Attachment 7- RTOP Example.docx
DOCX document 35 KB Posted
- Attached to
- Generator Maintenance
- Solicitation number
- 1232SA26Q0395
About this file
This file is a sample Request for Task Order Proposal (RTOP) template for construction services under the USDA Agricultural Research Service (ARS). The template is designed for issuing task orders against an existing contract vehicle (referenced as 12305B24DXXXX in the example). The RTOP example pertains to Generator Maintenance work at a USDA ARS facility and includes standardized sections for the requisition number, issue date, work location, site visit scheduling, and closing date/time for proposal submission. Responses must be rounded to the nearest dollar with no cents included, and proposals remain valid for thirty calendar days from submission.
The template incorporates five key attachments: a Performance Work Statement detailing the specific work requirements, a Wage Determination establishing prevailing wage requirements based on geographic location and construction type, Additional Task Order Specific Terms and Conditions, and Drawings and Specifications. Offerors must comply with instructions contained in the base contract paragraph C.2, and responses should address all items within the RTOP by the stated closing deadline. The template provides contact information fields for the assigned Contract Specialist and Task Order Contracting Officer (TOCO) for questions or clarifications. As a template document, this file serves as a standardized format guide rather than an active solicitation with specific performance requirements or deadlines.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sample Request for Task Order Proposal (RTOP)
Request for Task Order Proposal RTOP Requisition Number: XXXXXX
Date of Issue: XX Month 20XX
| Description of Requirement: {INSERT GENERAL DESCRIPTION} Location of Work: | {INSERT GEOGRAPHIC LOCATION} | |
| Site Visit: | XX Month 20XX at 1:00 pm (CST/CDT) Closing Date/Time: | XX Month 20XX at 1:00 pm (CST/CDT) |
This is a Request for Task Order Proposal (RTOP) for construction to be provided under 12305B24DXXXX contract vehicle. The USDA ARS BARC, {INSERT INSTALLATION LOCATION} has a requirement for Generator Maintenance.
Attached are all related documents for this RTOP. Please ensure that you have read the attached documents, to include specific response submission instructions that are included in this RTOP, and then submit your response by the date and time indicated above.
The Government will hold a site visit if needed for this requirement.
(ROUND PROPOSAL PRICE TO THE NEAREST DOLLAR AMOUNT, DO NOT PROVIDE CENTS)
Applicable Wage Determination will be incorporated per Task Order.
General Decision Number {NCXXXXX} dated {Date} State: {Insert State Name}, Building Type: {Insert Construction WD Type, Building, Commercial, Heavy} County: {Insert County Name}, applies to this task order.
All items within the RTOP must be completed and returned by closing due date and time. In addition to this letter, this RTOP includes the following exhibits:
· Attachment 1 – Performance Work Statement
· Attachment 2 – Wage Determination
· Attachment 3 – Additional Task Order Specific Terms and Conditions
· Attachment 4 – Drawings and Specifications Your response must be in full compliance with the RTOP instructions in base contract 12332SA26XXXX Paragraph C.2. The response (to include price) shall be valid for thirty (30) calendar days. If you have any questions, please contact {INSERT ASSIGNED CONTRACT SPECIALIST’S NAME} Contract Specialist at {INSERT TELEPHONE NUMBER AND E-MAIL ADDRESS} or the undersigned at {INSERT TELEPHONE NUMBER AND E-MAIL ADDRESS OF TOCO}.
{INSERT TOCO NAME}
Task Order Contracting Officer
ATTACHMENT 1 STATMENT OF WORK
{INSERT TASK ORDER SOW HERE}
ATTACHMENT 2
Additional Task Order Specific Terms and Conditions
{INSERT ADDITIONAL TASK ORDER SPECIFIC TERMS AND CONDITIONS HERE}
ATTACHMENT 3 DRAWINGS AND SPECIFICATIONS
{INSERT OR ATTACH SEPERATLY CONCEPT DRAWINGS, CURRENT AS-BUILT DRAWINGS AND CURRENT AS-BUILT SPECIFICATIONS HERE}
Drawings do NOT have to be uploaded to this word document for the RTOP.
File details come from the government source that posted it. Updated .