CONTRACT_CHANGE_REQUEST.pdf
PDF 32 KB Posted
- Attached to
- CFD Training Facility Project
- Solicitation number
- IFB-2025-037
- Issued by
- Hamilton County, Indiana
About this file
This document is a Contract Change Request form from the City of Carmel for an unspecified project. The form provides a template for proposing modifications to an existing contract, with sections to detail the scope of work changes, reasons for the change, potential cost impacts, additional time requirements, and personnel needs. The form is designed to capture comprehensive information about proposed contract alterations, including space for identifying attachments and capturing reviews by relevant parties.
While the specific details of the contract change are not filled in, the form is structured to allow for precise documentation of contract modifications. It includes fields for approximating cost changes, determining if additional contract time is needed, assessing whether additional personnel are required, and providing space for comments and recommendations from the engineer. The form appears to be a standard administrative tool used by the City of Carmel to formally track and approve changes to ongoing contracts or projects.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: CONTRACT CHANGE REQUEST NO.:
DATE:
PROJECT NAME:
FROM:
IT IS REQUESTED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE
REFERENCED CONTRACT.
1. SCOPE OF WORK (USE ADDITIONAL PAGES IF REQUIRED. ALSO LIST OTHER
CONTRACTS INVOLVED.)
2. REASON FOR CHANGE:
3. APPROXIMATE COST CHANGE TO CONTRACT PRICE: _____________________
4. WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE
THE CHANGE IN WORK SCOPE? _____ -YES _____ -NO _____ -(CALENDAR
DAYS)
5. WILL THE CONTRACTOR NEED ADDITIONAL PERSONNEL TO COMPLETE
THE CHANGE IN WORK SCOPE? _____ -YES _____ -NO
IF NO, TRADE(S): _____________________________________
NO. OF PERSONNEL: _________________________________
DURATION: ______________________________________
6. IDENTIFICATION OF ATTACHMENTS:
DATE: _______________________ DATE: ________________________
PREPARED
REVIEWED BY:____________ REVIEWED BY:____________________________
ENGINEER
Comments and Recommendation:
File details come from the government source that posted it. Updated .