This document is the NFPA 110 2010 Edition Chapter 8 regarding the routine maintenance and operational testing program for emergency power supply systems (EPSS). The chapter outlines the requirements for maintaining EPSS to ensure they are capable of supplying service within the specified time and duration. It covers the required instruction manuals, special tools, and spare parts that must be available, as well as the maintenance and testing program that must be established. This includes weekly inspections, monthly load testing, annual circuit breaker exercises, and a 36-month full-duration test. The program must be overseen by a properly instructed individual.
The document does not contain information about a specific state or local contract opportunity. It is a technical standard providing guidelines for the maintenance and testing of EPSS equipment to ensure reliability in emergency situations.
View the file
Other versions and copies of NFPA 110
Show all 20
Who attaches NFPA 110
| State | Files |
|---|---|
| Massachusetts | 1 |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7.13.4.6 Items (1) through (4) shall be made available to the authority having jurisdiction at the time of the acceptance test:
(1) Evidence of the prototype test as specified in 5.2.1.2 (for Level 1 systems)
(2) A certified analysis as specified in 5.6.10.2
(3) A letter of compliance as specified in 5.6.10.5
(4) Amanufacturer’s certification of a rated load test at rated power factor with the ambient temperature, altitude, and fuel grade recorded
Chapter 8 Routine Maintenance and Operational Testing
8.1* General.
8.1.1 The routine maintenance and operational testing pro-
gram shall be based on all of the following:
(1) Manufacturer’s recommendations
(2) Instruction manuals
(3) Minimum requirements of this chapter
(4) The authority having jurisdiction
8.1.2 Consideration shall be given to temporarily providing a portable or alternate source whenever the emergency generator is out of service.
8.2* Manuals, Special Tools, and Spare Parts.
8.2.1 At least two sets of instruction manuals for all major com-ponents of the EPSS shall be supplied by the manufacturer(s) of the EPSS and shall contain the following:
(1) A detailed explanation of the operation of the system
(2) Instructions for routine maintenance
(3) Detailed instructions for repair of the EPS and other ma-jor components of the EPSS
(4) An illustrated parts list and part numbers
(5) Illustrated and schematic drawings of electrical wiring sys-tems, including operating and safety devices, control pan-els, instrumentation, and annunciators
8.2.2 For Level 1 systems, instructionmanuals shall be kept in a secure, convenient location, one set near the equipment, and the other set in a separate location.
8.2.3 Special tools and testing devices necessary for routine maintenance shall be available for use when needed.
8.2.4 Replacement for parts identified by experience as high
mortality items shall be maintained in a secure location(s) on the premises.
8.2.4.1 Consideration shall be given to stocking spare parts as recommended by the manufacturer.
8.3 Maintenance and Operational Testing.
8.3.1* The EPSS shall be maintained to ensure to a reasonable degree that the system is capable of supplying service within the time specified for the type and for the time duration specified for the class.
8.3.2 A routine maintenance and operational testing pro-
gram shall be initiated immediately after the EPSS has passed acceptance tests or after completion of repairs that impact the operational reliability of the system.
8.3.2.1 The operational test shall be initiated at an ATS and shall include testing of each EPSS component on which mainte-nance or repair has been performed, including the transfer of each automatic and manual transfer switch to the alternate power source, for a period of not less than 30 minutes under operating temperature.
8.3.3 Awritten schedule for routine maintenance and opera-
tional testing of the EPSS shall be established.
8.3.4 A permanent record of the EPSS inspections, tests, exer-cising, operation, and repairs shall be maintained and readily available.
8.3.4.1 The permanent record shall include the following:
(1) The date of the maintenance report
(2) Identification of the servicing personnel
(3) Notation of any unsatisfactory condition and the correc-tive action taken, including parts replaced
(4) Testing of any repair for the time as recommended by the manufacturer
8.3.5* Transfer switches shall be subjected to amaintenance and testing program that includes all of the following operations:
(1) Checking of connections
(2) Inspection or testing for evidence of overheating and ex-cessive contact erosion
(3) Removal of dust and dirt
(4) Replacement of contacts when required
8.3.6 Paralleling gear shall be subject to an inspection, test-ing, and maintenance program that includes all of the follow-ing operations:
(1) Checking of connections
(2) Inspection or testing for evidence of overheating and ex-cessive contact erosion
(3) Removal of dust and dirt
(4) Replacement of contacts when required
8.3.7* Storage batteries, including electrolyte levels or battery voltage, used in connection with systems shall be inspected weekly and maintained in full compliance with manufacturer’s specifications.
8.3.7.1 Maintenance of lead-acid batteries shall include the
monthly testing and recording of electrolyte specific gravity. Bat-tery conductance testing shall be permitted in lieu of the testing of specific gravity when applicable or warranted.
8.3.7.2 Defective batteries shall be replaced immediately
upon discovery of defects.
8.3.8 A fuel quality test shall be performed at least annually using tests approved by ASTM standards.
8.4 Operational Inspection and Testing.
8.4.1* EPSSs, including all appurtenant components, shall be inspected weekly and exercised under load at least monthly.
8.4.1.1 If the generator set is used for standby power or for peak load shaving, such use shall be recorded and shall be permitted to be substituted for scheduled operations and testing of the gen-erator set, providing the same record as required by 8.3.4.
