ERECTION_DRAWING_E16.pdf

PDF 192 KB Posted

Attached to
CFD Training Facility Project
Solicitation number
IFB-2025-037
Issued by
Hamilton County, Indiana

About this file

This document is a Tekla Structures stair elevation technical drawing for the Carmel Fire Training project, drawn on 10/10/2025 and issued for approval on 10/13/2025. The detailed technical drawing provides a comprehensive elevation view of a multi-story staircase, showing precise measurements and structural details across six levels from ground floor to fifth floor. The drawing includes specific technical annotations such as floor elevations (ranging from EL. +0" to EL. +47'-6"), stair component specifications like pipe sizes (1-1/4 SCH40), steel channel dimensions (C4X5.4, C10X15.3), and plate specifications (EP1 PL 3/8"X7).

The technical drawing appears to be part of the design and construction documentation for a fire training facility, with meticulous attention to stair geometry, structural elements, and dimensional precision. The elevation views are symmetrical and show continuous stair runs between floors, with typical (TYP) notations indicating repeating design elements. The drawing provides detailed measurements for nosing, risers, and floor-to-floor heights, suggesting a standardized and carefully engineered stair system designed to meet specific architectural and potentially safety training requirements for the Carmel Fire Training project.

View the file

Other files

File Type Posted
CFD_Training_Facility_Project.pdf PDF
ERECTION_DRAWING_E19.pdf PDF
ERECTION_DRAWING_E4.pdf PDF
ERECTION_DRAWING_E8.pdf PDF
ERECTION_DRAWING_E1.pdf PDF
ERECTION_DRAWING_E10.pdf PDF
ERECTION_DRAWING_E11.pdf PDF
ERECTION_DRAWING_E15.pdf PDF
ERECTION_DRAWING_E17.pdf PDF
ERECTION_DRAWING_E20.pdf PDF
ERECTION_DRAWING_E5.pdf PDF
ERECTION_DRAWING_E7.pdf PDF
ERECTION_DRAWING_E12.pdf PDF
ERECTION_DRAWING_E14.pdf PDF
ERECTION_DRAWING_E18.pdf PDF
ERECTION_DRAWING_E2.pdf PDF
ERECTION_DRAWING_E3.pdf PDF
ERECTION_DRAWING_E6.pdf PDF
ERECTION_DRAWING_E9.pdf PDF
ERECTION_DRAWING_E13.pdf PDF
CFD_CTC_Close_Up.png PNG image
CFD_CTC_Training_Tower_Location.png PNG image
CFD_CTC_Whole_Parcel-1.png PNG image
6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx DOCX document
MAINTENANCE_BOND.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
FIELD_ORDER.pdf PDF
PERFORMANCE_BOND.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
MANUFACTURERS_LIST.pdf PDF
PAYMENT_BOND.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SUBCONTRACTORS_LIST.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Te kl a st ru ct ur es

10/13/2025A ISSUED FOR APPROVAL

REV DESCRIPTION DATE

DESCRIPTION

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

STAIR ELEVATION

CARMEL FIRE TRAINING

ABC

10/10/2025 - E16

16 - 16 E1515 - 15

E15

EL.+47'-6"

EL.+9'-6"

EL.+38'-0"

EL.+0"

EL.+19'-0"

EL.+28'-6"

EL.+47'-6"

EL.+19'-0"

EL.+38'-0"

EL.+9'-6"

EL.+28'-6"

EL.+0"

TY

P

TY

P

CONT. OUTER TO OUTER

CONT. INNER TO INNER

TYP

TYP

TY

P

TYP

TYP

TYP

TY

P

TYP

TY

P

TY

P

TY

P

TYP

4'-

16/ 4'-

16/

3RD FLOOR

914/

EP1

PL38/ "X7

8/ =

9' -6

8/

3'-

3 16/

CH1

C4X5.4

1'-434/

W.P.

NOSING

R

IS

ER

W.P.

