This document is a solicitation amendment for a federal contract opportunity to repair the Command Post in Building 2300 at Davis-Monthan Air Force Base. The amendment incorporates Request for Information responses, a Site Visit Sign In Sheet, and an updated Wage Determination. Key details include:
The project will renovate the Command Post to increase functionality, performance, and quality of life for staff. It is a 100% set-aside for Women-Owned Small Businesses, with a NAICS code of 236220 and a size standard of $45 Million. The project magnitude is between $1,000,000 and $3,500,000, with a Period of Performance of 330 Calendar Days. A 20% Bid Bond is required. The solicitation includes a site visit on 26 July 2024 and a bid due date of 08 August 2024. Bids must be hand delivered or mailed to the 355th Contracting Squadron.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12. Site Visit Sign In.pdf | ||
| 09. Davis-Bacon Act WD # AZ20240040 (Rev 7.19.24).pdf | ||
| 11. RFI Answers - Command Post Renovation - FA487724B0002.pdf | ||
| Solicitation - FA487724B0002.pdf | ||
| 02. FBNV230009_Specifications.pdf | ||
| 03. FBNV230009_Form 66.xlsx | XLSX spreadsheet | |
| 07. 355 CS Base Design Guide 2021.pdf | ||
| 09. Wage Determination - AZ20240040.pdf | ||
| 08. Template of Contractor EAL.xlsx | XLSX spreadsheet | |
| 01. FBNV230009_Drawings.pdf | ||
| 06. Contractor Environmental Guide_ Oct 21.pdf | ||
| 10. Section B - Price Fill-In.pdf | ||
| 04. FBNV230009_Schedule of Items (Blank).docx | DOCX document | |
| 05. FBNV230009_AF Form 3052 (Blank).xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section J - List of Attachments
Miscellaneous text in this section has been modified to:
01. FBNV230009_Drawings
02. FBNV230009_Specifications
03. FBNV230009_Form 66
04. FBNV230009_Schedule of Items (Blank)
05. FBNV230009_AF Form 3052 (Blank)
06. Contractor Environmental Guide_ Oct 21
07. 355 CS Base Design Guide 2021
08. Template of Contractor EAL
09. Davis-Bacon Act WD # AZ20240040 (Rev 7.19.24)
10. Section B - Price Fill-In
11. RFI Answers - Command Post Renovation - FA487724B0002
12. Site Visit Sign In
FA487724B00020001
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0001 |
| EffDate: 01 Aug 2024 |
| ReqNo: |
| ProjNo: FBNV 230009 |
| IssCode: FA4877 |
| AdmCode: |
| IssuedBy: FA4877 355 CONS PK |
3180 S CRAYCROFT RD BLDG 2525, CP 520 228 3131
DAVIS MONTHAN AFB, AZ 85707-3522
UNITED STATES
JOSHUA RODRIGUEZ, Email: joshua.rodriguez.30@us.af.mil Telephone: 520-228-4838 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA487724B0002 |
| SolDate: 09 Jul 2024 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is to incorporate Request for Information responses, Site Visit Sign In Sheet, and updated Wage Determination dated 17 July 2024. |
Please note that as referenced in RFI answer #17, pricing for bid alternate #1, which is referenced throughout the drawings and specifications, shall be included in the contractor's total price. This clarification emphasizes that bid alternate #1 is a part of the base item and its pricing shall be included accordingly.
| ContNameTitle: |
| CoNameTitle: Joshua Drawdy |
| ContDate: |
| CODate: 01 Aug 2024 |