The document is a Tekla Structures architectural elevation drawing for the Carmel Fire Training project, dated 10/13/2025. The drawing provides detailed structural specifications for a multi-story building, showing precise measurements and floor elevations from ground level to the 5th floor. The elevation plan includes specific details for structural elements such as doors, pipes (PIPE1-1/4SCH40), steel sections (HSS4X2X1/8), and various floor levels marked at different heights.
The drawing illustrates a comprehensive architectural blueprint with precise technical annotations, including continuous outer and inner measurements, verified in-field (V.I.F.) notations, and specific structural component specifications. The building appears to be a fire training facility with multiple floors, internal stairways, and strategically placed structural supports. The elevation drawing provides a technical cross-section view of the building's structural design, showing floor heights ranging from ground level (EL.+0") to the 5th floor (EL.+47'-6"), with detailed placement of structural members, doors, and other architectural elements.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Te kl a st ru ct ur es
10/13/2025A ISSUED FOR APPROVAL
REV DESCRIPTION DATE
DESCRIPTION
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
ELEVATION
CARMEL FIRE TRAINING
ABC
10/10/2025 - E12
8 - 8 E1
7 - 7 E1
EL.+9'-6"
EL.+38'-0"
EL.+0"
EL.+19'-0"
EL.+28'-6"
EL.+47'-6"
EL.+9'-6"
EL.+38'-0"
EL.+19'-0"
EL.+28'-6"
EL.+0"
EL.+47'-6"
CONT. OUTER TO OUTERCONT. OUTER TO OUTER CONT. OUTER TO OUTER
CONT. INNER TO INNERCONT. INNER TO INNER CONT. INNER TO INNER
CONT. OUTER TO OUTER
CONT. INNER TO INNER
CONT. OUTER TO OUTER
V.I.F.
V.I.F.
CONT. OUTER TO OUTER
V.I.F. V.I.F.
CONT. INNER TO INNER
V.I.F.V.I.F.
3' -6
7' -0
DOOR
9' -6
612/
2' -2
7' -0
FR7
HSS4X2X18/
6'-0
8'-0
7' -0
8'-0
FR7
HSS4X2X18/
GR7
PIPE1-14/ SCH40
DOOR
HMD3
HSS4X2X18/
FR2
HSS4X2X18/
DOOR
FR2
HSS4X2X18/
2' -2
2ND FLOOR
GR8PIPE1- 1
4/ SCH40
8'-0
9' -6
1ST FLOOR
6'-0
7' -0
7'-512/
7' -0
3' -6
ST1C10X15.3
3'-10
DOOR
6'-0
GROUND FL
2' -2
7'-8
2' -2
DOOR
2' -2
HMD3
HSS4X2X18/
DOOR
DOOR
DOOR
4TH FLOOR
3RD FLOOR
3'-0
9'-512/
7'-8
6'-0
2' -2
7'-8
DOOR
7' -0
3' -6
8'-0
2'-8
6'-412/
9' -6
212/
ST1
C10
X15 .3
FR2
HSS4X2X18/
DOOR
7'-8
DOOR
DOOR
DOOR
DOOR
FR7
HSS4X2X18/
GR9
PIP
E1- 1 4/ S
CH40
GR7
PIPE1-14/ SCH40
FR2
HSS4X2X18/
HMD4
HSS4X2X18/
FR6
HSS4X2X18/
PIPE1-14/ SCH40
PIPE1-14/ SCH40
HMD1
HSS4X2X18/
HMD1
HSS4X2X18/
HMD1
HSS4X2X18/
HMD3
HSS4X2X18/
HMD1
HSS4X2X18/
DOOR
DOOR
5TH FLOOR
8'-0
212/
3' -6
2'-43'-0
9' -6
9' -6
'-6
2' -2
7' -0
3'-03'-10
3'-02'-412/
2' -2
7' -0
2 2
5'-102'-0
11'-10
7'
-0
HMD7
HSS4X2X18/
3'-0
3' -6
15'-8
DOOR
PIPE1-14/ SCH40
2' -2
PIPE1-14/ SCH40
7'-8
3RD FLOOR
5TH FLOOR
40'-0
1ST FLOOR
GROUND FL
15'-8
4TH FLOOR
FR7
HSS4X2X18/
'-6
DOOR
2' -2
2ND FLOOR
15'-8
DOOR
DOOR
FR6
HSS4X2X18/
3'-0
HMD3
HSS4X2X18/
9' -6
9' -6
9' -6
9' -6
9' -6
212/
3' -6
212/
11'-1010
7' -0
39'-8
7'-815'-8
File details come from the government source that posted it. Updated .