 2005 Emergency Generator Service and Repair Contract
11-Exhibit J_NFPA 110 EPSS Operational Test Report_04012026_BA.pdf Revision not stated Generator IDIQ
7-Exhibit F_NFPA 110 EPSS Maintenance History Form_04012026_BA.pdf Revision not stated Generator IDIQ
9-Exhibit H_NFPA 110 EPSS Suggested Maintenance Schedule_04012026_BA.pdf Revision not stated Generator IDIQ
10-Exhibit I_NFPA 110 EPSS Maintenance and Operation Testing Log_04012026_BA.pdf Revision not stated Generator IDIQ
10-Exhibit I_NFPA 110 EPSS Maintenance and Operation Testing Log_04012026_BA.pdf Revision not stated Generator IDIQ Contract
9-Exhibit H_NFPA 110 EPSS Suggested Maintenance Schedule_04012026_BA.pdf Revision not stated Generator IDIQ Contract
8-Exhibit G_NFPA 110 EPSS Maintenance Log_04012026_BA.pdf Same revision and size as this file Revision not stated Generator IDIQ Contract
11-Exhibit J_NFPA 110 EPSS Operational Test Report_04012026_BA.pdf Revision not stated Generator IDIQ Contract
7-Exhibit F_NFPA 110 EPSS Maintenance History Form_04012026_BA.pdf Revision not stated Generator IDIQ Contract
11-Exhibit J_NFPA 110 EPSS Operational Test Report_04012026_BA.pdf Revision not stated Generator Maintenance
8-Exhibit G_NFPA 110 EPSS Maintenance Log_04012026_BA.pdf Same revision and size as this file Revision not stated Generator Maintenance
9-Exhibit H_NFPA 110 EPSS Suggested Maintenance Schedule_04012026_BA.pdf Revision not stated Generator Maintenance
7-Exhibit F_NFPA 110 EPSS Maintenance History Form_04012026_BA.pdf Revision not stated Generator Maintenance
10-Exhibit I_NFPA 110 EPSS Maintenance and Operation Testing Log_04012026_BA.pdf Revision not stated Generator Maintenance
S.O.W. NFPA-110.pdf Revision not stated NFPA 110 Course Power Generating Equipment Training
RFQ_NFPA_110.pdf Revision not stated NFPA 110 and Power Gerating Equipment Training
Show all 20

Who attaches NFPA 110

State Files
Massachusetts 1

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BARC EPSS (Generator/ATS/MTS) Maintenance and Repair IDIQ Beltsville Agricultural Research Center (BARC) USDA-ARS, Beltsville, MD

Exhibit G NFPA 110 EPSS Maintenance Log

EPSS Maintenance Log Source: NFPA 110-2022 Figure A.8.3.1(b)

Generator Model: Engine Model: Date Installed:

Standby kW nameplate rating: kW 30% of Standby Rating: kW Fuel: Normal Operating Temp: F Performed by: (Initials)

W=Weekly S=Semi-Annual M=Monthly A=Annually

Q=Quarterly #'s=hours Component (as applicable) Level 1 Level 2

Fuel System Main supply tank level W M Day tank level W M Day tank float switch W Q Supply or transfer pump operation W Q Solenoid valve operation W Q Strainer, filter and/or dirt leg Q Q Water in system W Q Flexible hose and connectors W M Tank vents/overflow pipe blocked A A Piping A A Wiring in fuel system A A Fuel in main tank A A

Lubrication System Oil level W M Oil change 50 or A 50 or A Oil filter 50 or A 50 or A Lube oil heater W M Crankcase breather Q S

Cooling System Coolant level W M Antifreeze protection level S A Antifreeze A A Adequate cooling water to heat exchanger W M Rod out heat exchanger A A Adequate fresh air through radiator W M Clean exterior of radiator A A Fan and alternator belts M Q Water pump W Q Flexible water hoses and connections W M Jacket water heater W M Inspect ductwork, clean louvers A A Louver motor and controls A A

Exhaust System Leakage W M Drain condensate trap W M Insulation and fire hazards Q Q Excessive back pressure A A Exhaust system hanger and supports A A Flexible exhaust section S S

Battery System Electrolyte level W M Terminals clean and tight Q Q Remove corrosion from case M M Specific gravity or state of charge M M Charger and charge rate M M Equalize charge M M

Fill In Appropriate Readings

Date

Generator Model: Engine Model: Date Installed:

Standby kW nameplate rating: kW 30% of Standby Rating: kW Fuel: Normal Operating Temp: F Performed by: (Initials)

W=Weekly S=Semi-Annual M=Monthly A=Annually

Q=Quarterly #'s=hours Component (as applicable) Level 1 Level 2

Electrical System General inspection W M Tighten control and power wiring connections A A Wire chafing if subject to movement Q S Operation of safeties and alarms S S Boxes, panels and cabinets S S Circuit breakers, fuses M A Transfer switch main contacts A A Calibration of voltage-sensing relays/devices A A Wire insulation breakdown 5/500a 3/500b

Prime Mover (Engine) General inspection W M Service air cleaner S S Governor oil level and linkage M M Governor oil A A Ignition system - plugs, cap, rotor, secondary wire insulation A A Choke setting and carburetor adjustment S S Injector pump and injectors for flow rate, pressure, and/or spray pattern A A Load test at minimum of 30% nameplate rating 3/4c 3/4c

Valve clearance 3/500b 3/500b

Torque bolts 3/500b 3/500b

Generator End Brush length, appearance free to move in holder S S Commutator and slip rings A A Rotor and stator A A Bearings A A Bearing grease A A Exciter A A Voltage regulator A A Measure and record resistance readings of windings with insulation tester (Megger) A A

General Condition Unusual noises, vibrations, leakage, temperatures or deterioration W M Service room/surrounding area W M Restore system to automatic operation condition W M a Every 5 years or 500 hours b Every 3 years or 500 hours c Every 3 years for 4 hours

Generator Model: Engine Model: Date Installed:

Standby kW nameplate rating: kW 30% of Standby Rating: kW Fuel: Normal Operating Temp: F Performed by: (Initials)

W=Weekly S=Semi-Annual M=Monthly A=Annually

Q=Quarterly #'s=hours Component (as applicable) Level 1 Level 2

Automatic Transfer Switch General inspection W M Exercise the system under load W M Automatic control system M Q Cabinet exterior M Q Tighten external components M Q External operating mechanism Q A Inspect interior of transfer switch Q A Tighten internal components A A LED indicators and remote control systems operation A A Transfer switch main contacts A A Tighten wiring connections A A Thermographic temperature scan A A Wire insulation deterioration A A