WORK_DIRECTIVE_CHANGE.pdf

PDF 48 KB Posted

Attached to
CFD Training Facility Project
Solicitation number
IFB-2025-037
Issued by
Hamilton County, Indiana

About this file

This document is a Work Directive Change template for the City of Carmel, specifically designed for the Board of Public Works and Safety to authorize modifications to an existing project. The template provides a structured form for documenting changes to a project, including specification and drawing references, a description of the work to be completed, and the reason for the change order. It includes designated spaces for the project name, project number, and details about the proposed work directive change.

The template outlines the authorization process for the work change, indicating that a future Contract Change Order will be issued to cover the modifications. The document requires signatures from the Owner's Representative and approval from key City of Carmel officials, including the Presiding Officer, Board Members, and City Engineer. The form allows for adjustments to the project completion date and provides a mechanism for documenting and approving incremental changes to the original project scope, ensuring formal documentation and municipal oversight of project modifications.

View the file

Other files

File Type Posted
CFD_Training_Facility_Project.pdf PDF
ERECTION_DRAWING_E19.pdf PDF
ERECTION_DRAWING_E4.pdf PDF
ERECTION_DRAWING_E8.pdf PDF
ERECTION_DRAWING_E1.pdf PDF
ERECTION_DRAWING_E10.pdf PDF
ERECTION_DRAWING_E11.pdf PDF
ERECTION_DRAWING_E15.pdf PDF
ERECTION_DRAWING_E17.pdf PDF
ERECTION_DRAWING_E20.pdf PDF
ERECTION_DRAWING_E5.pdf PDF
ERECTION_DRAWING_E7.pdf PDF
ERECTION_DRAWING_E12.pdf PDF
ERECTION_DRAWING_E14.pdf PDF
ERECTION_DRAWING_E16.pdf PDF
ERECTION_DRAWING_E18.pdf PDF
ERECTION_DRAWING_E2.pdf PDF
ERECTION_DRAWING_E3.pdf PDF
ERECTION_DRAWING_E6.pdf PDF
ERECTION_DRAWING_E9.pdf PDF
ERECTION_DRAWING_E13.pdf PDF
CFD_CTC_Close_Up.png PNG image
CFD_CTC_Training_Tower_Location.png PNG image
CFD_CTC_Whole_Parcel-1.png PNG image
6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx DOCX document
MAINTENANCE_BOND.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
FIELD_ORDER.pdf PDF
PERFORMANCE_BOND.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
MANUFACTURERS_LIST.pdf PDF
PAYMENT_BOND.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SUBCONTRACTORS_LIST.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF CARMEL

TO: WORK DIRECTIVE CHANGE NO.______________

DATE: ______________________________________

PROJECT NAME:_____________________________

PROJECT NO.: _______________________________

Specification Reference

Drawing Reference:

DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:

REASON FOR THIS ORDER:

AUTHORIZATION:

THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS

OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.

PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.

By:_______________________________ Approved By:

Owner’s Representative

CITY OF CARMEL

BOARD OF PUBLIC

WORKS AND SAFETY

By:__________________________

Laura Campbell, Presiding Officer

By:__________________________ James Barlow, Member

By:__________________________ Alan Potasnik, Member

By:__________________________ Brad Pease, PE, City Engineer

DATE:_______________________

ATTEST:

DATE:_______________________

Jacob Quinn, Clerk

Version 2024-09-23