This document is a Tekla Structures architectural elevation drawing for the Carmel Fire Training facility, dated 10/13/2025. The technical drawing depicts a multi-story building with detailed floor plans and elevation views, showing measurements, floor heights, and structural components. The drawing includes precise measurements for each floor level, ranging from ground level (EL.+0") to the top floor at EL.+60'-0", with floor-to-floor heights of approximately 9'-6" to 10'-6". The elevation views show multiple structural elements including HSS (Hollow Structural Section) steel members, windows, doors, and splice locations across different floors.

The drawing provides comprehensive technical details for construction, with specific annotations for structural components like FR3 HSS4X2X1/8 members, pipe connections, and window placements. The design appears to be for a fire training facility, suggesting a specialized building meant for firefighter training purposes. The detailed technical specifications indicate a precise engineering approach, with careful attention to structural integrity, spatial relationships, and functional requirements of each floor level. The drawing is issued for approval and includes multiple views to provide a complete understanding of the building's structural and architectural configuration.

View the file

Other files

File Type Posted
CFD_Training_Facility_Project.pdf PDF
ERECTION_DRAWING_E19.pdf PDF
ERECTION_DRAWING_E4.pdf PDF
ERECTION_DRAWING_E8.pdf PDF
ERECTION_DRAWING_E1.pdf PDF
ERECTION_DRAWING_E10.pdf PDF
ERECTION_DRAWING_E11.pdf PDF
ERECTION_DRAWING_E15.pdf PDF
ERECTION_DRAWING_E17.pdf PDF
ERECTION_DRAWING_E20.pdf PDF
ERECTION_DRAWING_E5.pdf PDF
ERECTION_DRAWING_E7.pdf PDF
ERECTION_DRAWING_E12.pdf PDF
ERECTION_DRAWING_E14.pdf PDF
ERECTION_DRAWING_E16.pdf PDF
ERECTION_DRAWING_E18.pdf PDF
ERECTION_DRAWING_E2.pdf PDF
ERECTION_DRAWING_E3.pdf PDF
ERECTION_DRAWING_E6.pdf PDF
ERECTION_DRAWING_E9.pdf PDF
CFD_CTC_Close_Up.png PNG image
CFD_CTC_Training_Tower_Location.png PNG image
CFD_CTC_Whole_Parcel-1.png PNG image
6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx DOCX document
MAINTENANCE_BOND.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
MANUFACTURERS_LIST.pdf PDF
PAYMENT_BOND.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SUBCONTRACTORS_LIST.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
FIELD_ORDER.pdf PDF
PERFORMANCE_BOND.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Te kl a st ru ct ur es

10/13/2025A ISSUED FOR APPROVAL

REV DESCRIPTION DATE

DESCRIPTION

PROJECT NAME

DRAWN BY

DATE DRAWN

JOB No. DRG No.

ELEVATION

CARMEL FIRE TRAINING

ABC

10/10/2025 - E13

9 - 9 E1

5 - 5 E1

EL.+19'-0"

EL.+9'-6"

EL.+0"

EL.+28'-6"

EL.+38'-0"

EL.+47'-6"

EL.+47'-6"

EL.+0"

EL.+9'-6"

EL.+19'-0"

EL.+28'-6"

EL.+38'-0"

EL.+60'-0"

CONT. OUTER TO OUTER

CONT. INNER TO INNER

V.

I.F

V.

I.F

V.

I.F

CONT. INNER TO INNER

CONT. OUTER TO OUTERCONT. OUTER TO OUTER

CONT. INNER TO INNER

40'-0

FR3

HSS4X2X18/

3RD FLOOR

312/ 6'-0

5'-0

FR3

HSS4X2X18/

16'-812/

17'-212/

9' -6

39'-5

3' -2

2' -4

2ND FLOOR

C

FR1

HSS4X2X18/

GROUND FL

2'-91516/

2' -417'-212/

WINDOW

PIPE1-14/ SCH40

GR6

PIPE1-14/ SCH40

FR3

HSS4X2X18/

5'-0

PIPE1-14/ SCH40

312/

L OFSPLICE L OFSPLICE

C

L OFSPLICE

C

FR2

HSS4X2X18/

GR5

PIPE1-14/ SCH40

WINDOW

WINDOW

312/

WINDOW

WINDOW

FR3

HSS4X2X18/

DOORHMD1

HSS4X2X18/

5TH FLOOR

4TH FLOOR

4' -0

1ST FLOOR

1'-0

4' -0

2'-91516/ 1'-0

6'-1112/

9' -6

9' -6

9' -6

9' -6

5'-017'-212/312/

5'-0

312/ 17'-212/

2' -4

4' -0

3' -2

3' -2

2' -4

4' -0

3' -2

2' -2

7' -0

1' -1

4'

-0 3'

-4

212/39'-7212/

'-6

2' -1

GROUND FL

L OFSPLICE

7'-212/

FR10

HSS4X2X18/

4TH FLOOR

2 4

WINDOW

4' -0

7'-8

7'-212/

2' -1

WINDOW

5'-0

FR3

HSS4X2X18/

WINDOW

C

6'-0

FR3

HSS4X2X18/

2' -1

WINDOW

'-6

2' -4

312/

WINDOW

7'-212/

2' -4

4' -0

5'-0

2'-6

3' -2

WINDOW

2' -1

FR3

HSS4X2X18/

GR18

PIPE1-14/ SCH40

GR19

PIPE1-14/ SCH40

PIPE1-14/ SCH40

4' -0

L OFSPLICE

C

WINDOW

39'-7

WINDOW

9' -6

WINDOW

2' -1

WINDOW

DOOR

5'-0

FR3

HSS4X2X18/

40'-0

'-0

FR3

HSS4X2X18/

FR3

HSS4X2X18/

FR3

HSS4X2X18/

FR3

HSS4X2X18/

FR4

HSS4X2X18/

FR4

HSS4X2X18/

DET. 5

E17

HMD11

HSS4X2X18/

1ST FLOOR

2ND FLOOR

7'-212/

3RD FLOOR

5TH FLOOR

212/212/

1'-0 2'-91516/2'-91516/

4'-64'-62'-69'-812/

9' -6

9' -6

9' -6

9' -6

8'-0

2' -2

7' -0

2' -4

4' -0

4' -0

2' -4

4' -0

7'-212/5'-0

2' -4

4' -0

2' -1

2' -4

2' -1

7'-212/5'-0

2' -1

2' -1

2'

-4

5'-0 7'-212/5'-0

2' -4

4' -0

7'-212/5'-0

4' -0

2' -4

39'-5

4' -0

2' -4

2 312/

File details come from the government source that posted it. Updated .