ERECTION_DRAWING_E9.pdf
PDF 66 KB Posted
- Attached to
- CFD Training Facility Project
- Solicitation number
- IFB-2025-037
- Issued by
- Hamilton County, Indiana
About this file
This document is a Tekla Structures elevation drawing for the Carmel Fire Training project, drawn on 10/10/2025 with revision A issued for approval on 10/13/2025. The detailed architectural elevation blueprint shows a multi-story building with five distinct floor levels, ranging from ground floor to 5th floor, with precise measurements and structural details. The elevation drawing includes specific architectural elements such as doors, structural steel sections (HSS4X2X1/8), pipe specifications (PIPE1-1/4SCH40), and precise height measurements for each floor level, with total building height reaching 47'-6".
The technical drawing provides comprehensive structural information including continuous outer and inner measurements, door placements, and floor-to-floor heights. Specific architectural components are annotated with codes like FR6, HMD5, and GR6, indicating different structural or architectural elements. The drawing uses a grid system for precise positioning and includes detailed dimensional notations for each floor, showing meticulous planning for the fire training facility's architectural and structural design.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10/13/2025A ISSUED FOR APPROVAL
REV DESCRIPTION DATE
Te kl a st ru ct ur es
DESCRIPTION
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
ELEVATION
CARMEL FIRE TRAINING
ABC
10/10/2025 - E9
3 - 3 E1
EL.+9'-6"
EL.+28'-6"
EL.+19'-0"
EL.+38'-0"
EL.+0"
EL.+47'-6"
CONT. OUTER TO OUTER CONT. OUTER TO OUTER
CONT. OUTER TO OUTER
CONT. OUTER TO OUTER
CONT. INNER TO INNER
CONT. OUTER TO OUTER
CONT. OUTER TO OUTERCONT. OUTER TO OUTERCONT. OUTER TO OUTERCONT. OUTER TO OUTER
CONT. INNER TO INNER
9' -6
FR6
HSS4X2X18/
DOOR
18'-0
FR6
HSS4X2X18/
HMD6
HSS4X2X18/
7' -0
8'-0
DOOR
HMD5
HSS4X2X18/
DOOR
HMD5
HSS4X2X18/
DOOR
3'-0
HMD6
HSS4X2X18/
16'-812/
14'-1014/
3' -6
9' -6
'-6
2' -2
40'-0
DOOR
GR19
PIPE1-14/ SCH40
2ND FLOOR
7' -0
22'-1034/
4TH FLOOR
HMD5
HSS4X2X18/
FR6
HSS4X2X18/
212/
DOOR
FR6
HSS4X2X18/
DOOR
3'-0
16'-812/
3'-0
212/
40'-0
8'-0
7' -0
312/
8'-634/
DOOR
3'-0
7' -0
HMD5
HSS4X2X18/
3RD FLOOR
FR6
HSS4X2X18/
39'-5
9'
-6
5TH FLOOR
6'-0
312/
FR6
HSS4X2X18/
DOOR
DOOR
DOOR
DOOR
DOOR
DOOR
GR6
PIPE1-14/ SCH40
FR2
HSS4X2X18/
HMD1
HSS4X2X18/
1ST FLOOR
GROUND FL
8'-0
1'-134/3'-0
3'-0
7' -0
3' -6
9' -6
9' -6
8' -1
4 22
8'-08'-08'-08'-0
2' -2
7' -0
1014/29'-1014/2'-812/
7'-8
2' -2
7' -0
2'
-2
2' -2
2' -2
8'-0
1'-1112/
312/ 2312/
File details come from the government source that posted it. Updated .