8/

TRADE

9' -6

9' -6

1 1 2/

CH3

C4X5.4

5TH FLOOR

8/

1'-434/

NOSING

CH3

C4X5.4

TRADE

CH1

C4X5.4

20'-0

1' -9

ST1

C10X15.3

9' -6

3' -6

4'-512/

3'-

19'-412/

1' -9

15@6=7'-6

GR11

PIPE1-14/ SCH40

8/

'-6

GROUND FL.

GR14

PIPE1-14/ SCH40

EP1

PL38/ "X7

914/

GR11

PIPE1-14/ SCH40

GR14

PIPE1-14/ SCH40

EP1

PL38/ "X7

EP1

PL38/ "X7

ST1

C10X15.3

CH1

C4X5.4

EP1

PL38/ "X7

CH1

C4X5.4

CH1

C4X5.4

R

IS

ER

EP1

PL38/ "X7

1018/

1 1 2/

EP1

PL38/ "X7

4TH FLOOR

2ND FLOOR

1ST FLOOR

3' -6

3' -0

2'-

3 16/

1' -9

1018/

1' -9

3'-

2'-

3 16/

3'-

3 16/

3' -0

15@6=7'-6

4'-512/

9' -6

9' -6

1'-9

8/ =

9' -6

1'-9

3' -6

GR17

PIPE1-14/ SCH40

8/ =

9' -6

4'-

16/

ST1

C10X15.3

8'-0

8/ =

9' -6

1'-11

3' -6

8/

1' -9

NOSING

W.P.

1018/

8/

1' -9

1018/

GR13

PIPE1-14/ SCH40

2'-01316/

W.P.

1'-634/

CH1

C4X5.4

1'-6

15@6=7'-6

NOSING

NOSING

9' -6

3' -6

CH3

C4X5.4

2'-2716/

2'-01316/

2'-112/

1'-11

R

IS

ER

234/

3'-

3 16/

1' -9

3'-0

11 2/

9916/

TRADE

8/ = 9'

-6

CH1

C4X5.4

5TH FLOOR

3RD FLOOR

8/ =

9' -6

1'-634/

CH3

C4X5.4

CH3

C4X5.4

R

IS

ER

3' -6

15@6=7'-6

1 1 2/

ST1

C10X15.3

NOSING

9'

-6

TRADE

NOSING

GR11

PIPE1-14/ SCH40

R

IS

ER

W.P.

ST1

C10X15.3

GR15

PIPE1-14/ SCH40

2'-11 3

2 1 8/

TRADE

W.P.

R

IS

ER

1' -9

W.P.

TRADE

ST1

C10X15.3

CH1

C4X5.4

GR11

PIPE1-14/ SCH40

11 2/

GR12

PIPE1-14/ SCH40

4TH FLOOR

CH3

C4X5.4

CH1

C4X5.4

GR11

PIPE1-14/ SCH40

GR12

PIPE1-14/ SCH40

CH3

C4X5.4

CH1

C4X5.4

GR11

ST1

C10X15.3

1' -9

1018/

1' -9

R

IS

ER

1ST FLOOR

2ND FLOOR

GROUND FL.

8/

15@6=7'-6

1' -9

1 1 2/

3'-112/

1'-6

1' -9

1' -9

1'-6 9916/

1'-

2'-

3 16/

3' -6

4'-31516/

15@6=7'-6

8/

1' -9

1' -9

3' -6

1'-11

2'-11 3

3'-0 13

4'-0 1

2'-112/

2 1 8/

1'-0

4'-31516/

1' -9

1'-11

2'-01316/

1'-0

8/

234/

15@6=7'-6

1' -9

2'-112/1'-03'-112/9

1' -9 1'-0

1'-6

2'-2716/ 2'-01316/ 1'

-9 1'

-9 1'

-9

11 2/

8/

1018/

2'-11 3

3'-0 13

4'-0 1

2 1 8/

1'-634/

1018/

1' -9

3'-0 13

4'-0 1

'-6

9' -6

9' -6

9' -6

8/ =

9' -6

File details come from the government source that posted it. Updated .