CONTRACT_CHANGE_ORDER.pdf

PDF 51 KB Posted

Attached to
CFD Training Facility Project
Solicitation number
IFB-2025-037
Issued by
Hamilton County, Indiana

About this file

This document is a Contract Change Order form from the City of Carmel, designed to formally document and authorize modifications to an existing contract. The form provides a standardized template for recording changes to contract price, contract time, and specific work items, with designated sections for describing the changes, documenting adjustments, and obtaining necessary approvals from the engineer, contractor, and city officials. While the specific project details are not filled in, the form is structured to comprehensively track contract modifications, including the financial impact and potential schedule adjustments resulting from the proposed changes. The document includes signature lines for the engineer, contractor, city council members, and city clerk, ensuring proper documentation and authorization of the contract change.

The form includes spaces to record the original contract price, the amount of increase or decrease from the change order, and the resulting new contract price. It also provides fields to track changes in contract time, including the original contract duration, net time adjustments, and the new projected completion date. The change order is designed to serve as a "full and final settlement of all direct, indirect, impact costs and time extensions" related to the specified changes, indicating that it is intended to comprehensively address all modifications to the original contract terms. The document is version-dated 2024-09-23, suggesting it is a recent template for managing contract modifications for the City of Carmel.

View the file

Other files

File Type Posted
CFD_Training_Facility_Project.pdf PDF
ERECTION_DRAWING_E20.pdf PDF
ERECTION_DRAWING_E19.pdf PDF
ERECTION_DRAWING_E18.pdf PDF
ERECTION_DRAWING_E17.pdf PDF
ERECTION_DRAWING_E16.pdf PDF
ERECTION_DRAWING_E15.pdf PDF
ERECTION_DRAWING_E14.pdf PDF
ERECTION_DRAWING_E13.pdf PDF
ERECTION_DRAWING_E12.pdf PDF
ERECTION_DRAWING_E11.pdf PDF
ERECTION_DRAWING_E10.pdf PDF
ERECTION_DRAWING_E9.pdf PDF
ERECTION_DRAWING_E8.pdf PDF
ERECTION_DRAWING_E7.pdf PDF
ERECTION_DRAWING_E6.pdf PDF
ERECTION_DRAWING_E5.pdf PDF
ERECTION_DRAWING_E4.pdf PDF
ERECTION_DRAWING_E3.pdf PDF
ERECTION_DRAWING_E2.pdf PDF
ERECTION_DRAWING_E1.pdf PDF
CFD_CTC_Whole_Parcel-1.png PNG image
CFD_CTC_Close_Up.png PNG image
CFD_CTC_Training_Tower_Location.png PNG image
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx DOCX document
MAINTENANCE_BOND.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
PAYMENT_BOND.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
PERFORMANCE_BOND.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
FIELD_ORDER.pdf PDF
MANUFACTURERS_LIST.pdf PDF
SUBCONTRACTORS_LIST.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF CARMEL

TO: CONTRACT CHANGE ORDER NO.:

DATE:

PROJECT NAME:

CITY REQ. NO.:

CITY PO NO.:

CITY PO DATE: _

I. You are directed to make the following changes in this Contract:

(Brief Description)

SCHEDULED ADJUSTMENT

ITEM AMOUNT (+) OR (-) DAYS

II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: ________ W.D.C. No.: _______ Other:_____________________________________________________________________

The changes result in the following adjustment of Contract Price and Contract Time:

Contract Price prior to this Change Order $_______________________ Contract Price will be increased/decreased by this Change Order $_______________________ New Contract Price including this Change Order $_______________________ Contract Time Prior to this Change Order ______ Days _______ Completion Date Net increased/decreased resulting from this Change Order_____ Days Current Contract Time including this Change Order_____ Days _______ Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work.

The Above Changes Are Recommended

The Above Changes Are Accepted:

Approved:

ENGINEER CONTRACTOR Laura Campbell, Presiding Officer

Address Address James Barlow, Member

Alan Potasnik, Member

City/State/Zip City/State/Zip Brad Pease, PE, City Engineer

By:

By:

ATTEST:

Phone:__________________ Phone:__________________ Jacob Quinn, Clerk

Date:___________________ Date:___________________ Date: _________________

Version 2024-09-23

File details come from the government source that posted it. Updated .