Quarterly Inspection Requirements (Twice per year):
INDIAN HEALTH SERVICE-EMERGENCY POWER SUPPLY
LEVEL 2 Emergency Generator
QUARTERLY INSPECTION CHECKLIST
Based from the 2005 NFPA 110, Annex A, figure A 8.3.1(a)
TURN MACHINE TO OFF AND LOCKOUT - PUT ON SAFETY GEAR
(A) Check day tank float switch
| (B) |
| Check supply or transfer pump operation |
| (C) |
| Check solenoid valve operation |
Check hand pump
| (D) |
| Check for water in main tank |
Day tank
Water Separators
| (E) |
| Clean the strainer, filter, dirt leg, or combination |
NA, monthly PM performed by facility
| (A) |
| Check fan and alternator belts |
| (B) |
| Check for water pump leaks |
| (A) |
| Insulation and fire hazards |
| (A) |
| Check condition of cable ends and connections |
NA, see annual and semi-annual PM task codes
NA, see annual and monthly PM task codes
| 8. |
| GENERAL CONDITION OF EPSS |
NA, monthly PM performed by facility
| 9. |
| REMOVE LOCKOUT AND RESTORE UNIT TO AUTO POSITION |
| (A) |
| Return safety gear to proper location |
Semi Annual Inspection Requirements (Once per year):
INDIAN HEALTH SERVICE-EMERGENCY POWER SUPPLY
LEVEL 2 Emergency Generator
SEMIANNUAL INSPECTION CHECKLIST
Based from the 2005 NFPA 110, Annex A, figure A 8.3.1(a)
TURN MACHINE TO OFF AND LOCKOUT - PUT ON SAFETY GEAR
NA, See weekly PM Task Code Elec-PM-02L1-W
| (A) |
| Inspect and clean the crankcase breather |
NA, See monthly and quarterly PM Task Code
| (A) |
| Inspect the flexible exhaust section |
NA, See weekly PM Task Code Elec-PM-02L1-M
| (A) |
| Test the operation of the safeties and alarms |
| (B) |
| Clean boxes, panels, and cabinets |
| (C) |
| Check for wire chafing where subject to movement |
| (A) |
| Clean or replace the air cleaner |
| (B) |
| Check choke setting and carburetor adjustment |
| (A) |
| Check and clean brush length, appearance, |
free to move in holder
| 9. |
| GENERAL CONDITION OF EPSS |
NA, See weekly PM Task Code Elec-PM-02L1-W
| 10. |
| REMOVE LOCKOUT AND RESTORE UNIT TO AUTO POSITION |
| (A) |
| Return safety gear to proper location |
Annual Inspection Requirements (Once per year):
INDIAN HEALTH SERVICE-EMERGENCY POWER SUPPLY
LEVEL 2 Emergency Generator
ANNUAL INSPECTION CHECKLIST
Based from the 2005 NFPA 110, Annex A, figure A 8.3.1(a)
TURN MACHINE TO OFF AND LOCKOUT - PUT ON SAFETY GEAR
PARAMETERS ( Important! Individual EPSS parameters, e.g., minimum and maximum oil
| ↓ |
| pressure, should be determined and listed for all items) |
| (A) |
| Test the tank vents and overflow piping is unobstructed |
| (C) |
| Test the quality of the diesel fuel in the main tank |
| (A) |
| Change oil and filter every 50 hours or annually |
| (A) |
| Test the antifreeze protection level |
| (B) |
| Change the antifreeze |
| (C) |
| Rod out heat exchanger |
| (D) |
| Clean exterior of radiator |
| (E) |
| Inspect duct work and clean louvers |
| (A) |
| Test for excessive back pressure |
| (B) |
| Inspect exhaust system hangers and supports |
NA, See weekly PM Task Code Elec-PM-02L1-M
| (A) |
| Tighten control and power wiring connections |
| (B) |
| Check, clean and test circuit breakers and fuses |
| (C) |
| Check and clean transfer switch main contacts |
| (D) |
| Test the calibration of voltage-sensing relays/devices |
| (B) |
| Check, clean, or test ignition system-plugs, points, |
coil, cap rotor, secondary wire insulation
| (C) |
| Test injector pump and injectors for flow rate pressure |
and/or spray pattern
| (A) |
| Check and clean commutator and slip rings |
| (B) |
| Inspect and clean rotor and stator |
| (C) |
| Inspect and/or replace bearing(s) |
| (D) |
| Check and/or replace bearing grease |
| (E) |
| Check and clean Exciter |
| (F) |
| Check and clean voltage regulator |
| (E) |
| Measure and record resistance reading of windings |
with insulation tester (megger)
| 9. |
| GENERAL CONDITION OF EPSS |
NA, See weekly PM Task Code Elec-PM-02L1-W
| 10. |
| REMOVE LOCKOUT AND RESTORE UNIT TO AUTO POSITION |
| (A) |
| Return safety gear to proper location |
3-Year Test:
INDIAN HEALTH SERVICE-EMERGENCY POWER SUPPLY
LEVEL 1 & 2 Emergency Generator
3-YEAR TEST & INSPECTION CHECKLIST
Based from the 2005 NFPA 110, Annex A, figure A 8.3.1(a)
TURN MACHINE TO OFF AND LOCKOUT - PUT ON SAFETY GEAR
PARAMETERS ( Important! Individual EPSS parameters, e.g., minimum and maximum oil
| ↓ |
| pressure, should be determined and listed for all items) |
NA, See weekly PM Task Code Elec-PM-02L1-W
NA, See weekly or monthly PM task Code
NA, See monthly and quarterly PM Task Code
NA, See weekly or monthly PM task Code
NA, See weekly or monthly PM task Code
| (A) |
| Test wire insulation break down every 3 yrs or 500 hrs |
| (A) |
| Test EPS at minimum 30% nameplate rating |
for 4 hours (see NFPA 110, 8.4.9)
| (B) |
| Test valve clearance every 3 years or 500 hours |
| (C) |
| Test torque bolts every 3 years or 500 hours |
NA, See annual PM Task Code
| 9. |
| GENERAL CONDITION OF EPSS |
NA, See weekly PM Task Code Elec-PM-02L1-W
| 10. |
| REMOVE LOCKOUT AND RESTORE UNIT TO AUTO POSITION |
| (A) |
| Return safety gear to proper location |