ERECTION_DRAWING_E8.pdf

PDF 73 KB Posted

Attached to
CFD Training Facility Project
Solicitation number
IFB-2025-037
Issued by
Hamilton County, Indiana

About this file

The document is a Tekla Structures elevation drawing for the Carmel Fire Training project, issued for approval on 10/13/2025. The drawing provides a detailed cross-sectional view of a multi-story building, showing five distinct floor levels with specific architectural and structural details. The elevation drawing includes precise measurements for each floor, ranging from ground level to the top floor at EL.+47'-6", with various structural elements like doors, pipes (SCH40 and SCH80), and steel sections (HSS, C-channel) annotated throughout the design.

The drawing uses a grid system to map out the structural components, with notations for different materials and specifications at each level. The floors appear to be designed with consistent heights and similar structural approaches, suggesting a standardized construction method. The document is specifically labeled as drawing number E8, created on 10/10/2025, and is part of a set of technical drawings for what seems to be a fire training facility. The level of detail indicates this is a technical, engineering-focused document used for construction planning and architectural visualization.

View the file

Other files

File Type Posted
CFD_Training_Facility_Project.pdf PDF
ERECTION_DRAWING_E1.pdf PDF
ERECTION_DRAWING_E10.pdf PDF
ERECTION_DRAWING_E11.pdf PDF
ERECTION_DRAWING_E15.pdf PDF
ERECTION_DRAWING_E17.pdf PDF
ERECTION_DRAWING_E20.pdf PDF
ERECTION_DRAWING_E5.pdf PDF
ERECTION_DRAWING_E7.pdf PDF
ERECTION_DRAWING_E19.pdf PDF
ERECTION_DRAWING_E4.pdf PDF
ERECTION_DRAWING_E12.pdf PDF
ERECTION_DRAWING_E14.pdf PDF
ERECTION_DRAWING_E16.pdf PDF
ERECTION_DRAWING_E18.pdf PDF
ERECTION_DRAWING_E2.pdf PDF
ERECTION_DRAWING_E3.pdf PDF
ERECTION_DRAWING_E6.pdf PDF
ERECTION_DRAWING_E9.pdf PDF
ERECTION_DRAWING_E13.pdf PDF
CFD_CTC_Training_Tower_Location.png PNG image
CFD_CTC_Whole_Parcel-1.png PNG image
CFD_CTC_Close_Up.png PNG image
CONTRACT_CHANGE_ORDER.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx DOCX document
MAINTENANCE_BOND.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
FIELD_ORDER.pdf PDF
PERFORMANCE_BOND.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
MANUFACTURERS_LIST.pdf PDF
PAYMENT_BOND.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SUBCONTRACTORS_LIST.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Te kl a st ru ct ur es

10/13/2025A ISSUED FOR APPROVAL

REV DESCRIPTION DATE

DESCRIPTION

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

ELEVATION

CARMEL FIRE TRAINING

ABC

10/10/2025 - E8

2 - 2 E1

EL.+47'-6"

EL.+19'-0"

EL.+0"

EL.+9'-6"

EL.+28'-6"

EL.+38'-0"

CONT. OUTER TO OUTER CONT. OUTER TO OUTERCONT. OUTER TO OUTER CONT. OUTER TO OUTERCONT. OUTER TO OUTER 8'-0

112/

2' -2

GR7

PIPE1-14/ SCH80

9' -6

DOOR

3'-0

212/

3' -6

1ST FLOOR

HMD5

HSS4X2X18/

9' -6

GR5

PIPE1-14/ SCH40

8'-0

DOOR

DOOR

8'-634/

8'-0

3'-0

2'-1058/

CH1

C4X5.4

558/

DOOR

8' -1

0 7'-8

312/

DOOR

HMD6

HSS4X2X18/

7' -0

GR8

PIPE1-14/ SCH40

DOOR

2' -2

FR6

HSS4X2X18/

9' -6

EP1

PL38/ "X7

HMD5

HSS4X2X18/

DOOR

41316/

8'-0

2' -2

HMD6

HSS4X2X18/

14'-1014/

8'-0

2ND FLOOR

3RD FLOOR

212/

'-6

FR6

HSS4X2X18/

GROUND FL

4TH FLOOR

8'-0

9' -6

8'-0

7' -0

29'-1014/

GR7

PIPE1-14/ SCH40

HMD5

HSS4X2X18/

GR9

PIPE1-14/ SCH40

3'-5716/

DOOR

7' -0

GR1

PIPE1-14/ SCH40

1014/

3' -6

40'-0

DOOR

5TH FLOOR

DOOR

DOOR

HMD5

HSS4X2X18/

DOOR

1'-1112/

EP1

PL38/ "X7

ST1

C4X5.4

FR6

HSS4X2X18/

FR6

HSS4X2X18/

FR6

HSS4X2X18/

FR6

HSS4X2X18/

GR18

PIPE1-14/ SCH40

8'-0

3' -6

6516/

8' -1

0 2

9' -6

212/

3' -6

3' -6

40'-0

2 312/

3'-03'-017'-812/

7' -0

7' -0

2'

-21014/3'-02'-812/

2'-8

23'-214/3'-0

2' -2

7' -0

File details come from the government source that posted it. Updated .