110–19ROUTINE MAINTENANCE AND OPERATIONAL TESTING
2010 Edition
8.4.2* Diesel generator sets in service shall be exercised at least once monthly, for a minimum of 30 minutes, using one of the following methods:
(1) Loading that maintains the minimum exhaust gas tem-peratures as recommended by the manufacturer
(2) Under operating temperature conditions and at not less than 30 percent of the EPS nameplate kW rating
8.4.2.1 The date and time of day for required testing shall be decided by the owner, based on facility operations.
8.4.2.2 Equivalent loads used for testing shall be automati-
cally replaced with the emergency loads in case of failure of the primary source.
8.4.2.3 Diesel-powered EPS installations that do not meet the requirements of 8.4.2 shall be exercised monthly with the avail-able EPSS load and shall be exercised annually with supplemen-tal loads at not less than 50 percent of the EPS nameplate kW rating for 30 continuous minutes and at not less than 75 percent of the EPS nameplate kW rating for 1 continuous hour for a total test duration of not less than 1.5 continuous hours.
8.4.2.4 Spark-ignited generator sets shall be exercised at least once a month with the available EPSS load for 30 minutes or until the water temperature and the oil pressure have stabilized.
8.4.2.4.1 The date and time of day for required testing shall be decided by the owner, based on facility operations.
8.4.2.4.2 Equivalent loads used for testing shall be automati-cally replaced with the emergency loads in case of failure of the primary source.
8.4.3 The EPS test shall be initiated by simulating a power out-age using the test switch(es) on theATSs or by opening a normal breaker. Opening a normal breaker shall not be required.
8.4.4 Load tests of generator sets shall include complete cold starts.
8.4.5 Time delays shall be set as follows:
(1) Time delay on start:
(a) 1 second minimum
(b) 0.5 second minimum for gas turbine units
(2) Timedelay on transfer to emergency: nominimumrequired
(3) Time delay on restoration to normal: 5 minutes minimum
(4) Time delay on shutdown: 5 minutes minimum
8.4.6 Transfer switches shall be operated monthly.
8.4.6.1 The monthly test of a transfer switch shall consist of electrically operating the transfer switch from the standard posi-tion to the alternate position and then a return to the standard position.
8.4.7* EPSS circuit breakers for Level 1 system usage, including main and feed breakers between the EPS and the transfer switch load terminals, shall be exercised annually with the EPS in the “off” position.
8.4.7.1 Circuit breakers rated in excess of 600 volts for Level 1 system usage shall be exercised every 6 months and shall be tested under simulated overload conditions every 2 years.
8.4.8 The routine maintenance and operational testing pro-
gram shall be overseen by a properly instructed individual.
8.4.9* Level 1 EPSS shall be tested at least once within every 36 months.
8.4.9.1 Level 1 EPSS shall be tested continuously for the du-ration of its assigned class (see Section 4.2).
8.4.9.2 Where the assigned class is greater than 4 hours, it shall be permitted to terminate the test after 4 continuous hours.
8.4.9.3 The test shall be initiated by operating at least one trans-fer switch test function and then by operating the test function of all remainingATSs, or initiated by opening all switches or break-ers supplying normal power to all ATSs that are part of the EPSS being tested.
8.4.9.4 A power interruption to non-EPSS loads shall not be
required.
8.4.9.5 Theminimum load for this test shall be as specified in 8.4.9.5.1, 8.4.9.5.2, or 8.4.9.5.3.
8.4.9.5.1 For a diesel-powered EPS, loading shall be not less than 30 percent of the nameplate kWrating of the EPS.Asupple-mental load bank shall be permitted to be used to meet or ex-ceed the 30 percent requirement.
8.4.9.5.2 For a diesel-powered EPS, loading shall be that which maintains the minimum exhaust gas temperatures as recom-mended by the manufacturer.
8.4.9.5.3 For spark-ignited EPSs, loading shall be the available EPSS load.
8.4.9.6 The test required in 8.4.9 shall be permitted to be
combined with one of the monthly tests required by 8.4.2 and one of the annual tests required by 8.4.2.3 as a single test.
8.4.9.7 Where the test required in 8.4.9 is combined with the annual load bank test, the first 3 hours shall be at not less than the minimum loading required by 8.4.9.5 and the remaining hour shall be at not less than 75 percent of the nameplate kW rating of the EPS.
Annex A Explanatory Material
AnnexAis not a part of the requirements of this NFPAdocument but is included for informational purposes only. This annex contains explana-tory material, numbered to correspond with the applicable text paragraphs.
A.1.1.4 See NFPA 111, Standard on Stored Electrical Energy Emer-gency and Standby Power Systems.
A.1.1.5(3) See Chapter 4.
A.3.2.1 Approved. The National Fire Protection Association does not approve, inspect, or certify any installations, proce-dures, equipment, or materials; nor does it approve or evalu-ate testing laboratories. In determining the acceptability of installations, procedures, equipment, or materials, the author-ity having jurisdiction may base acceptance on compliance with NFPA or other appropriate standards. In the absence of such standards, said authority may require evidence of proper installation, procedure, or use. The authority having jurisdic-tion may also refer to the listings or labeling practices of an organization that is concerned with product evaluations and is thus in a position to determine compliance with appropriate standards for the current production of listed items.
A.3.2.2 Authority Having Jurisdiction (AHJ). The phrase “au-thority having jurisdiction,” or its acronym AHJ, is used in NFPA documents in a broad manner, since jurisdictions and approval agencies vary, as do their responsibilities.Where pub-lic safety is primary, the authority having jurisdiction may be a