ERECTION_DRAWING_E17.pdf

PDF 97 KB Posted

Attached to
CFD Training Facility Project
Solicitation number
IFB-2025-037
Issued by
Hamilton County, Indiana

About this file

The document is a Tekla Structures stair elevation technical drawing for the Carmel Fire Training facility, issued for approval on 10/13/2025. The detailed architectural blueprint depicts a multi-story staircase structure spanning five floors, with precise measurements and elevation details from ground level (EL. +0") to the top floor at EL. +47'-6". The drawing includes specific structural components such as steel channels (CH3, CH1), pipes (PIPE1-1/4 SCH40/SCH80), steel plates (EP1 PL), and structural steel sections (ST1 C10X15.3).

The technical drawing provides a comprehensive vertical representation of the stair system, with meticulous annotations of floor-to-floor heights, structural member specifications, and dimensional relationships. Each floor level is precisely marked, showing consistent floor-to-floor heights and the arrangement of structural elements. The drawing appears to be a critical component of the architectural and structural design for the Carmel Fire Training facility, offering engineers and construction professionals a detailed guide for stair construction and structural integration.

View the file

Other files

File Type Posted
CFD_Training_Facility_Project.pdf PDF
ERECTION_DRAWING_E1.pdf PDF
ERECTION_DRAWING_E10.pdf PDF
ERECTION_DRAWING_E11.pdf PDF
ERECTION_DRAWING_E15.pdf PDF
ERECTION_DRAWING_E20.pdf PDF
ERECTION_DRAWING_E5.pdf PDF
ERECTION_DRAWING_E7.pdf PDF
ERECTION_DRAWING_E19.pdf PDF
ERECTION_DRAWING_E4.pdf PDF
ERECTION_DRAWING_E8.pdf PDF
ERECTION_DRAWING_E12.pdf PDF
ERECTION_DRAWING_E14.pdf PDF
ERECTION_DRAWING_E16.pdf PDF
ERECTION_DRAWING_E18.pdf PDF
ERECTION_DRAWING_E2.pdf PDF
ERECTION_DRAWING_E3.pdf PDF
ERECTION_DRAWING_E6.pdf PDF
ERECTION_DRAWING_E9.pdf PDF
ERECTION_DRAWING_E13.pdf PDF
CFD_CTC_Training_Tower_Location.png PNG image
CFD_CTC_Whole_Parcel-1.png PNG image
CFD_CTC_Close_Up.png PNG image
CONTRACT_CHANGE_ORDER.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx DOCX document
MAINTENANCE_BOND.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
FIELD_ORDER.pdf PDF
PERFORMANCE_BOND.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
MANUFACTURERS_LIST.pdf PDF
PAYMENT_BOND.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SUBCONTRACTORS_LIST.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Te kl a st ru ct ur es

10/13/2025A ISSUED FOR APPROVAL

REV DESCRIPTION DATE

DESCRIPTION

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

STAIR ELEVATION

CARMEL FIRE TRAINING

ABC

10/10/2025 - E17

18 - 18 E15

17 - 17 E15

EL.+0"

EL.+47'-6"

EL.+38'-0"

EL.+9'-6"

EL.+28'-6"

EL.+19'-0"

EL.+9'-6"

EL.+38'-0"

EL.+28'-6"

EL.+0"

EL.+19'-0"

EL.+47'-6"

CH3

C4X5.4

EP1

L3X2X14/

3'-912/

2516/

CH3

C4X5.4

434/

7116/

CH3

C4X5.4

CH3

C4X5.4

GR15

PIPE1-14/ SCH40

CH1

C4X5.4

EP1

PL38/ "X7

EP1

PL38/ "X7

3' -6

2'-818/

PIPE1-14/ SCH40

CH1

C4X5.4

2'-1058/

3'-912/

EP1

PL38/ "X7

'-6

EP1

PL38/ "X7

ST1

C10X15.3

434/

4'-03'-314/

1' -9

ST1

C10X15.3

GR13

EP1

PL38/ "X7

ST1

C10X15.3

CH1

C4X5.4

3'-51116/

GR17

1' -9

GR12

PIPE1-14/ SCH40

GR12

PIPE1-14/ SCH40

1' -9

GR14

PIPE1-14/ SCH80

GR14

PIPE1-14/ SCH80

814/

3'-8316/

3' -6

1ST FLOOR

GR11

PIPE1-14/ SCH40

1' -9

3' -6

2ND FLOOR

GROUND FL.

1' -9

3'-912/

ST1

C10X15.3

GR11

PIPE1-14/ SCH40

2516/

3RD FLOOR

4TH FLOOR

5TH FLOOR

8'-0

41316/ 2'-1058/ 7116/

1' -9

1' -9

1' -9

3' -6

1' -9

1' -9

1' -9

2 858/ 2'-1058/

3' -6

1' -9

1' -9

1' -9

858/3'-51116/

1' -9

2516/

4'-03'-314/434/

3'-8316/

9' -6

9' -6

9' -6

9' -6

9' -6

5TH FLOOR

ST1

C10X15.3

2516/

CH1

C4X5.4

CH1

C4X5.4

7116/

CH3

C4X5.4

ST1

C10X15.3

ST1

C10X15.3

CH3

C4X5.4

3' -6

CH3

C4X5.4

GR12

PIPE1-14/ SCH40

4'-0

7116/

9' -6

9' -6

GR17

PIPE1-14/ SCH40

4'-0

838/

3'-912/

1' -9

3'-8316/2516/

9' -6

GR11

PIPE1-14/ SCH40

434/ 4'-0

3'-912/

2'-1058/

3RD FLOOR

3'-912/

1ST FLOOR

2'-8

3'-8316/

3'-8316/

GR11

PIPE1-14/ SCH40

4TH FLOOR

2'-1058/

GR13

PIPE1-14/ SCH80

GR14

PIPE1-14/ SCH40

ST1

C10X15.3

3'-314/

GR12

PIPE1-14/ SCH80

CH3

C4X5.4

CH3

C4X5.4

GROUND FL.

GR14

PIPE1-14/ SCH40

3' -6

EP1

PL38/ "X7

CH3

C4X5.4

EP1

PL38/ "X7

EP1

PL38/ "X7EP1

PL38/ "X7

858/

2ND FLOOR

9' -6

9' -6

1' -9

1' -9

3' -6

858/3'-51116/

2'-8

3' -6

1' -9

1' -9

3'-314/434/

3'-314/

1' -9

1' -9

1' -9

3'-51116/

838/

4'-358/2'-8838/

2516/

434/

3' -6

1' -9

1' -9

'-6

File details come from the government source that posted it. Updated .