11-Exhibit J_NFPA 110 EPSS Operational Test Report_04012026_BA.pdf
NFPA Standard PDF 460 KB Posted
- Attached to
- Generator IDIQ
- Solicitation number
- 1232SA26Q1346
About this file
This document is an NFPA 110 Operational Test Report form for the Beltsville Agricultural Research Center (BARC) Emergency Power Supply System (EPSS) Maintenance and Repair IDIQ contract with USDA-ARS in Beltsville, Maryland. The report is a standardized template used to document monthly operational testing and maintenance of generator sets, automatic transfer switches (ATS), and manual transfer switches (MTS) to ensure compliance with NFPA 110 standards for Level 1 and Level 2 emergency power systems.
The form requires technicians to record specific operational parameters during a cold start test, including time delays on start and re-transfer, cranking time, AC voltage and frequency measurements, amperage readings, oil pressure, battery charging rates, and water or air temperature at multiple intervals during at least 30 minutes of operation under load. Key testing requirements include achieving a minimum 30% of nameplate load rating, verifying transfer switch operation from normal to alternate position and back, ensuring one-second minimum start time delay and five-minute minimum re-transfer and shutdown time delays, and recording the running time meter before and after testing. The form includes checkboxes for documenting whether cold start capability was achieved, minimum load requirements were met, and transfer switches operated electrically as required. Technicians must document maintenance completion, battery specific gravity testing, general equipment condition assessment, and any unsatisfactory conditions or corrective actions taken.
View the file
Other versions and copies of NFPA 110
Show all 20
Who attaches NFPA 110
| State | Files |
|---|---|
| Massachusetts | 1 |
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BARC EPSS (Generator/ATS/MTS) Maintenance and Repair IDIQ Beltsville Agricultural Research Center (BARC) USDA-ARS, Beltsville, MD
Exhibit J NFPA 110 EPSS Operational Test Report
NFPA 110 Operational Test Report
Site/Location:
Generator Make/Model: Fuel Type:
Engine Model: Standby kW Rating: kW
Serial #: 30% of Standby Rating: kW
Date Tested
1) Perform maintenance per Maintenance Schedule
Test Battery Specific Gravity Pass / Fail (all cells 1250-1275)
Complete Checklist o
General Condition Poor / Avg / Good
2) Record running time meter (RTM) at start and end of test.
Start (Hrs.)
End (Hrs.)
3) Simulate power failure from a cold start using test switch or opening normal power supply.
4) Observe and record time delay (T/D) on start.
T/D Start (sec) 1 sec minimum
5) Record cranking time (terminates when engine starts).
Crank time (sec)
6) Transfer load to EPS Generator.
T/D Transfer (sec) 10 sec for Type 10 EPSS
7) Record AC voltage, frequency, amperage.
AC Voltage
Hz
AC Amps
AC kW
8) Record initial oil pressure and battery charging rate.
Oil pressure (psi)
DC Amps
9) Record oil pressure, battery charging rate, and water or air temp after 15-min running time.
Oil pressure (psi)
DC Amps
Water/Air Temp
10) Re-transfer back to normal power after running under load for a minimum of 30 minutes.
11) Record engine and AC instruments just prior to re-transfer.
Oil pressure (psi)
DC Amps
Water/Air Temp
AC Voltage
Hz
AC Amps
AC kW
12) Record time delay on re-transfer.
T/D re-transfer (min) 5 min minimum
13) Record time delay on shutdown for units so equipped.
T/D Stop (min) 5 min minimum
14) Place unit in automatic operation mode.
Operator Initials
Comments on Unsatisfactory Conditions and Actions Taken
Test Results: NFPA 110 requires that generator sets in Level 1 or Level 2 service shall be exercised at least once monthly, for a minimum of 30 minutes under operating temperature conditions or at not less than 30% of the nameplate rating. We o were o were not able to "cold start" the unit and operate it for at least 30 minutes. We o were o were not able to achieve the 30% minimum load requirement during this test with available loads. The transfer switch(es) o were o were not electrically operated from the normal/standard position to the alternate position and then returned to to the normal/standard positon. Additional testing and/or repairs may be necessary to ensure compliance with NFPA 110.
Signature: