ERECTION_DRAWING_E20.pdf
PDF 495 KB Posted
- Attached to
- CFD Training Facility Project
- Solicitation number
- IFB-2025-037
- Issued by
- Hamilton County, Indiana
About this file
The document is a Tekla Structures 3D architectural design drawing for the Carmel Fire Training project, issued for approval on 10/13/2025. The drawing provides two detailed 3D views of a multi-story building, likely a fire training facility, featuring a rectangular structure with multiple floors, exterior fire escape stairs, and a flat roof with perimeter railings. The technical drawing shows the building from two different perspectives, highlighting its structural details, window placements, stair configurations, and overall architectural layout. The drawing is labeled with project identification information including the job number E20 and the date of creation.
The technical drawing does not contain specific pricing, funding, or contractual details. It appears to be a preliminary or detailed design rendering focused on the architectural visualization of the Carmel Fire Training facility, showing the building's comprehensive structural design using Tekla Structures software. The 3D views provide a comprehensive look at the building's exterior, demonstrating the placement of windows, stairs, and structural elements from different angles to give a complete understanding of the proposed building's design and layout.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Te kl a st ru ct ur es
10/13/2025A ISSUED FOR APPROVAL
REV DESCRIPTION DATE
DESCRIPTION
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
3D VIEW
CARMEL FIRE TRAINING
ABC
10/13/2025 - E20
3D VIEW
3D VIEW
File details come from the government source that posted it. Updated .