ERECTION_DRAWING_E11.pdf
PDF 91 KB Posted
- Attached to
- CFD Training Facility Project
- Solicitation number
- IFB-2025-037
- Issued by
- Hamilton County, Indiana
About this file
This is an architectural elevation drawing for the Carmel Fire Training facility, created using Tekla Structures software and dated 10/10/2025. The drawing provides a detailed vertical cross-section of a multi-story building, showing floor elevations from ground level to 60 feet, with precise measurements and structural elements. The elevation includes various floor levels, doors (including overhead roll-up doors), and structural components such as HSS (Hollow Structural Section) tubes, pipes, and steel beams. The drawing indicates multiple floors with different heights and configurations, suggesting a complex multi-purpose training facility for fire personnel. Specific structural elements are labeled with codes like HMD9, FR6, and CH3, and the drawing includes detailed annotations for pipe sizes, door placements, and structural connections. The document is marked "ISSUED FOR APPROVAL" on 10/13/2025, indicating it is a preliminary design document for review and potential construction of a fire training facility.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
ELEVATION
CARMEL FIRE TRAINING
ABC
10/10/2025 - E11Te kl a st ru ct ur es
10/13/2025A ISSUED FOR APPROVAL
REV DESCRIPTION DATE
10 - 10 E1
6 - 6 E1
EL.+9'-6"
EL.+0"
EL.+38'-0"
EL.+47'-6"
EL.+0"
EL.+9'-6"
EL.+19'-0"
EL.+28'-6"
EL.+60'-0"
V.I.F.V.I.F.
V.I.F.
V.
I.F
CONT. INNER TO INNER CONT. INNER TO INNER
CONT. OUTER TO OUTER
CONT. OUTER TO OUTER CONT. OUTER TO OUTERCONT. OUTER TO OUTERCONT. OUTER TO OUTER
CONT. INNER TO INNER
CONT. OUTER TO OUTER
CONT. INNER TO INNER CONT. INNER TO INNER CONT. INNER TO INNER
1' -2
212/
GR4
PIPE1-14/ SCH40
312/17'-212/
OPENING
CL OF SPLICE L OF SPLICEC
PL38/ "X4
GR2
PIPE1-14/ SCH40
7' -0
GR1
PIPE1-14/ SCH40 GR3
PIPE1-14/ SCH40
DET. 7
E19
DET. 8
E19
DOOR
OVERHEAD
ROLL UP
1ST FLOOR
GROUND FL
3' -6
2'-2316/
1'-0 1'-0 21116/1'-6234/
1 2/ 9@
1' -0
=9 '-0
2/
36'-7916/ 1'-11716/
1'-0212/
5'-0
7' -0
HMD10
HSS4X2X18/
2'-4
GROUND FL
HMD9
HSS4X2X18/
3RD FLOOR
DOOR
7116/
4TH FLOOR
2'-4
7'-8
CH3
C4X5.4
DOOR
CH3
C4X5.4
7'-8
FR6
HSS4X2X18/
3'-0
8'-0
HMD9
HSS4X2X18/
7' -0
9' -6
GR15
PIPE1-14/ SCH40
7'-8
DOOR
FR6
HSS4X2X18/
GR14
3' -6
2'-4
FR10
HSS4X2X18/
DOOR
2'-4
8'-0
DOOR
HMD9
HSS4X2X18/
2' -2
5TH FLOOR
HMD11
HSS4X2X18/
1ST FLOOR
8'-0
2'-4
GR13
GR12
'-0
7116/
2'-4
2'-1058/
6'-0
DOOR
3'-0
FR6
HSS4X2X18/
DOOR
GR17
2ND FLOOR
434/
HMD11
HSS4X2X18/
3'-71116/
3' -6
DOOR
DOOR
DOOR
FR10
HSS4X2X18/
DOORDOOR
CH3
C4X5.4
GR12
3'-51116/ FR6
HSS4X2X18/
GR14
CH3
C4X5.4
3' -6
7' -0
3' -6
858/2'-1058/434/
3'-912/ 41316/
2'-1058/
'-6
9' -6
9' -6
9' -6
9' -6
2' -2
7' -0
2' -2
858/
434/3'-314/
3'-314/
7' -0
43'-0
8'-0
42'-4
8'-0
3'-0
2'-4
7'-8
8'-0
1'-06'-010
47'-8447'-87'-8
8'-0
7'-8
22 2 2 2 2
7'-8 7'-8
File details come from the government source that posted it. Updated .